Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Surajpura Sand Quarry
(b)Name of the Company / Organisation VISTASALES PRIVATE LIMITED
(c)Registered Address Gala No. 216, Building No. 3B, Rahul Mittal Industries,,Bhopal,Madhya Pradesh-462023
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Mahesh Kumar Verma
(b)Designation (Owner/ Partner/ CEO) Lisioning Officer
(c)Address 98, Rachna Nagar, Bhopal,Bhopal,Huzur,Bhopal,Madhya Pradesh-462023
(d)Pin code 462023
(e)E-mail verma.mahesh4@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/MIN/80695/2021
(e)Master Proposal Number(Single Window) SW/283222/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 422,393
(b)Pincode 483770
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 48
Second 48.01
From
Degree 23
Minutes 48
Second 47.52
(d)Bounded Longitudes (East)
From
Degree 80
Minutes 43
Second 22.18
From
Degree 80
Minutes 43
Second 21.52
(e)Survey of India Topo Sheet No. 64A/9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 375
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshKatniBarhiSurajpura
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 890/SEIAA/21
(b)Date of Apply of TOR 06 Apr 2021
(c)Date of Issue of TOR / Standard ToR 24 May 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 Jan 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Feb 2022
Distance of Public Hearing Venue from the Proposed Project :0.10
Grampanchayt
State :Madhya Pradesh
District :Katni
Tehsil :Barhi
Village :Surajpura
36this local EmploymentOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)JCB1NA
(2.)Dumper15NA
(3.)Water Tanker1NA
(4.)Excavator1NA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sand Mine61900OthersCubic meter per yearRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.146
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.11
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.14
(e) Funds Allocated for Environment Management Capital(%) 9.60
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNA0Road0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 21 May 2021 To 09 Jun 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube73.4965.428.57100
(2.)SO2Micro Gram per Meter Cube10.534.0810.3680
(3.)NOxMicro Gram per Meter Cube29.505.0829.0380
(4.)PM2.5Micro Gram per Meter Cube28.4911.4527.5260
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.386.656.58.5
(2.)TSSmg/l236.0031.0000
(3.)TDSmg/l853.00222.005002000
(4.)Total Hardnessmg/l580.00188.00300600
(5.)Chloridesmg/l135.959.922501000
(6.)Fluoridemg/l1.120.1011.5
(7.)Heavy Metalsleadmg/l0.050.050.050.05
    14.3.     No. of Surface Water Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.906.64C
(2.)DOmg/l5.43.9C
(3.)BODmg/l10.004.00C
(4.)CODmg/l80.0040.00C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))80.2033.4045
(2.)Leq(Night)A-weighted decibels(dB(A))48.9031.2055
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.094.69
(2.)N(Nitrogen)Kilogram per hectare213.2543.90
(3.)K(Potassium)Kilogram per hectare225.3453.87
(4.)P(Phosphorus)Kilogram per hectare1.330.07
(5.)Electric ConductivityKilogram per hectare326.50145.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 8 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSupply Tanker80.25 Not Appliacble PipelineOthersTanker SupplyNA20 Oct 20218
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.000.7Green Belt and Dust suppresionOthersGreen Belt and Dust suppresion0.30.7
16.1.
(a)Total Waste Water Generation 1
(b)Total Discharged Water 0.7
(c)Total Reused Water 0.3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NAOthersNA0Tons0RoadOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube27.523.000.08027.660
(2.)PM10Microgram per Meter Cube73.508.000.8074.32100
(3.)SO2Microgram per Meter Cube00000
(4.)NOxMicrogram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000Others0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 6.190
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.190
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 74.0
(b)Waste/Barren Land 9.47
(c)Grazing/ Community Land 0.01
(d)Surface Water Bodies 1.95
(e)Settlements 1.53
(f)Industrial 0.02
(g)Forest 10.46
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA NA
    Total NaN
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area6.190NA
Total 6.19
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA80None Within 10 km Radius
(2.)NPANA110None Within 10 km Radius
(3.)ESAsNA90None Within 10 km Radius
(4.)ESZsNA100None Within 10 km Radius
(5.)Wildlife CorridorsNA90None Within 10 km Radius
(6.)CorridorsNA80None Within 10 km Radius
(7.)WLSNA100None Within 10 km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA80None within 10 km radius
(2.)Defence InstallationsNA100None within 10 km radius
(3.)ForestSalaiya RF2.00None within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area urmal river
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area mahanadi
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 5.00
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 5
(e)No. of working days 240
(f)Total Manpower 15
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 4.00
(b)Percentage of Total Project Area 64.62
(c)No. of Plants to be Planted 7000
(d)Funds Allocated for Plantation 550000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe employment to local people in the proposed mine and shall provide employment opportunity as per the qualification and skill
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SandMinor
2.
