Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Enhancement in Production of Iron ore from 0.5 million TPA to 1 million TPA ROM & setting up two mobile crushing units of 150 TPH each & two mobile screening units of 150 TPH each in Raikela Iron Ore Mines over an area of 45.932 ha. of M/s National Enterprises in village- Raikela under Tehsil- Koida, Subdivision- Bonai in Sundargarh district of Odisha
(b)Name of the Company / Organisation NATIONAL ENTERPRISES
(c)Registered Address At/Post- Barbil,,Keonjhar,Orissa-758035
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Charanjit Singh Grewal
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address At/Post- Barbil,Keonjhar,Orissa-758035
(d)Pin code 758035
(e)E-mail gapl2019@yahoo.com
(f)Telephone No. 6767-275686
(g)Fax No. 275631
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/OR/MIN/51761/2020
(e)Master Proposal Number(Single Window) SW/290422/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. It is in Supplementary Lease deed, which is attach
(b)Pincode 770048
(c)Bounded Latitudes (North)
From
Degree 21
Minutes 52
Second 46.7
From
Degree 21
Minutes 53
Second 6.40
(d)Bounded Longitudes (East)
From
Degree 85
Minutes 10
Second 58.98
From
Degree 85
Minutes 11
Second 25.69
(e)Survey of India Topo Sheet No. 73G/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 823.7
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSundargarhKoidaRaikela
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 51761/19-MINB1/02-2020
(b)Date of Apply of EC 29 Feb 2020
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Sep 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Oct 2021
Distance of Public Hearing Venue from the Proposed Project :0.7
Raikela Football Ground
State :Orissa
District :Sundargarh
Tehsil :Koida
Village :Raikela
100Peripheral Development, Medical Facility, Education Facility, Road DevelopmentOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 109-70/22/ EPE
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)IRON ORE0.50.51OthersMillion TPARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Iron Ore0.5 million TPA0.5 million TPA1.0 million TPARoad
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 26 Mar 2018
(iv)Valid Upto 31 Mar 2023
(v)File No. 3467/IND-I-CON-2272
(vi)Application No. 2009108
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 31.87
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.25
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.40
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.52
(e) Funds Allocated for Environment Management Capital(%) 7.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 900
(b)Existing quantity of raw material/fuel 900
(c)Total quantity of raw material/fuel 1800
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD1800OthersKLTensaOthersFuel Tankers3 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2019 To 29 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube24.911.824.880
(2.)SO2Micro Gram per Meter Cube14.76.513.980
(3.)PM2.5Micro Gram per Meter Cube43.631.943.560
(4.)PM10Micro Gram per Meter Cube81.769.081.2100
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l6256200600
(2.)Fluoridemg/l0.50.511.5
(3.)TSSmg/l0000
(4.)TDSmg/l83.880.65002000
(5.)pHNA7.527.426.58.5
(6.)Heavy MetalsIronmg/l0.140.080.30.3
(7.)Chloridesmg/l12.910.92501000
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.46.0C
(2.)BODmg/l2.21.8C
(3.)CODmg/l00C
(4.)pHNA7.377.16C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))42.436.170
(2.)Leq(Day)A-weighted decibels(dB(A))70.742.875
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.185.62
(2.)N(Nitrogen)Kilogram per hectare336298
(3.)K(Potassium)Kilogram per hectare129.4124.7
(4.)Electric ConductivityMillisiemens per Centimetre119.6106.8
(5.)P(Phosphorus)Kilogram per hectare30.427.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 520 To 520
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 523 To 523
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface454Copy of Permission LettermodeOthersBy water tankerOthersPumped into water tanker202009184100016018 Sep 202045
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3.23.2Soak PitOthersSoak Pit3.20
16.1.
(a)Total Waste Water Generation 3.2
(b)Total Discharged Water 0
(c)Total Reused Water 3.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OverburdenOthersOverburden949122Tons0OthersBy dumperOthersdumped
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00000
(2.)PM10Microgram per Meter Cube79.816.7886.58100
(3.)NOxMicrogram per Meter Cube24.812.6827.4880
(4.)SO2Microgram per Meter Cube14.513.2117.7180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD50.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x1000 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land 43.87
(b)Private Land 2.062
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 45.932
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 45.932
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 45.932
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OB Dump Area2.5
(2.)Green belt3.065
(3.)Quarry Area26.475
(4.)OthersUntouched Area0.327
Total 32.367
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0NA
(2.)ESAsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)NPANA0NA
(5.)CorridorsNA0NA
(6.)WLSNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSarkanda R.F.2.7South Direction
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 30.550
(b)Land yet to be acquired(Ha) 15.382
(c)Status of Land acquisition if not acquired Court Case going on
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Asiatic Elephant & Sloth Bear
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs 214.39 lakhs
(iii)Period of Implementation 10 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 4487/1WL (C)SSP-148/2011
(iii)Date of issue 05 Jun 2014
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Samij nala
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 64
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 64
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.730.66731
(2.)Percentage of Total Project Area3.766.869
(3.)No. of Plants42508051884768
(4.)Funds Allocated60000080000008600000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)OthersThe expansion of mining project in the locality helps in improvement of the physical infrastructure like roads, vehicles for public transportation, water and sanitation facility, house and rest shed f
(2.)OthersThe expansion of mining project in the locality helps in improvement of the physical infrastructure like roads, vehicles for public transportation, water and sanitation facility, house and rest shed f
(3.)OthersThe expansion of mining project in the locality helps in improvement of the physical infrastructure like roads, vehicles for public transportation, water and sanitation facility, house and rest shed f
(4.)EnvironmentalThe expansion of mining project in the locality helps in improvement of the physical infrastructure like roads, vehicles for public transportation, water and sanitation facility, house and rest shed f
(5.)EnvironmentalPlantation Development Plan
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Iron OreMajor
2.
