Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Redevelopment of All India Institute of Medical Sciences (AIIMS), New Delhi
(b)Name of the Company / Organisation ALL INDIA INSTITUTE OF MEDICAL SCIENCES, NEW DELHI
(c)Registered Address All India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029,,South,Delhi-110029
(d)Legal Status of the Company Central Government
2.
Address for the correspondence:
(a)Name of the Applicant Deepak Bhutale
(b)Designation (Owner/ Partner/ CEO) Executive EngineerCivil
(c)Address All India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029,,Hauz Khas,South,Delhi-110029
(d)Pin code 110029
(e)E-mail pmu@aiims.edu
(f)Telephone No. 11-29575118
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/DL/MIS/71147/2022
(e)Master Proposal Number(Single Window) SW/274406/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. H43X/2, H43X/3, H43X/6 and H43X/7
(b)Pincode 110029
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 33
Second 52.675
From
Degree 28
Minutes 34
Second 1.195
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 12
Second 58.870
From
Degree 77
Minutes 12
Second 2.590
(e)Survey of India Topo Sheet No. H43X/2, H43X/3, H43X/6 and H43X/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 195
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 8.4
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)DelhiSouthHauz KhasHauz Khas
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is B1 Category and is exempted from Pu
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total area for redevelopment of AIIMS Campus152.55 acres (i.e., 61.74 Ha)The project comprises of the existing East Ansari Nagar Campus (107.6 acres), Masjid Moth Campus (30 acres) and development of the Trauma Center extension campus (14.95 acres).
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up Area1465695OthersSq.mOthersTrucks with tarpulin sheets cover
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 15558
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.23
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1130000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1130000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Concrete350000OthersCubic MeterOpen MarketRoad1 LinkageCopy of Linkage
(2.)Reinforcement steel100000OthersMTOpen MarketRoad1 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 16 Jan 2021 To 15 Apr 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube630103628.7100
(2.)OthersCOMili Gram per Meter Cube3.90.423.94
(3.)SO2Micro Gram per Meter Cube591051.180
(4.)NOxMicro Gram per Meter Cube9019.989.280
(5.)PM2.5Micro Gram per Meter Cube58581569.660
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l15288935002000
(2.)Total Hardnessmg/l972426.6300600
(3.)OthersArsenicmg/l0.010.010.010.05
(4.)TSSNA0000
(5.)Fluoridemg/l1111.5
(6.)pHOthersDimensionless6.976.716.58.5
(7.)Chloridesmg/l601.3184.602501000
(8.)Heavy MetalsIronmg/l0.10.10.30.3
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersDimensionless7.247.24B
(2.)BODmg/l22B
(3.)CODmg/l7.27.2B
(4.)OthersTDSmg/l17651765B
(5.)DOmg/l5.95.9B
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))55.342.745
(2.)Leq(Day)A-weighted decibels(dB(A))69.755.955
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthersDimensionless7.917.05
(2.)N(Nitrogen)Percent0.3620.265
(3.)P(Phosphorus)Percent0.5920.467
(4.)K(Potassium)Milligram per Kilogram452208
(5.)Electric ConductivityOthersMicroSiemens/cm1330820
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.11 To 24.05
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 6.44
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersOperation -DJB for Masjid Moth Area1930Copy of Permission LettermodeOthersRoadOthersTankersDJB/CEO/2022/D-141311 May 20228000
(2.)OthersLocally for Construction of Trauma Centre Ext140Copy of Permission LettermodeOthersRoadOthersTankersNA02 May 202214
(3.)OthersOperation-DJB for Trauma Center Extension6100Copy of Permission LettermodeOthersRoadOthersTankersDJB/CEO/2022/D-141311 May 20228000
(4.)OthersOperation-DJB for East Ansari Nagar67000Copy of Permission LettermodeOthersRoadOthersTankersDJB/CEO/2022/D-141311 May 20228000
(5.)OthersLocally for Construction of East Ansari Nagar270Copy of Permission LettermodeOthersRoadOthersTankersNA02 May 202227
(6.)OthersLocally for Construction of Masjid Moth4.50Copy of Permission LettermodeOthersRoadOthersTankersNA02 May 20224.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic WW - Masjid Moth1702000STP with SBR technologyOthersRecycled and re-used for flushing & horticulture1700
(2.)Domestic WW - Trauma Centre Extension790850STP with MBR technologyOthersRecycled and re-used for flushing & horticulture7900
(3.)Domestic WW - East Ansari Nagar78139000STP with MBR technologyOthersRecycled and re-used for flushing & horticulture78130
16.1.
