1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion Project for Manufacturing of Paper from Waste Paper Based Mills by M/s. Shah Paper Mills Ltd. | (b)Name of the Company / Organisation | M/S. SHAH PAPER MILLS LIMITED | (c)Registered Address | Plot No:97, Notified Industrial Area, GIDC Vapi, Tal:Pardi, Dist.:Valsad, Gujarat.,,Valsad,Gujarat-396195 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Joshua Madhuker | (b)Designation (Owner/ Partner/ CEO) | President Liaison | (c)Address | Plot No. 97,Notified Industrial Area, GIDC Vapi, Tal. Pardi, Dist. Valsad, Gujarat.,,Pardi,Valsad,Gujarat-396195 | (d)Pin code | 396195 | (e)E-mail | j.madhuker@shahpaper.com | (f)Telephone No. | 0- | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(i) Pulp & paper industry excluding manufacturing of paper from waste
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/IND/77746/2021 | (e)Master Proposal Number(Single Window) | SW/276322/2022 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (g)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 97 | (b)Pincode | 396195 | (c)Bounded Latitudes (North) | | From | | Degree | 20 | Minutes | 21 | Second | 36.14 | From | | Degree | 20 | Minutes | 21 | Second | 40.31 | (d)Bounded Longitudes (East) | | From | | Degree | 72 | Minutes | 55 | Second | 20.67 | From | | Degree | 72 | Minutes | 55 | Second | 27.55 | (e)Survey of India Topo Sheet No. | F43S15/ F43T3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 30 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 2.28 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Valsad | Pardi | GIDC Vapi | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | SIA/GJ/182609/2021 | (b)Date of Apply of EC | 09 Sep 2021 | (c)Date of Issue of EC | 31 Dec 1899 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Apr 2022 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| VIA Auditorium Hall, Plot No. 135, Near Vapi Char Rasta, GIDC Vapi, Dist. Valsad on 28/04/2022 along with the local villagers of the Study Area | State : | Gujarat | District : | Valsad | Tehsil : | Pardi | Village : | GIDC Vapi |
| 179 | Employment Related, School and Aanganwadi development related and Skill development related major issues were raised during Public heraing | Others | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | GPCB/CCA-VSD-275(4)(A)/ID:24366 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | N/A | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Writing/News/Printing Paper | 5500 | 3500 | 9000 | Others | TPM | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Steam Boiler | 13 TPH | 0 | 0 | Will be dismantled | (2.) | Steam Boiler | 40 TPH | 0 | 40 TPH | None | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 15 Nov 2017 | (iv)Valid Upto | 30 Jun 2022 | (v)File No. | AWH 89472 | (vi)Application No. | 126506 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 76.64 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 5.14 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.7664 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 4.3716 | (e) Funds Allocated for Environment Management Capital(%) | 6.71 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4694.76 | (b)Existing quantity of raw material/fuel | 7928.02 | (c)Total quantity of raw material/fuel | 12622.78 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Waste Paper | 10226 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (2.) | Deinking chemical | 32.23 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (3.) | Caustic Soda | 100 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (4.) | Hydrogen Peroxide | 180 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (5.) | Soap Stone Powder | 1350 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (6.) | Bleaching chemical | 149.55 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (7.) | Starch | 450 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | (8.) | Sodium Silicate | 135 | Others | TPM | Local Market | Road | | 100 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2021 To 31 Dec 2021 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 84.9 | 61.1 | 76.09 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43.50 | 27.00 | 39.42 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 21.90 | 8.10 | 14.85 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 29.10 | 13.00 | 20.02 | 80 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 12 | 5 | 0 | 0 | (2.) | TDS | | | mg/l | | 1285 | 361 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 675 | 276 | 200 | 600 | (4.) | Heavy Metals | | Zinc | mg/l | | 0.22 | 0.12 | 5 | 15 | (5.) | pH | | | Others | pH Unit | 7.42 | 6.9 | 7 | 7 | (6.) | Chlorides | | | mg/l | | 536 | 40 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0.7 | 0.5 | 1 | 1.5 | |
14.3. No. of Surface Water Monitoring Locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | pH Unit | 7.82 | 5.38 | E | (2.) | DO | | mg/l | | 6.1 | 4.4 | D | (3.) | BOD | | mg/l | | 9 | 3 | D | (4.) | COD | | mg/l | | 18 | 12 | D | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 66.4 | 62.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 61.3 | 57.4 | 70 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Percent | | 0.079 | 0.067 | (2.) | pH | Others | pH Unit | 7.7 | 6 | (3.) | Electric Conductivity | Others | dS/m | 1.82 | 1.01 | (4.) | P(Phosphorus) | Others | mg/100gm | 7.55 | 2.68 | (5.) | K(Potassium) | Milliequivalents per 100 Gram | | 2.1 | 1.49 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 5 To 10 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Vapi Water Supply | 1680 | 10 | Copy of Permission Letter | Pipeline | | Others | Pipeline | DEE/WS/NAO/VPI/7163 | 02 Aug 2021 | 1700 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 2867 | 300 | ETP | Reuse within the Plant & Recycling,Others | 411 KLD in CETP after treatment and 54 KLD loss | 2402 | 465 | (2.) | Domestic | 28 | 30 | STP | Green Belt Renewal Plant | | 28 | | |