Mine Capacity in ROM (Run of Mine) 1
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. MRMP/A/38-ORI/BHU/2019-20
(b)Date of Approval 07 Jan 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 45.932
(f)Approved Capacity 1
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 13706110
(b)Mineable Reserves (Million Ton) 10114108
(c)Extractable Reserves(Million Ton) 10114108
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 55
(f)Stripping Ratio 1 : 0.17
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Not Applicable
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)1300
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 45.932
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 21 Dec 1983
(iii)Validity of LOI 50
(iv)Reference No. of LOI Supplementary Lease Deed was executed on 21.07.201
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 45.932
(iii)Validity of the lease deed From : 21 Dec 1983 To : 20 Dec 2033
(iv)Date of Execution of Mining Lese 21 Jul 2016
(v)Reference Number Supplementary Lease Deed was executed on 21.07.201
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not Applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 2.5
(iii)Height (in meter) 53
(iv)Quantity (in Million Cubic meter) 949122
(v)No. of year back fill up 3
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 26.475
(b)Depth (in meter) 16
(c)Volume (in Million Cubic meter) 0.73
12.
Details of Quarry:
(a)Final Void of 26.475 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 26.475
13.
Details of Transportation:
(a)In Pit/Underground to Surface 28 ton
(b)Surface to Siding/Loading tippers & dumpers
(c)Transportation / Conveyor Details tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND43.87043.87
(2.)SURFACE WATER BODIES000
(3.)SETTLEMENTS000
(4.)OTHERS(Specify)Other2.06202.062
(5.)AGRICULTURE LAND000
(6.)WASTE LAND000
(7.)GRAZING LAND000
TOTAL45.932045.932
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0000
(2.)BUILT UP AREA (COLONY/OFFICE)000.280.28
(3.)EXCAVATION/QUARRY26.4750026.475
(4.)ROADS000.780.78
(5.)INTERNAL OB DUMPS0000
(6.)VIRGIN AREA0.327000.327
(7.)GREEN BELT3.065003.065
(8.)EXTERNAL OB DUMPS2.500002.5
TOTAL32.36701.06033.427
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 5
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 26.475
(d)Safety Zone(in hectare) 3.065
(e)Final Void of 26.475 (hectare) at a Depth of 16 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 32.367
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan No
Total Area Excavated (in hectare) 19.42
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2007250002500025000363627.0900
(2.)199300011692.8810
(3.)19950005569.0000
(4.)199825000250002500011667.1100
(5.)19992500025000250009007.3700
(6.)20002500025000250003353.9000
(7.)2002250002500025000810.8000
(8.)200525000250002500035455.3860
(9.)2006250002500025000205809.6260
(10.)2008250002500025000195514.8500
(11.)2010420004200042000394300.000
(12.)2012502200502200502200497112.000
(13.)2013502200502200502200439646.000
(14.)2014502200502200502200499700.000
(15.)2015502200502200502200499500.000
(16.)2017502200502200502200291540.000
(17.)2020502200502200502200499260.000
(18.)19940004166.0000
(19.)200125000250002500000
(20.)199100036194.2200
(21.)199200018293.9230
(22.)200325000250002500018554.8400
(23.)2011502200502200502200298000.000
(24.)19962500025000250009200.000
(25.)2016502200502200502200499550.000
(26.)200425000250002500042880.3800
(27.)2009420004200042000398700.000
(28.)2019502200502200502200499961.000
(29.)19972500025000250008421.000
(30.)201850220050220050220050000.000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Orissa
(d)Case No. 13846/2014 26000/2017
(e)Orders/Directions of the court ,if any and its relevance with the proposed project NA
(f)Case Details Lease area dispute
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 0126
(ii)Name of the EIA Consultant CEMC Pvt. Ltd.
(iii)Address Plot No. 522/3458, Pahal, Bhubaneswar-752101, Odisha
(iv)Mobile No. 9861032826
(v)Landline No. 0674236034
(vi)Email Id cemc_consultancy@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 Mar 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)04/11/2022Upload a legible copy of certified compliance report. Submit scrutiny fees as applicable for the project. Comply & resubmit application.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantCharanjit Singh Grewal
DesignationProprietor
Name of Company (Applicant Name should not be given here)NATIONAL ENTERPRISES
AddressAt/Post- Barbil