1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Redevelopment of All India Institute of Medical Sciences (AIIMS), New Delhi | (b)Name of the Company / Organisation | ALL INDIA INSTITUTE OF MEDICAL SCIENCES, NEW DELHI | (c)Registered Address | All India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029,,South,Delhi-110029 | (d)Legal Status of the Company | Central Government | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Deepak Bhutale | (b)Designation (Owner/ Partner/ CEO) | Executive EngineerCivil | (c)Address | All India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029,,Hauz Khas,South,Delhi-110029 | (d)Pin code | 110029 | (e)E-mail | pmu@aiims.edu | (f)Telephone No. | 11-29575118 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 8(b) Townships and Area Development projects.
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/DL/MIS/71147/2022 | (e)Master Proposal Number(Single Window) | SW/274406/2022 | (f)EAC concerned (for category A Projects only) | INFRA-2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | H43X/2, H43X/3, H43X/6 and H43X/7 | (b)Pincode | 110029 | (c)Bounded Latitudes (North) | | From | | Degree | 28 | Minutes | 33 | Second | 52.675 | From | | Degree | 28 | Minutes | 34 | Second | 1.195 | (d)Bounded Longitudes (East) | | From | | Degree | 77 | Minutes | 12 | Second | 58.870 | From | | Degree | 77 | Minutes | 12 | Second | 2.590 | (e)Survey of India Topo Sheet No. | H43X/2, H43X/3, H43X/6 and H43X/7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 195 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 8.4 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Delhi | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Delhi | South | Hauz Khas | Hauz Khas | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The project is B1 Category and is exempted from Pu | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Total area for redevelopment of AIIMS Campus | 152.55 acres (i.e., 61.74 Ha) | The project comprises of the existing East Ansari Nagar Campus (107.6 acres), Masjid Moth Campus (30 acres) and development of the Trauma Center extension campus (14.95 acres). | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Built-up Area | 1465695 | Others | Sq.m | Others | Trucks with tarpulin sheets cover | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 15558 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.23 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0 | (e) Funds Allocated for Environment Management Capital(%) | 0.00 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1130000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1130000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Concrete | 350000 | Others | Cubic Meter | Open Market | Road | | 1 | Linkage | | Copy of Linkage | (2.) | Reinforcement steel | 100000 | Others | MT | Open Market | Road | | 1 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 16 Jan 2021 To 15 Apr 2021 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 630 | 103 | 628.7 | 100 | (2.) | Others | CO | Mili Gram per Meter Cube | 3.9 | 0.42 | 3.9 | 4 | (3.) | SO2 | | Micro Gram per Meter Cube | 59 | 10 | 51.1 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 90 | 19.9 | 89.2 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 585 | 81 | 569.6 | 60 | |
14.2. No. of Ground Water Monitoring Locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1528 | 893 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 972 | 426.6 | 300 | 600 | (3.) | Others | Arsenic | | mg/l | | 0.01 | 0.01 | 0.01 | 0.05 | (4.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (5.) | Fluoride | | | mg/l | | 1 | 1 | 1 | 1.5 | (6.) | pH | | | Others | Dimensionless | 6.97 | 6.71 | 6.5 | 8.5 | (7.) | Chlorides | | | mg/l | | 601.3 | 184.60 | 250 | 1000 | (8.) | Heavy Metals | | Iron | mg/l | | 0.1 | 0.1 | 0.3 | 0.3 | |
14.3. No. of Surface Water Monitoring Locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | Dimensionless | 7.24 | 7.24 | B | (2.) | BOD | | mg/l | | 2 | 2 | B | (3.) | COD | | mg/l | | 7.2 | 7.2 | B | (4.) | Others | TDS | mg/l | | 1765 | 1765 | B | (5.) | DO | | mg/l | | 5.9 | 5.9 | B | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.3 | 42.7 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.7 | 55.9 | 55 | |