(a)Total Waste Water Generation 8773
(b)Total Discharged Water 0
(c)Total Reused Water 8773
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSW from EAN Construction (t/day)Municipal Solid Waste0.060Tons0RoadOtherstreated and handled as per SWM Rules, 2016
(2.)MSW from EAN Operation (t/day)Municipal Solid Waste20Tons0RoadOthersHandled as per SWM Rules, 2016
(3.)C&D from Masjid MothConstruction & Demolition Waste4000Tons0RoadAuthorized Recyclers
(4.)BNW-Operation of MM (t/day)Bio-Medical Waste0.6Tons0RoadOthersAs per BMW Rules 2016
(5.)C&D from TCE OperationConstruction & Demolition Waste11500Tons0RoadAuthorized Recyclers
(6.)Used Oil -TCE Construction (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.03Kilolitre0RoadAuthorized Recyclers
(7.)Used oil from Operation of TCE (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.4Kilolitre0RoadAuthorized Recyclers
(8.)MSW from MM Construction (t/day)Municipal Solid Waste0.01Tons0RoadOthersHandled as per SWM Rules, 2016
(9.)MSW-Construction of TCEMunicipal Solid Waste0.03Tons0RoadOthersHandled as per SWM Rules, 2016
(10.)MSW-Operation of TCE (t/day)Municipal Solid Waste4.2Tons0RoadOtherstreated and handled as per SWM Rules, 2016
(11.)Used Oil from MM Operation (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.55Kilolitre0RoadOthersHandled as per Hazardous Waste 2016 Rules
(12.)Construction waste from East Ansari NagarConstruction & Demolition Waste58180Tons0RoadAuthorized Recyclers
(13.)Demolition Waste from EANConstruction & Demolition Waste80000Tons0RoadAuthorized Recyclers
(14.)Used oil-Construction of MM (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.06Kilolitre0RoadAuthorized Recyclers
(15.)MSW from MM Operation (t/day)Municipal Solid Waste9Tons0RoadOthersHandled as per SWM Rules, 2016
(16.)Used oil-Construction of EAN (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.130Kilolitre0RoadAuthorized Recyclers
(17.)BMW from re-development (t/day)EANBio-Medical Waste4Tons0RoadOthersAs per BMW Rules 2016
(18.)Used oil- Operation EAN (kl/year)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)9.9Kilolitre0RoadOthersHazardous and Other Waste Rules, 2016
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63020630100
(2.)SO2Microgram per Meter Cube32.620.1332.7380
(3.)NOxMicrogram per Meter Cube53.420.8454.2480
(4.)PM2.5Microgram per Meter Cube5852058560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2x500 KVAHSD450.33SO2,NOx0.84
(2.)1x250 KVAHSD450.33SO2,NOx0.84
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60000
(b)Source Authorized agency, NDMC, BSES Rajdhani Power Lim
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) Construction:2x500,4x250;Operation:14x2000,8x2000,
(e)Stack Height (in m) 45
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 61.74
(d)Revenue Land 0
(e)Other Land 0
    Total Land 61.74
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Education and Research University under PS-1 Zone 61.74
    Total 61.74
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersEducation and Research University61.74
Total 61.74
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSAsola Bhatti WLS&Okhla Bird Sanctuary7Asola Bhatti WLS (7.1km,S),Okhla BS (7.6 km,E)
(2.)NPANot Applicable10None within 10 km Radius of the project
(3.)ESZsESZ of Asola Bhatti WLS6Located towards South
(4.)CorridorsNot Applicable10None within 10 km Radius of the project
(5.)ESAsNot Applicable10None within 10 km Radius of the project
(6.)Critically Polluted AreaNot Applicable10None within 10 km Radius of the project
(7.)Wildlife CorridorsNot Applicable10None within 10 km Radius of the project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable10None within 10 km Radius of the project
(2.)ForestCentral Ridge RF, Jahanpanah City PF4.5Jahanpanah City PF (3.38 km, SE), Central Ridge RF(4.4km,NW)
(3.)Archaeological SitesSafdarjung Tomb2.25Nearest Site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 4215
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 61.74
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard and desert cat
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Barapulla Nala
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 0
(e)No. of working days 1980
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 25.6
(b)Percentage of Total Project Area 41.46
(c)No. of Plants to be Planted 40000
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe redevelopment project involves construction of new structures which would be according to IGBC and GRIHA Rated System. The project would implement green building principles, usage of solar energy,
(2.)SocialThe construction phase will create considerable indirect economic and employment opportunities The increase in the number of beds and extension of OPD facilities will be beneficial to patients from
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 40
(b)Total No. of Flats to be Build 5815
(c)No. of Buildings 37
(d)Total plot area (sqm) 617347.078
(e)Total built up area (sqm) 1465695
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 3
    Capacity 10005
(b)No. of Recharge Pits 120
    Capacity 38.47
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 14432
5.
Energy Saving Measures:
(a)Source/Mode Solar Power
(b)Percentage 5
(c)Quantity 3.9
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Drainage would not be affected
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0108
(ii)Name of the EIA Consultant AECOM India Pvt Ltd
(iii)Address 9th Floor, Infinity Tower C DLF Cyber City, DLF Phase II Gurgaon, HR 122002, India
(iv)Mobile No. 9819068877
(v)Landline No. 244830100
(vi)Email Id Chetan.Zaveri@aecom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Aug 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)27/05/2022No Document found uploaded against Annexures-1.2 for point wise ToR Compliance.
(2.)30/05/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)08/06/2022Please refer Minutes of Meeting of 105th SEAC Meeting held on 03.06.2022 (uploaded on PARIVESH Portal) for ADS.
(2.)01/08/2022ADS responses for AIIMSADS Letter
(3.)06/08/2022Please refer Minutes of Meeting of 111th SEAC Meeting held on 06.08.2022 (uploaded on PARIVESH Portal) for ADS.
(4.)13/08/2022Please find the response to the ADS raised during 111th SEAC MeetingADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDeepak Bhutale
DesignationExecutive EngineerCivil
Name of Company (Applicant Name should not be given here)ALL INDIA INSTITUTE OF MEDICAL SCIENCES, NEW DELHI
AddressAll India Institute of Medical Sciences, New Delhi, Ansari Nagar, New Delhi 110029
Print