Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) River Sand Mining Project of Mahendra Singh Ratnawat
(b)Name of the Company / Organisation MS MAHENDRA SINGH RATNAWAT
(c)Registered Address 53, Golimar Garden, Sahkar Marg, Jaipur, Rajasthan,,Jaipur,Rajasthan-302001
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Mahendra Singh Ratnawat
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address 53, Golimar Garden, Sahkar Marg, Jaipur, Rajasthan,,Phagi,Jaipur,Rajasthan-302001
(d)Pin code 302001
(e)E-mail msrphagi@gmail.com
(f)Telephone No. 141-4019077
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/80748/2013
(e)Master Proposal Number(Single Window) SW/283429/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Plan enclosed
(b)Pincode 303005
(c)Bounded Latitudes (North)
From
Degree 26
Minutes 26
Second 51.40
From
Degree 26
Minutes 43
Second 58.10
(d)Bounded Longitudes (East)
From
Degree 75
Minutes 12
Second 55.20
From
Degree 75
Minutes 46
Second 5.7
(e)Survey of India Topo Sheet No. 45N/6, N/7, N/10,N/11,N/14, N/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 458
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJaipurPhagiRevenue village of tehsil Phagi
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/253/2013-IA.II(M)
(b)Date of Apply of TOR 24 Jul 2013
(c)Date of Issue of TOR / Standard ToR 17 Oct 2013
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Dec 2015
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Jan 2016
Distance of Public Hearing Venue from the Proposed Project :2
Sub divisional Office Phagi
State :Rajasthan
District :Jaipur
Tehsil :Phagi
Village :Phagi
70Employment, Drinking Water Facility, Green belt developmentOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Excavator150.9 to 1.2m
(2.)Water Tanker54000 liter
(3.)Pay Loader JCB2-
(4.)Light Vehicle4-
(5.)Tippers2520 Tonne
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bajri/Sand1400000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.75
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.02
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.20
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 19.36
(e) Funds Allocated for Environment Management Capital(%) 2.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD210OthersKilo liter per AnnumPetrol PumpRoad4 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2013 To 31 Dec 2013
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube10869.1106.6100
(2.)SO2Micro Gram per Meter Cube8.87.028.3680
(3.)NOxMicro Gram per Meter Cube2621.9025.8380
(4.)PM2.5Micro Gram per Meter Cube00060
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l1.80.711.5
(2.)pHNA7.97.16.58.5
(3.)Total Hardnessmg/l526408200600
(4.)TSSmg/l181200
(5.)Chloridesmg/l3622262501000
(6.)Heavy MetalsnaNA0000
(7.)TDSmg/l12026955002000
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.5C
(2.)DOmg/l6.55.8C
(3.)BODmg/l2216C
(4.)CODmg/l7264C
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.850.765
(2.)Leq(Night)A-weighted decibels(dB(A))52.341.255
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram2216
(2.)K(Potassium)Milligram per Kilogram2817
(3.)P(Phosphorus)Milligram per Kilogram3226
(4.)pH7.787.26
(5.)Electric ConductivityMillisiemens per Centimetre309177
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersWater Tanker252 Not Appliacble modeOthersWater TankerOthersWater TankerNA19 Apr 202225
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste34Septic tank followed bysoak pitOtherssoak pit03
16.1.
(a)Total Waste Water Generation 3
(b)Total Discharged Water 3
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domertic WasteMunicipal Solid Waste600Tons2RoadOthersMuncipal site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube000060
(2.)PM10Microgram per Meter Cube10801.1108.1100
(3.)NOxMicrogram per Meter Cube2601.02780
(4.)SO2Microgram per Meter Cube7.0200.87.8280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 1329.983
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1329.983
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1329.983
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 1329.983
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area1329.9830
Total 1329.983
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA00
(2.)ESAsNA00
(3.)ESZsNA00
(4.)CorridorsNA00
(5.)Wildlife CorridorsNA00
(6.)NPA000
(7.)Critically Polluted AreaNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Archaeological SitesNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pea fowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Project itself a River Bed Mining Project
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bandi, Mashi
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 102
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 102
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 26.4
(b)Percentage of Total Project Area 1.98
(c)No. of Plants to be Planted 13200
(d)Funds Allocated for Plantation 720000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen belt development
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Bajri/SandMajor
2.
Mine Capacity in ROM (Run of Mine) 1400000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. SME/JP/M.PLAN/BAJRI/P-441/13/6170
(b)Date of Approval 20 Nov 2014
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 1329.983
(f)Approved Capacity 1400000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 55860000
(b)Mineable Reserves (Million Ton) 48520000
(c)Extractable Reserves(Million Ton) 48520000
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 0 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1329.983
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 05 Mar 2013
(iii)Validity of LOI 5
(iv)Reference No. of LOI P7(13)Khan/Group-2/2013
(c)Whether Lease Deed Executed ? No
(i)Reason thereof LOI Granted
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof LOI Granted
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1329.983
(b)Depth (in meter) 3
(c)Volume (in Million Cubic meter) 39.89
12.
Details of Quarry:
(a)Final Void of 1329.983 (hectare) at a Depth of 3 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1329.983
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumper/Tipper
(b)Surface to Siding/Loading Dumper/Tipper
(c)Transportation / Conveyor Details Truck
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND1329.98301329.983
(2.)SURFACE WATER BODIES000
(3.)AGRICULTURE LAND000
(4.)FOREST LAND000
(5.)GRAZING LAND000
(6.)SETTLEMENTS000
TOTAL1329.98301329.983
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0166.670166.67
(2.)TOP SOIL STORAGE0000
(3.)VIRGIN AREA001046.0331046.033
(4.)OtherBridge & Wels0037.0837.08
(5.)GREEN BELT550055
(6.)ROADS0025.225.2
(7.)EXTERNAL OB DUMPS0000
(8.)INTERNAL OB DUMPS0000
(9.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL55166.671108.31301329.983
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 1329.983
(d)Safety Zone(in hectare) 62.28
(e)Final Void of 166.67 (hectare) at a Depth of 3 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 55
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20221.401.400
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA 0183
(ii)Name of the EIA Consultant Enkay Enviro Services Pvt. Ltd., Jaipur
(iii)Address 92, Heera Nagar-A, Near Shalimar Bagh, Ajmer Road, Jaipur – 302021
(iv)Mobile No. 9314363996
(v)Landline No. 4920770
(vi)Email Id info@enkayenviro.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 12 Dec 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)25/07/2022Your proposal has been examined and it is found that you are required to submit following documents: 1.Copy of Form-1 & PFR duly signed by pp and consultant is not submitted. 2.Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant as well as by PP is not submitted. 3.Submit Certificate from concerned Deputy Conservator of Forest for proposed area not falling within 10 kms of boundary of wildlife Sanctuary/NP/ conservation reserve. 4. Copy of approved mining plan is not submitted. 5. Aravali certificate is not submitted in prescribed format. 6.Submit production figure in prescribed format.
(2.)19/08/2022The correction have been made as per the instruction received
(3.)24/08/2022The proposals/ application is found deficient /incomplete in respect to following: - 1. DCF certificate submitted by pp is district specific so you are required to submit concern DCF certificate clearly stating that there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine. 2.Submit production figure upto 2022-23. 3.Submit a Copy of valid letter of intent .
(4.)01/09/2022The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahendra Singh Ratnawat
DesignationProprietor
Name of Company (Applicant Name should not be given here)MS MAHENDRA SINGH RATNAWAT
Address53, Golimar Garden, Sahkar Marg, Jaipur, Rajasthan
Print