1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) JAMONYA JOHAR MURUM QUARRY OF SHRI VEER VIKRAM SINGH
(b)Name of the Company / Organisation SHRI VEER VIKRAM SINGH
(c)Registered Address R/o- Bhanu Palace, Tehsil- Narsinghgarh, District- Rajgarh, M.P.,,Rajgarh,Madhya Pradesh-465669
(d)Legal Status of the Company Individual
2.
Address for the correspondence:
(a)Name of the Applicant Veer Vikram Singh
(b)Designation (Owner/ Partner/ CEO) Lease Owner
(c)Address R/o- Bhanu Palace, Tehsil- Narsinghgarh, District- Rajgarh, M.P.,,Narsinghgarh,Rajgarh,Madhya Pradesh-465669
(d)Pin code 465669
(e)E-mail vs02102021@gmail.com
(f)Telephone No. 120-4213298
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/MP/MIN/68109/2021
(e)Master Proposal Number(Single Window) SW/289631/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 507/2
(b)Pincode 465669
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 37
Second 4.35
From
Degree 23
Minutes 37
Second 8.43
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 1
Second 43.06
From
Degree 77
Minutes 1
Second 48.94
(e)Survey of India Topo Sheet No. 55E/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.53
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshRajgarhNarsinghgarhJamonya Johar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 8934/2022
(b)Date of Apply of TOR 19 Jan 2022
(c)Date of Issue of TOR / Standard ToR 04 Mar 2022
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 May 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :24 Jun 2022
Distance of Public Hearing Venue from the Proposed Project :0.05
Adjacent to Mine Site
State :Madhya Pradesh
District :Rajgarh
Tehsil :Narsinghgarh
Village :Jamonya Johar
41The details are given in chapter 7 in Table 7.1 of Final EIA ReportOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Water Pump 05 HP1
(2.)Dumper6Hire basis
(3.)Water tanker1Hire basis
(4.)Wheel Loader/JCB/Excavator1Hire basis
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Murum25050OthersCum/yearRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.30
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.1029350
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0524485
(e) Funds Allocated for Environment Management Capital(%) 34.31
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel based machines will be used by Hired Basis.45000Otherslitre/annumothersRoad5.67 OthersNearby Petrol PumpCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2021 To 28 Feb 2022
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube41294160
(2.)SO2Micro Gram per Meter Cube1761780
(3.)NOxMicro Gram per Meter Cube30123080
(4.)PM10Micro Gram per Meter Cube664666100
(5.)OthersCOMili Gram per Meter Cube0.790.260.7802
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.516.726.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l3782695002000
(4.)Chloridesmg/l62242501000
(5.)Heavy MetalsIronmg/l0.0010.0010.10.3
(6.)Total Hardnessmg/l177102200600
(7.)Fluoridemg/l0.680.2311.5
    14.3.     No. of Surface Water Monitoring Locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.517.13A
(2.)DOmg/l6.45.2A
(3.)BODmg/l7.46.9A
(4.)CODmg/l2922A
    14.4.     No. of Ambient Noise Monitoring Locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.737.455
(2.)Leq(Day)A-weighted decibels(dB(A))53.440.565
    14.5.     No. of Soil Sample Monitored Locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Othersmg/100gm20.4018.40
(2.)K(Potassium)Othersmg/100gm0.980.54
(3.)Electric ConductivityOthersMicro mhos/cm378315
(4.)P(Phosphorus)Othersmg/100gm0.890.81
(5.)pH7.627.15
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 45 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPrivate Water tanker3.6092.49Copy of Permission LettermodeOthersRoadOthersPrivate Water tanker0.00.000017 Aug 20223.609
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste Water1.0750Septic tankOthersSoak Pit1.0750
16.1.
