Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Distromed Bio Clean Pvt. Ltd.(Unit-II)
(b)Name of the Company / Organisation DISTROMED BIO CLEAN PVT. LTD. (UNIT-II)
(c)Registered Address Survey No. 64/2, Bodaki Village, Taluka : Maliya, Dist.: Morbi, Gujarat – 363660,,Morbi,Gujarat-363660
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Kachhadia
(b)Designation (Owner/ Partner/ CEO) director
(c)Address 307-308, Century Center, Near Gujarat Samachar Press, Kanta Stri Vikas Gruh Road, Rajkot – 360002.,,Rajkot,Rajkot,Gujarat-360002
(d)Pin code 360002
(e)E-mail distromedoffice@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/MIS/60940/2021
(e)Master Proposal Number(Single Window) SW/272510/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 64/2, Bodaki Village, Taluka: Maliya, D
(b)Pincode 363660
(c)Bounded Latitudes (North)
From
Degree 22
Minutes 56
Second 0.07
From
Degree 22
Minutes 56
Second 3.36
(d)Bounded Longitudes (East)
From
Degree 70
Minutes 33
Second 39.02
From
Degree 70
Minutes 33
Second 39.77
(e)Survey of India Topo Sheet No. F42E8, F42E12, F42K5, F42K9
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 8
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMorbiMaliyaBodaki
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number
(c)Date of Apply of TOR 18 Feb 2021
(d)Date of Issue of TOR / Standard ToR 02 Jul 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :14 Mar 2022
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Apr 2022
Distance of Public Hearing Venue from the Proposed Project :0
M/s. Distromed Bio Clean Pvt. Ltd.(Unit- II); Survey no. 64/2, Village: Bodaki, Taluka: Maliya, District: Morbi (Gujarat)
State :Gujarat
District :Morbi
Tehsil :Maliya
Village :Bodaki
66The issue raised during Public hearing are related to possibility of pollution, mitigation measures proposed, compliance of rules and regulation & regarding baseline survey work.OthersDistrict Collector & District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Incinerator200 kg/hr x 2 No.Proposed
(2.)Autoclave360 lit/ 200 kg/hr x 2 No.Proposed
(3.)Shredder100 kg/hr x 2 Nos.Proposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Common Bio Medical Waste Treatment Facility10OthersMT/DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 4.75
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.35
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.095
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.33
(e) Funds Allocated for Environment Management Capital(%) 28.42
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0Tons per Annum0Road0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube362835.560
(2.)SO2Micro Gram per Meter Cube9.969.680
(3.)OthersCOMili Gram per Meter Cube0002
(4.)NOxMicro Gram per Meter Cube15.69.615.280
(5.)PM10Micro Gram per Meter Cube564356100
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.27.16.58.5
(2.)TDSmg/l14609245002000
(3.)Fluoridemg/l0.40.211.5
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l850121.5200600
(6.)Chloridesmg/l576209.32501000
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.17.2E
(2.)DOmg/l4.44.0E
(3.)CODmg/l305E
(4.)BODmg/l122E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.335.645
(2.)Leq(Day)A-weighted decibels(dB(A))53.542.155
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram6239
(2.)K(Potassium)Milligram per Kilogram8925
(3.)Electric ConductivityMillisiemens per Centimetre0.8770.229
(4.)pH7.87.2
(5.)P(Phosphorus)Milligram per Kilogram24.86.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9.80Copy of Permission LetterPipelineOthersBorewell21-4/9003/GJ/IND/202204 Apr 20229.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic1.717.7ETPOthersReuse in washing and scrubbing1.70
(2.)Industrial (Process, Washing, Scrubber)1617.7ETPOthersReuse in washing and scrubbing160
16.1.
(a)Total Waste Water Generation 17.7
(b)Total Discharged Water 0
(c)Total Reused Water 17.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Encapsulated WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Treated material (Shredded plastic, glass etc.)OthersTreated material (Shredded plastic, glass etc.)1200Tons100RoadAuthorized Recyclers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.03Tons100RoadAuthorized Recyclers
(4.)Incineration AshHazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons130RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube360036.060
(2.)SO2Microgram per Meter Cube9.90.99110.980
(3.)NOxMicrogram per Meter Cube15.60.9920.0335.6380
(4.)PM10Microgram per Meter Cube560.991.7357.73100
(5.)Others(Specify)HgMicrogram per Meter Cube00.990.00300
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Incinerator (200 kg/hr)Diesel300.6PM10,SO2,NOx ,HCL,OthersHg0.45, 0.18, 3.59, 0.45, 0.00045
(2.)Incinerator* (200 kg/Hr.)Diesel300.6PM10,SO2,NOx ,HCL,OthersHg0.45, 0.18, 3.59, 0.45, 0.00045
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 80
(b)Source Paschim Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 82.5 kVA × 1 No
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.9004
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.9004
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 18272
(b)Waste/Barren Land 1700
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1124
(e)Settlements 259
(f)Industrial 0
(g)Forest 0
(h)Mangroves 3851
(i)Marine Area 0
(j)Others : creek and Salt Pans 6194
    Total 31400
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area0.17315
(2.)Green belt0.2972
(3.)OthersPaved Area + Open Area0.43005Paved Area 0.3736, Open Area 0.05645
Total 0.9004
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0Nil
(2.)ESZsNone0Nil
(3.)Wildlife CorridorsNone0Nil
(4.)ESAsNone0Nil
(5.)Critically Polluted AreaNone0Nil
(6.)CorridorsNone0Nil
(7.)WLSBoundary of Wild Ass Sanctuary2.8WNW
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0Nil
(2.)Defence InstallationsNone0Nil
(3.)OthersOthersNone0Nil
(4.)Archaeological SitesNone0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.9004
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 7
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs 8,95,000/-
(iii)Period of Implementation 1 Year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Non-perennial River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond near Bodki
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.50
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 275
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.29715
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 825
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDue to the proposed expansion in unit, there will be rise indirect employment will be generated. Around 40 people will get direct employment. A total amount of Rs. 9.5 Lacs would be utilized for deve
(2.)FinancialProposed project will provide revenue to the State exchequer in the form of taxes. Indirect contribution to the State exchequer will be there due to income by way of registration of vehicles, payment
(3.)EnvironmentalProposed project is the common facility for treatment and disposal of Bio Medical Waste which will curb the menace and danger posed by irregular dumping of biomedical waste. Facility will install rain
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
    Capacity 40
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 800
5.
Energy Saving Measures:
(a)Source/Mode Solar Street Lights & LED Lights
(b)Percentage 5
(c)Quantity 50
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No adverse impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/ RA0212
(ii)Name of the EIA Consultant Envision Enviro Technologies Pvt. Ltd.
(iii)Address En-vision Tech House, 4th Floor, Opp. Bharthana Primary School, New City Light Road, Bharthana, Surat - 395007
(iv)Mobile No. 2612264004
(v)Landline No. 2612264003
(vi)Email Id info@en-vision.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 07 Dec 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Kachhadia
Designationdirector
Name of Company (Applicant Name should not be given here)DISTROMED BIO CLEAN PVT. LTD. (UNIT-II)
AddressSurvey No. 64/2, Bodaki Village, Taluka : Maliya, Dist.: Morbi, Gujarat – 363660
Print