|
16.1. | (a)Total Waste Water Generation | 2895 | (b)Total Discharged Water | 465 | (c)Total Reused Water | 2430 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 3 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | De-Inking Sludge | Others | Process waste | 14070 | Tons | 0 | Others | On trolley within preises | Others | Used in boiler as a fuel | (3.) | Fly Ash | Fly Ash | | 5940 | Tons | 10 | Road | | Others | Sent to Brick Manufacturing Industry | (4.) | Plastic Waste (Non-Recyclable) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3930 | Tons | 10 | Road | | Others | as fuel in energy boiler | (5.) | Discarded Containers/Bags | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 10 | Road | | Authorized Recyclers | | (6.) | STP Sludge | Municipal Solid Waste | | 12 | Tons | 0 | Others | On trolley within premises | Others | Used as a manure in plant premises | (7.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.30 | Tons | 10 | Road | | Others | To registered re-refiners | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 29.1 | 0.25 | 0.72 | 29.82 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 84.9 | 0.5 | 0.75 | 85.65 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 43.50 | 0.5 | 0 | 43.50 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 21.9 | 0.5 | 0.14 | 22.04 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler (40 TPH) | Imported coal/ lignite/ Deinking sludge | 70 | 3.0 | PM10,SO2,NOx | | 1.77, 0.33, 1.69 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4500 | (b)Source | 4.9 MW CPP is/ will be used. No additional power w | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | D.G. Set Not Required | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 0 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 3.9113 | Total Land | 3.9113 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 17677.4 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 2762.2 | (e)Settlements | 1925.5 | (f)Industrial | 1550.3 | (g)Forest | 787.8 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Scrub & Grass land | 6761 | Total | 31464.2 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Main Plant | | 0.6356 | | (2.) | Green belt | | 1.5646 | | (3.) | Area for Solid Waste Management | | 0.4943 | | (4.) | Others | Open Area, storage area, road, etc. | 1.2168 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | NIL | (2.) | WLS | Nil | 0 | NIL | (3.) | ESAs | Nil | 0 | NIL | (4.) | ESZs | Nil | 0 | NIL | (5.) | Corridors | Nil | 0 | NIL | (6.) | NPA | Nil | 0 | NIL | (7.) | Wildlife Corridors | Nil | 0 | NIL | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Nil | 0 | NIL | (2.) | Forest | | Nil | 0 | NIL | (3.) | Archaeological Sites | | Nil | 0 | NIL | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 3.9113 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not Applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pavo Cristatus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1.50 Lakhs | (iii)Period of Implementation | After Receiving EC Letter | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | River Damanganga, Darotha & Kolak | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 105 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 130 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 7823 | 7823 | 15646 | (2.) | Percentage of Total Project Area | 20 | 20 | 40 | (3.) | No. of Plants | 1310 | 1441 | 2751 | (4.) | Funds Allocated | 1 | 4 | 5 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenbelt Development | (2.) | Social | Employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act | Show Cause Notice on Plastic waste Storage | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/SA 0156 | (ii)Name of the EIA Consultant | M/s. Eco Chem Sales & Services | (iii)Address | Office Floor, Ashoka Pavillion – A, Opp. Kapadia Health club, Surat 395001 (GJ). | (iv)Mobile No. | 9825123805 | (v)Landline No. | 0261223622 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Mar 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 25/06/2022 | (1) certified complaince report from MoEF & CC (2) Compliance of CPCB direction under 18 (1) (B) w.r.t. additional discharge into CETP (3) Format of SEAC (4) Plot allotment is not readable so upload readable (4) Membership of TSDF with quantity as mentioned in haz. waste details. | | (2.) | 05/07/2022 | The correction have been made as per the instruction received | | (3.) | 06/07/2022 | (1) As per OM of MoEF dated you have to submit fresh CCR from concerned authority. (2) As per CCA only 126 KLD is allowed to discharge in CETP and now proposing 411 KLD which is not in line with CPCB directions 18 (1) (B), so not allowed. | | (4.) | 23/01/2023 | The correction have been made as per the instruction received | | (5.) | 24/01/2023 | As per MoEF&CC OM dated: 05.07.2022, the projects located in CPAs and SPAs shall be dealt at Central level. So you have to apply at Central level. | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Joshua Madhuker | Designation | President Liaison | Name of Company (Applicant Name should not be given here) | M/S. SHAH PAPER MILLS LIMITED | Address | Plot No:97, Notified Industrial Area, GIDC Vapi, Tal:Pardi, Dist.:Valsad, Gujarat. |
|