Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PROPOSED 1 MLD COMMON EFFLUENT TREATMENT PLANT BASED ON ZLD by NICDC Vikram Udyogpuri Limited at Plot No. 64, Zone II, Village Narwar, Tah. Ujjain State Madhya Pradesh
(b)Name of the Company / Organisation DMIC VIKRAM UDYOGPURI LIMITED
(c)Registered Address Administrative building, New plot No. 152, Village Narwar, Tah. Ujjain,,Ujjain,Madhya Pradesh-456664
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant Shailendra Kumar Jain
(b)Designation (Owner/ Partner/ CEO) Executive Engineer
(c)Address Administrative building, New plot No. 152, Village Narwar, Tah. Ujjain,,,Ujjain,Madhya Pradesh-456664
(d)Pin code 456664
(e)E-mail vupl.ujjain@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(h) Common Effluent Treatment Plants (CETPs)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MP/MIS/70646/2021
(e)Master Proposal Number(Single Window) SW/274299/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 64, Zone II
(b)Pincode 456664
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 5
Second 44.56
From
Degree 23
Minutes 5
Second 44.56
(d)Bounded Longitudes (East)
From
Degree 75
Minutes 57
Second 0.24
From
Degree 75
Minutes 57
Second 0.24
(e)Survey of India Topo Sheet No. 46M/16, 55A/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 527
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshUjjainUjjainNarwar
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 8940/2022
(c)Date of Apply of TOR 17 Jan 2022
(d)Date of Issue of TOR / Standard ToR 24 Jan 2022
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public hearing for Vikram Udhyogpuri industrial ar
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)1 MLD CETP1 MLD CETP
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)CETP1Million Liters per DayOthersPipeline
(2.)Plot Area7872OthersSq. m.OthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 42.6
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.4
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.342
(e) Funds Allocated for Environment Management Capital(%) 3.29
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Lime262435OthersKg/yr.Local MarketRoad20 OthersNACopy of Linkage
(2.)Chlorine5OthersppmLocal MarketRoad20 OthersNACopy of Linkage
(3.)Alum20075OthersKg/yr.Local MarketRoad20 OthersNACopy of Linkage
(4.)Poly Electrolyte20075OthersLits./yr.Local MarketRoad20 OthersNACopy of Linkage
(5.)Dewatering Polymer1.5OthersKg/ton of dry solidsLocal MarketRoad20 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2022 To 31 Mar 2022
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube17.47.217.280
(2.)PM2.5Micro Gram per Meter Cube31.216.23.0760
(3.)NOxMicro Gram per Meter Cube20.89.620.680
(4.)PM10Micro Gram per Meter Cube59.836.159.8100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsNAmg/l0000
(2.)pHNA7.847.366.58.5
(3.)Total Hardnessmg/l184.1484.06150200
(4.)Chloridesmg/l32.7515.88150250
(5.)Fluoridemg/l0.10.10.51.5
(6.)TDSmg/l344211250500
(7.)TSSmg/l5555
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l1913A
(2.)pHNA8.077.92A
(3.)BODmg/l85A
(4.)DOmg/l5.75.2B
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.541.175
(2.)Leq(Night)A-weighted decibels(dB(A))60.236.270
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.067.28
(2.)N(Nitrogen)Kilogram per hectare180.1120.2
(3.)P(Phosphorus)Kilogram per hectare24.213.2
(4.)K(Potassium)Kilogram per hectare237.6161.6
(5.)Electric ConductivityMillisiemens per Centimetre802.5469.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.05 To 30.99
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.80 To 10.48
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface280 Not Appliacble PipelineOthersPipelineNA23 May 20222
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Sewage1.11000CETPReuse within the Plant & Recycling1.1
16.1.
(a)Total Waste Water Generation 1.1
(b)Total Discharged Water 0
(c)Total Reused Water 1.1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Wet WasteOthersBiodegradable Waste0.01Tons0.2RoadOthersOn Site Composting
(2.)Dry WasteOthersNon Biodegradable Waste0.005Tons0.2RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube31.20031.260
(2.)SO2Microgram per Meter Cube17.40017.480
(3.)NOxMicrogram per Meter Cube20.80020.880
(4.)PM10Microgram per Meter Cube59.80059.8100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel130.1PM10,SO2,NOx ,PM2.5<150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11437.5
(b)Source Industrial Area
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 x 1000 KVA
(e)Stack Height (in m) 13
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0.787
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.787
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0.787
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 0.787
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.2979
(2.)Green belt0.2598
(3.)Built Up Area0.1508
(4.)OthersParking0.0787
Total 0.7872
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)NPANA0NA
(3.)ESZsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)WLSNA0NA
(6.)ESAsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)ForestNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.7872
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Silarkhedi Lake
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 6.68
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 6
(f)Total Manpower 25
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.2598
(b)Percentage of Total Project Area 33.01
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe proposed project is based on Zero Liquid Discharge scheme which shall have a major positive impact on the environment. ZLD shall directly reduce the fresh water consumption and reduce stress on ex
(2.)Financial• Saving in Capital and Operating cost of treatment plant. Common treatment is always cheaper than small scattered treatment units.
(3.)SocialThe industry will generate employment during construction and operation phases leading to a better life for local people. Proposed project shall require near about 25 employees in operation phase.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 6
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 2
(d)Total plot area (sqm) 7872
(e)Total built up area (sqm) 4487
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 2
    Capacity 2.25
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 10
5.
Energy Saving Measures:
(a)Source/Mode Solar PV
(b)Percentage 1
(c)Quantity 1
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/RA 0229_Rev 02 Valid up to Feb 05,
(ii)Name of the EIA Consultant MITCON Consultancy and Engineering Services Ltd.
(iii)Address Behind DIC Office, Agriculture College Campus, Shivajinagar, Pune – 411 005, Maharashtra (INDIA)
(iv)Mobile No. 9665043400
(v)Landline No. 0206628940
(vi)Email Id eme@mitconindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 05 Feb 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)20/06/2022Copy EnclosedADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShailendra Kumar Jain
DesignationExecutive Engineer
Name of Company (Applicant Name should not be given here)DMIC VIKRAM UDYOGPURI LIMITED
AddressAdministrative building, New plot No. 152, Village Narwar, Tah. Ujjain
Print