Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Everest Export
(b)Name of the Company / Organisation SELF REGISTRATION
(c)Registered Address Everest Exports,184-A, Jajmau, Kanpur,Ahmedabad,Gujarat-208010
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Mansoor Ahmad
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Everest Exports,Kanpur Nagar,Uttar Pradesh-209862
(d)Pin code 209862
(e)E-mail director_consultancy@kkesindia.com
(f)Telephone No. 522-2447881
(g)Fax No. 05222447881
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity4(f)Leather/skin/hide processing industry
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/IND/83148/2019
(e)Master Proposal Number(Single Window) SW/224130/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No 1154 and 1402
(b)Pincode 209801
(c)Bounded Latitudes (North)
From
Degree 26
Minutes 28
Second 41.27
From
Degree 26
Minutes 28
Second 53.81
(d)Bounded Longitudes (East)
From
Degree 80
Minutes 27
Second 13.09
From
Degree 80
Minutes 27
Second 30.37
(e)Survey of India Topo Sheet No. 63B/6/7/10/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 117
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshUnnaoUnnaoBanthar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 195/Parya/SEAC/5292/2018
(b)Date of Apply of TOR 02 Dec 2019
(c)Date of Issue of TOR / Standard ToR 08 Jul 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :22 Oct 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Nov 2022
Distance of Public Hearing Venue from the Proposed Project :0
Public Hearing was held on 26.11.2022 at 11:00 A.M at the proposed project site at Plot No. 1154 & 1402 of Village Banthar, District Unnao.
State :Uttar Pradesh
District :Unnao
Tehsil :Unnao
Village :Banthar
83Public Hearing was held on 26.11.2022 at 11:00 A.M at the proposed project site at Plot No. 1154 & 1402 of Village Banthar, District Unnao under the panel headed by Sri Narendra Singh, Addition DistriOthersSri Narendra Singh, Addition District Magistrate (F/R) (ADM) Unnao
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Shaving machine2
(2.)Finishing machine4
(3.)Drying unit1
(4.)Retaining machine4
(5.)Setting machine4
(6.)Briquettes/Coal fired Boiler1capacity 5.0 T (03 T + 02 T)
(7.)Gen Set2capacity 350 KVA each
(8.)Wet blue drums10
(9.)Splitting machine2
(10.)Compressor2
(11.)Fleshing machine1
(12.)Wet blue sammying machine2
(13.)Dyeing fat liquoring drums5
(14.)Salt shaker1
(15.)Soaking drums4
(16.)Fleshing machine1
(17.)Retaining machine4
(18.)Setting machine4
(19.)Setting machine4
(20.)Liming drums6
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Finished Leather15OthersMT/DAYRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 6.09
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.10
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.24
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.39
(e) Funds Allocated for Environment Management Capital(%) 34.48
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 16
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 16
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw Hides16OthersMT/DAYNearby slaughter house and nearby areaRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2022 To 30 Apr 2022
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.634.3113.5580
(2.)NOxMicro Gram per Meter Cube20.289.1620.2280
(3.)PM10Micro Gram per Meter Cube90.5854.5989.92100
(4.)PM2.5Micro Gram per Meter Cube58.1334.2157.9360
(5.)OthersCOMili Gram per Meter Cube1.040.451.034
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsLeadmg/l0.00.00.010.01
(2.)pHmg/l7.787.206.50
(3.)Fluoridemg/l0.580.261.01.5
(4.)TDSmg/l6803705002000
(5.)Total Hardnessmg/l289154200600
(6.)Chloridesmg/l11287.102501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l1.61.0A
(2.)pHmg/l7.367.19A
(3.)CODmg/l296172A
(4.)BODmg/l11062A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))45.236.845
(2.)Leq(Day)A-weighted decibels(dB(A))58.650.755
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.817.35
(2.)Electric ConductivityOthersµmhos/cm589397
(3.)P(Phosphorus)Milligram per Kilogram12.8010.60
(4.)K(Potassium)Milligram per Kilogram241.8076.50
(5.)N(Nitrogen)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.15 To 14.13
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 13.33
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater5080.0Copy of Permission LettermodeOthersBorewellsOthersBorewells001 Feb 20230
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industry448500ETP/RO/CHROMEDischarge into Surface Water Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant,OthersEvaporated213235
16.1.
(a)Total Waste Water Generation 448
(b)Total Discharged Water 235
(c)Total Reused Water 213
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal WasteMunicipal Solid Waste60Tons0.0OthersCompostedOthersComposted
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube58.1300.058.1360
(2.)PM10Microgram per Meter Cube90.580.2990.8991.47100
(3.)NOxMicrogram per Meter Cube17.680.2990.3318.0180
(4.)SO2Microgram per Meter Cube9.760.2990.129.8880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)STACKBRIQUETTERS/COAL320.90PM10,SO2,NOx
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 700
(b)Source Madhyanchal Vidyut Nigam Ltd. UP
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Standby 350 KVA DG (2) sets
(e)Stack Height (in m) 32
20.
Land Ownership Pattern:
(a)Forest Land 0.0
(b)Private Land 1.8
(c)Government Land 0.0
(d)Revenue Land 0.0
(e)Other Land 0.0
    Total Land 1.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0.0
(b)Waste/Barren Land 0.0
(c)Grazing/ Community Land 0.0
(d)Surface Water Bodies 0.0
(e)Settlements 0.0
(f)Industrial 1.8
(g)Forest 0.0
(h)Mangroves 0.0
(i)Marine Area 0.0
(j)Others : 0.0 0.0
    Total 1.8
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersEverest Exports-Leather Unit1.8Everest Exports-Leather Unit
Total 1.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNOT Applicable0.0Not Applicable
(2.)ESZsNOT Applicable0.0Not Applicable
(3.)Wildlife CorridorsNOT Applicable0.0Not Applicable
(4.)NPANOT Applicable0.0Not Applicable
(5.)Critically Polluted AreaNOT Applicable0.0Not Applicable
(6.)WLSNOT Applicable0.0Not Applicable
(7.)CorridorsNOT Applicable0.0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersN/AN/A0.0N/A
(2.)ForestN/A0N/A
(3.)Archaeological SitesN/A0N/A
(4.)Defence InstallationsN/A0N/A
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired N/A
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area GANGA
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 250
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 50
(e)No. of working days 365
(f)Total Manpower 450
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.6
(b)Percentage of Total Project Area 33.33
(c)No. of Plants to be Planted 75
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(2.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(3.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(4.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(5.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(6.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(7.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(8.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(9.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(10.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(11.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(12.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(13.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(14.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
(15.)SocialIndustrial development and consequent economic development should lead to improvement of environment through better living and greater social awareness. On the other hand, the proposed project is li
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/IA0086
(ii)Name of the EIA Consultant GREEN ENVIRO ENGINEERS PVT LTD
(iii)Address PLOT NO.316 AWADHPURI VIKAS NAGAR NEAR SALE TAX OFFICE KANPUR UTTAR PRADESH 208024
(iv)Mobile No. 9670557744
(v)Landline No. 9670557744
(vi)Email Id dwivedihariom@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 20 Sep 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMansoor Ahmad
DesignationPartner
Name of Company (Applicant Name should not be given here)SELF REGISTRATION
AddressEverest Exports