14.5. No. of Soil Sample Monitored Locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | Dimensionless | 7.91 | 7.05 | (2.) | N(Nitrogen) | Percent | | 0.362 | 0.265 | (3.) | P(Phosphorus) | Percent | | 0.592 | 0.467 | (4.) | K(Potassium) | Milligram per Kilogram | | 452 | 208 | (5.) | Electric Conductivity | Others | MicroSiemens/cm | 1330 | 820 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 6.11 To 24.05 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 6.44 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Operation -DJB for Masjid Moth Area | 193 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | DJB/CEO/2022/D-1413 | 11 May 2022 | 8000 | (2.) | Others | Locally for Construction of Trauma Centre Ext | 14 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | NA | 02 May 2022 | 14 | (3.) | Others | Operation-DJB for Trauma Center Extension | 610 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | DJB/CEO/2022/D-1413 | 11 May 2022 | 8000 | (4.) | Others | Operation-DJB for East Ansari Nagar | 6700 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | DJB/CEO/2022/D-1413 | 11 May 2022 | 8000 | (5.) | Others | Locally for Construction of East Ansari Nagar | 27 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | NA | 02 May 2022 | 27 | (6.) | Others | Locally for Construction of Masjid Moth | 4.5 | 0 | Copy of Permission Letter | modeOthers | Road | Others | Tankers | NA | 02 May 2022 | 4.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic WW - Masjid Moth | 170 | 2000 | STP with SBR technology | Others | Recycled and re-used for flushing & horticulture | 170 | 0 | (2.) | Domestic WW - Trauma Centre Extension | 790 | 850 | STP with MBR technology | Others | Recycled and re-used for flushing & horticulture | 790 | 0 | (3.) | Domestic WW - East Ansari Nagar | 7813 | 9000 | STP with MBR technology | Others | Recycled and re-used for flushing & horticulture | 7813 | 0 | |
|
16.1. | (a)Total Waste Water Generation | 8773 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 8773 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MSW from EAN Construction (t/day) | Municipal Solid Waste | | 0.060 | Tons | 0 | Road | | Others | treated and handled as per SWM Rules, 2016 | (2.) | MSW from EAN Operation (t/day) | Municipal Solid Waste | | 20 | Tons | 0 | Road | | Others | Handled as per SWM Rules, 2016 | (3.) | C&D from Masjid Moth | Construction & Demolition Waste | | 4000 | Tons | 0 | Road | | Authorized Recyclers | | (4.) | BNW-Operation of MM (t/day) | Bio-Medical Waste | | 0.6 | Tons | 0 | Road | | Others | As per BMW Rules 2016 | (5.) | C&D from TCE Operation | Construction & Demolition Waste | | 11500 | Tons | 0 | Road | | Authorized Recyclers | | (6.) | Used Oil -TCE Construction (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.03 | Kilolitre | 0 | Road | | Authorized Recyclers | | (7.) | Used oil from Operation of TCE (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.4 | Kilolitre | 0 | Road | | Authorized Recyclers | | (8.) | MSW from MM Construction (t/day) | Municipal Solid Waste | | 0.01 | Tons | 0 | Road | | Others | Handled as per SWM Rules, 2016 | (9.) | MSW-Construction of TCE | Municipal Solid Waste | | 0.03 | Tons | 0 | Road | | Others | Handled as per SWM Rules, 2016 | (10.) | MSW-Operation of TCE (t/day) | Municipal Solid Waste | | 4.2 | Tons | 0 | Road | | Others | treated and handled as per SWM Rules, 2016 | (11.) | Used Oil from MM Operation (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.55 | Kilolitre | 0 | Road | | Others | Handled as per Hazardous Waste 2016 Rules | (12.) | Construction waste from East Ansari Nagar | Construction & Demolition Waste | | 58180 | Tons | 0 | Road | | Authorized Recyclers | | (13.) | Demolition Waste from EAN | Construction & Demolition Waste | | 80000 | Tons | 0 | Road | | Authorized Recyclers | | (14.) | Used oil-Construction of MM (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.06 | Kilolitre | 0 | Road | | Authorized Recyclers | | (15.) | MSW from MM Operation (t/day) | Municipal Solid Waste | | 9 | Tons | 0 | Road | | Others | Handled as per SWM Rules, 2016 | (16.) | Used oil-Construction of EAN (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.130 | Kilolitre | 0 | Road | | Authorized Recyclers | | (17.) | BMW from re-development (t/day)EAN | Bio-Medical Waste | | 4 | Tons | 0 | Road | | Others | As per BMW Rules 2016 | (18.) | Used oil- Operation EAN (kl/year) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 9.9 | Kilolitre | 0 | Road | | Others | Hazardous and Other Waste Rules, 2016 | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 630 | 2 | 0 | 630 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 32.6 | 2 | 0.13 | 32.73 | 80 | (3.) | NOx | | Microgram per Meter Cube | 53.4 | 2 | 0.84 | 54.24 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 585 | 2 | 0 | 585 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 2x500 KVA | HSD | 45 | 0.33 | SO2,NOx | | 0.84 | (2.) | 1x250 KVA | HSD | 45 | 