Mine Capacity in ROM (Run of Mine) 61900
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Khanij/2020/2394
(b)Date of Approval 30 Jul 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 6.190
(f)Approved Capacity 61900
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.1238
(b)Mineable Reserves (Million Ton) 0.0655
(c)Extractable Reserves(Million Ton) 0.0655
(d)Percent(%) of Extraction 98
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 0.02
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 4
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 6.190
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 21 Jan 2020
(iii)Validity of LOI 3
(iv)Reference No. of LOI RET/2020/499
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Lease Sanction for 3 Years
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease Sanction for 3 Years
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 6.190
(b)Depth (in meter) 3
(c)Volume (in Million Cubic meter) 0.1857
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Onsite
(b)Surface to Siding/Loading Truck/ Dumper
(c)Transportation / Conveyor Details Truck/Dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND000
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)AGRICULTURE LAND000
(5.)SETTLEMENTS000
(6.)OTHERS(Specify)Govt. River bed6.19006.19
(7.)FOREST LAND000
TOTAL6.1906.19
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)VIRGIN AREA0000
(3.)GREEN BELT0000
(4.)EXCAVATION/QUARRY6.190006.19
(5.)TOP SOIL STORAGE0000
(6.)INTERNAL OB DUMPS0000
(7.)ROADS0000
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL6.190006.19
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 6.190
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 4.00
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0176
(ii)Name of the EIA Consultant Creative Enviro Services
(iii)Address 42, Doorsanchar Nagar, Near Savoy Complex, Bhopal, 462039
(iv)Mobile No. 9425009319
(v)Landline No. 0755429931
(vi)Email Id creative.bpl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 22 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)18/07/2022Please upload approved DSR (2021-2022) highlighting details of proposed site (As per policy decision of 724th SEIAA meeting dated 17.05.2022), Certification of Mining Officer regarding availability of mineral (quantity of sand available), upload Letter of intent issue by MPSMC with List of sand mining sites with approved quantity (Sand) highlighting proposed site and approved quantity, In Form 02 S.No. 21 please fill Detail landuse breakup of study area and make sure the details of corresponding address of Project proponent should be correct.
(2.)02/08/2022The correction have been made as per the instruction received
(3.)04/08/2022Please upload letter of intent (LOI) with list of mines including proposed site with approved mineable Sand quantity and Details of Minable mineral potential (60% )of all sites including proposed site in District survey report. Note: Make sure the address of Project Proponent should be correct.
(4.)23/08/2022The correction have been made as per the instruction received
(5.)26/08/2022Please comply Previous EDS. Proposal of EC (Sand Mining Cases) shall be accepted only after the approval of New DSR (as policy decision of 724th SEIAA meeting dated 17.05.2022), Please upload Approved DSR highlighting details of proposed site, Upload Aashay patra or Letter of Intent (LOI) with List of Mining lease with approved quantity of Sand for mining in order to check the PC not exceeding the tender quantity, upload visible copy of Approved mine plan letter (Full page), Fill detail in S.No. 21 (landuse breakup of study area (See EIA) Note: Make sure all relevant documents uploaded and should be visible Address of PP should be correct.
(6.)03/11/2022The correction have been made as per the instruction received
(7.)15/11/2022Please upload Letter of Intent (LOI) letter with Approved Quantity of Each Sand Mines, upload Latest NABET-QCI Certificate of Consultant with validity.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahesh Kumar Verma
DesignationLisioning Officer
Name of Company (Applicant Name should not be given here)VISTASALES PRIVATE LIMITED
AddressGala No. 216, Building No. 3B, Rahul Mittal Industries,