Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PROPOSED COMMON BIO-MEDICAL WASTE TREATMENT FACILITY At Village –Kumraua, Block – Soron, Tehsil & District- Kasganj (Uttar Pradesh),
(b)Name of the Company / Organisation INDO TECH WASTE SOLUTION
(c)Registered Address Kheri Road, Shop No-2, Sector-98,,Faridabad,Haryana-121002
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Raman Katnoria
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Kheri Road, Shop No-2, Sector-98,,Faridabad,Faridabad,Haryana-121002
(d)Pin code 121002
(e)E-mail raman.katnoria2020@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(d)(a)Common Bio-Medical Waste Treatment Facility
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/MIS/60737/2021
(e)Master Proposal Number(Single Window) SW/284813/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra No-1161
(b)Pincode 207123
(c)Bounded Latitudes (North)
From
Degree 27
Minutes 57
Second 28.14
From
Degree 27
Minutes 57
Second 30.85
(d)Bounded Longitudes (East)
From
Degree 78
Minutes 36
Second 33.70
From
Degree 78
Minutes 36
Second 36.09
(e)Survey of India Topo Sheet No. 45I/9 and 53L/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 177
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 6.06
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshKasgangNo DataKumraua
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 6191
(c)Date of Apply of TOR 12 Feb 2021
(d)Date of Issue of TOR / Standard ToR 11 Jun 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 May 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Jun 2022
Distance of Public Hearing Venue from the Proposed Project :15
Collectorate Sabhagar
State :Uttar Pradesh
District :Kasgang
Tehsil :No Data
Village :Kasganj
49Pollution, CSR & Local EmploymentDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Incinerator200 kg/hr
(2.)Autoclave2500 ltr/hr
(3.)Shredder150 kg/hr
(4.)Effluent Treatment Plant5 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bio-medical Waste2OthersTonnes Per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.72
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.43
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.034
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.164
(e) Funds Allocated for Environment Management Capital(%) 25.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD100Othersltr/hrLocal MarketRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.705.7215.6980
(2.)PM10Micro Gram per Meter Cube96.2546.8694.81100
(3.)OthersCOMili Gram per Meter Cube1.020.341.014
(4.)NOxMicro Gram per Meter Cube19.219.3918.6380
(5.)PM2.5Micro Gram per Meter Cube47.2125.8346.4460
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.296.966.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l7062085002000
(4.)Total Hardnessmg/l388144200600
(5.)Chloridesmg/l74162501000
(6.)Heavy MetalsIronmg/l0.180.100.30.3
(7.)Fluoridemg/l0.50.311.5
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.297.11A
(2.)BODmg/l2.51.9B
(3.)CODmg/l8.38.3B
(4.)OthersFluoridemg/l0.20.2A
(5.)DOmg/l7.87.0A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.849.775
(2.)Leq(Night)A-weighted decibels(dB(A))39.035.770
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare42.630.2
(2.)K(Potassium)Kilogram per hectare148.3105.7
(3.)Electric ConductivityMillisiemens per Centimetre456289
(4.)N(Nitrogen)Kilogram per hectare138.0100.3
(5.)pH8.567.69
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.11 To 10.24
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.58 To 9.79
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersExternal Tankers & Bore Well55 Not Appliacble modeOthersExternal Tankers & Bore WellOthersExternal Tankers & Bore WellCGWA NOC Application No- KSGJ0722RIN000112 Jul 20225
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Use2.05Effluent Treatment PlantOthersSoak Pit/Septic Tank02.0
(2.)Boiler Blow Down0.085Effluent Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant0.08
(3.)Floor, Vehicle, wheel Washing, Water Sprinkling1.95Effluent Treatment PlantGreen Belt Renewal Plant1.9
16.1.
(a)Total Waste Water Generation 3.98
(b)Total Discharged Water 2
(c)Total Reused Water 1.98
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from IncineratorHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18.25Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Sludge from ETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)109.5Kilolitre0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube94.810.30.395.11100
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube15.690.31.517.1980
(4.)NOxMicrogram per Meter Cube18.630.32.921.5380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)IncineratorHSD300.85PM100.42
(2.)IncineratorHSD300.85SO21.53
(3.)IncineratorHSD300.85NOx3.12
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 62
(b)Source Dakshinanchal Vidyut Vitran Nigam Ltd (DHVVNL)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 62.5 kVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.408
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.408
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 15283.46
(b)Waste/Barren Land 12439.44
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 909.21
(e)Settlements 1362.65
(f)Industrial 0
(g)Forest 1462.91
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 31457.670000000002
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.1347
(2.)Main Plant0.1165Autoclave, Shredder & Incinerator Area etc..
(3.)OthersRoad Area, Open Area & ETP Area0.1569
Total 0.4081
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone in 10Km Radius0None
(2.)ESAsNone in 10Km Radius0None
(3.)Wildlife CorridorsNone in 10Km Radius0None
(4.)ESZsNone in 10Km Radius0None
(5.)CorridorsNone in 10Km Radius0None
(6.)Critically Polluted AreaNone in 10Km Radius0None
(7.)NPANone in 10Km Radius0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone in 10Km Radius0None
(2.)Defence InstallationsNone in 10Km Radius0None
(3.)ForestMalpur Reserved Forest6.31North
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.408
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.31
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 18
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 24
(e)No. of working days 365
(f)Total Manpower 57
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1348
(b)Percentage of Total Project Area 330392.16
(c)No. of Plants to be Planted 107
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal Employment, Direct & Indirect employment opportunities
(2.)FinancialRevenue from Waste
(3.)EnvironmentalGreenbelt Development, Proper segregation of Bio-medical Waste. Scientific Treatment & Disposal of Bio-medical waste without any contamination
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 4
(d)Total plot area (sqm) 4081
(e)Total built up area (sqm) 831
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 3
    Capacity 67.5
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 155 Sq. Meter
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs shall be used for Street lights
(b)Percentage 10
(c)Quantity 20
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact on water bodies as ZLD has been proposed
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/RA0216
(ii)Name of the EIA Consultant WOLKEM INDIA LIMITED
(iii)Address E-101 to 102, Mewar Industrial Area,Madri, Udaipur 313 003
(iv)Mobile No. 7737716644
(v)Landline No. 0294249460
(vi)Email Id info.wcs@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 05 Feb 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)25/07/2022Please submit the attached affidavit along with the application for TOR/EC on parivesh portalEDS Letter
(2.)01/08/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)23/09/2022Please submit the information/clarification as directed by SEAC in its meeting dated 07/09/2022. The minutes of the said meeting is available on the website www.environmentclearance.nic.in and seiaaup.in
(2.)26/09/2022ADS query replied as per 683rd SEAC-1 Meeting held on 07.09.2022 for Proposed Common Bio-medical Waste Treatment Facility at Village- Kumraua, Block- Soron, District- Kasganj, Uttar Pradesh.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRaman Katnoria
DesignationPartner
Name of Company (Applicant Name should not be given here)INDO TECH WASTE SOLUTION
AddressKheri Road, Shop No-2, Sector-98
Print