(a)Total Waste Water Generation 1.075
(b)Total Discharged Water 0
(c)Total Reused Water 1.075
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic WasteMunicipal Solid Waste2.28Tons0OthersSeptic tankOthersSoak Pit
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube6602.00468.004100
(2.)PM2.5Microgram per Meter Cube4101.2042.2060
(3.)NOxMicrogram per Meter Cube000080
(4.)SO2Microgram per Meter Cube000080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5
(b)Source MP Electricity Distribution Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 2.0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 2.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 20900
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 6600
(d)Surface Water Bodies 100
(e)Settlements 100
(f)Industrial 0
(g)Forest 3600
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Perennial Land 100
    Total 31400
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area1.49Pit Area
(2.)Green belt0.41Plantation
(3.)OthersUntouched Area0.1Non-mining Area
Total 2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0As per CPCB Guideline (MP) (Matter of O.A. No. 1038/2018 (CEPI Matter))
(2.)WLSNone0As per DFO Letter
(3.)NPANarsinghgarh Wild Life Sanctuary1.48As per DFO Letter
(4.)ESZsNone0As per DFO Letter
(5.)Wildlife CorridorsNone0None Within 10 km Radius
(6.)CorridorsNone0None Within 10 km Radius
(7.)ESAsNone0None Within 10 km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites000
(2.)Defence Installations000
(3.)OthersReserved ForestDevgarh4.0NE direction
(4.)ForestKotada & Narsinghgarh1.71NE direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.53
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 2
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 17
(e)No. of working days 300
(f)Total Manpower 19
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.41
(b)Percentage of Total Project Area 20.50
(c)No. of Plants to be Planted 2400
(d)Funds Allocated for Plantation 447300
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)MurumMinor
2.
Mine Capacity in ROM (Run of Mine) 136761
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Kr. 14361/Mining Plan Cell-02/N.K.160/2021
(b)Date of Approval 18 Oct 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Director Geology and Mines, Bhopal
(e)Approved Mining Lease Area 2.0
(f)Approved Capacity 25050
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.404
(b)Mineable Reserves (Million Ton) 0.259
(c)Extractable Reserves(Million Ton) 0.047
(d)Percent(%) of Extraction 18.14
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 2.0
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 31 Aug 2021
(iii)Validity of LOI 10
(iv)Reference No. of LOI 1049/Khanij/2021
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After grant EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof None
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.002086
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.002086
11.
Details of Final Mine Void:
(a)Area (in Hectare) 2.0
(b)Depth (in meter) 15
(c)Volume (in Million Cubic meter) 0.2235
12.
Details of Quarry:
(a)Final Void of 1.49 (hectare) at a Depth of 15 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 2.0
13.
Details of Transportation:
(a)In Pit/Underground to Surface hydraulic Excavator
(b)Surface to Siding/Loading JCB/Loader
(c)Transportation / Conveyor Details Dumper/Tractor
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND02090020900
(2.)FOREST LAND036003600
(3.)WASTE LAND000
(4.)SURFACE WATER BODIES0100100
(5.)OTHERS(Specify)Perennial Land0100100
(6.)SETTLEMENTS0100100
(7.)GRAZING LAND066006600
TOTAL03140031400
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)OtherUntouched Area000.10.1
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)VIRGIN AREA0000
(6.)EXTERNAL OB DUMPS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)EXCAVATION/QUARRY01.4901.49
(9.)GREEN BELT0.41000.41
TOTAL0.411.490.102
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 2.0
(d)Safety Zone(in hectare) .41
(e)Final Void of 1.49 (hectare) at a Depth of 15 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1200
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.41
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0048
(ii)Name of the EIA Consultant ASERIES ENVIROTEK INDIA PVT . L TD
(iii)Address Khasra No. 973 (Part), Sainik Vihar Phase-II, Near CRPF Camp Gate No. 2, Bijnaur , Sarojini Nagar , Lucknow (UP)-226008
(iv)Mobile No. 9990366186
(v)Landline No. 0522711873
(vi)Email Id aseriess.envirotek@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 01 Dec 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)06/09/2022cases consider for prior EC. After approval of New DSR.
(2.)08/09/2022The correction have been made as per the instruction received
(3.)13/09/2022Proposal for EC shall be accepted only after the approval of New DSR
(4.)01/10/2022The correction have been made as per the instruction received
(5.)12/10/2022As per previous EDS Proposal for EC shall be accepted only after the approval of New DSR
(6.)21/10/2022The correction have been made as per the instruction received
(7.)29/10/2022kindly remove sand DSR from annx.
(8.)29/10/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)07/11/2022Copy EnclosedADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVeer Vikram Singh
DesignationLease Owner
Name of Company (Applicant Name should not be given here)SHRI VEER VIKRAM SINGH
AddressR/o- Bhanu Palace, Tehsil- Narsinghgarh, District- Rajgarh, M.P.