0.33 | SO2,NOx | | 0.84 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60000 | (b)Source | Authorized agency, NDMC, BSES Rajdhani Power Lim | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | Construction:2x500,4x250;Operation:14x2000,8x2000, | (e)Stack Height (in m) | 45 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 0 | (c)Government Land | 61.74 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 61.74 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 0 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 0 | (e)Settlements | 0 | (f)Industrial | 0 | (g)Forest | 0 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Education and Research University under PS-1 Zone | 61.74 | Total | 61.74 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Others | Education and Research University | 61.74 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Asola Bhatti WLS&Okhla Bird Sanctuary | 7 | Asola Bhatti WLS (7.1km,S),Okhla BS (7.6 km,E) | (2.) | NPA | Not Applicable | 10 | None within 10 km Radius of the project | (3.) | ESZs | ESZ of Asola Bhatti WLS | 6 | Located towards South | (4.) | Corridors | Not Applicable | 10 | None within 10 km Radius of the project | (5.) | ESAs | Not Applicable | 10 | None within 10 km Radius of the project | (6.) | Critically Polluted Area | Not Applicable | 10 | None within 10 km Radius of the project | (7.) | Wildlife Corridors | Not Applicable | 10 | None within 10 km Radius of the project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not Applicable | 10 | None within 10 km Radius of the project | (2.) | Forest | | Central Ridge RF, Jahanpanah City PF | 4.5 | Jahanpanah City PF (3.38 km, SE), Central Ridge RF(4.4km,NW) | (3.) | Archaeological Sites | | Safdarjung Tomb | 2.25 | Nearest Site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 61.74 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Leopard and desert cat | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Barapulla Nala | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 1000 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 1980 | (f)Total Manpower | 1000 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 25.6 | (b)Percentage of Total Project Area | 41.46 | (c)No. of Plants to be Planted | 40000 | (d)Funds Allocated for Plantation | 2000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | The redevelopment project involves construction of new structures which would be according to IGBC and GRIHA Rated System. The project would implement green building principles, usage of solar energy, | (2.) | Social | The construction phase will create considerable indirect economic and employment opportunities The increase in the number of beds and extension of OPD facilities will be beneficial to patients from | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 40 | (b)Total No. of Flats to be Build | 5815 | (c)No. of Buildings | 37 | (d)Total plot area (sqm) | 617347.078 | (e)Total built up area (sqm) | 1465695 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 3 | Capacity | 10005 | (b)No. of Recharge Pits | 120 | Capacity | 38.47 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 14432 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar Power | (b)Percentage | 5 | (c)Quantity | 3.9 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0108 | (ii)Name of the EIA Consultant | AECOM India Pvt Ltd | (iii)Address | 9th Floor, Infinity Tower C DLF Cyber City, DLF Phase II Gurgaon, HR 122002, India | (iv)Mobile No. | 9819068877 | (v)Landline No. | 244830100 | (vi)Email Id | Chetan.Zaveri@aecom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 08 Aug 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 27/05/2022 | No Document found uploaded against Annexures-1.2 for point wise ToR Compliance. | | (2.) | 30/05/2022 | The correction have been made as per the instruction received | | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 08/06/2022 | Please refer Minutes of Meeting of 105th SEAC Meeting held on 03.06.2022 (uploaded on PARIVESH Portal) for ADS. | | (2.) | 01/08/2022 | ADS responses for AIIMS | ADS Letter | (3.) | 06/08/2022 | Please refer Minutes of Meeting of 111th SEAC Meeting held on 06.08.2022 (uploaded on PARIVESH Portal) for ADS. | | (4.) | 13/08/2022 | Please find the response to the ADS raised during 111th SEAC Meeting | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Deepak Bhutale | Designation | Executive EngineerCivil | Name of Company (Applicant Name should not be given here) | ALL INDIA INSTITUTE OF MEDICAL SCIENCES, NEW DELHI | Address | All India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029 |
|