Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Proposed Residential Project on plot bearing Sr. no. 114 Part, 115, 116 and 120/4, Village-Vasind, Taluka-Shahapur, District-Thane, Maharashtra by M/s Subal Investment & Purple Residencies. Company/Organisation Name SUBAL INVESTMENT AND PURPLE RESIDENCIES
Registered Address Sunrise Business Park, Road No. 16, Wagale Estate, Thane 400604 Maharashtra 400604 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Lalwani
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Sunrise Business Park, Road No. 16, Wagale Estate, Thane 400604,,Thane,Thane,Maharashtra-400604
(d)Pin code 400604
(e)E-mail manojlalwani7@gmail.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/MH/MIS/271666/2022
(e)Master Proposal Number(Single Window) SW/271665/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraThaneShahapurVasind
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Not Applicable
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Proposed Residential Project on plot bearing Sr. no. 114 Part, 115, 116 and 120/4, Village-Vasind, Taluka-Shahapur, District-Thane, Maharashtra
Town / Village
(Name of more than one town may be entered by separating with)
Vasind Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Plot bearing Sr. no. 114 Part, 115, 116 and 120/4
State Maharashtra District Thane
Tehshil Shahapur Pincode 421601
Nearest railway station Vasind Railway station Distance from the project site 0.5
Nearest airport Chhatrapati Shivaji International Airport Distance from the project site 53
Nearest Town/City/District Headquarters Asangaon Distance from the project site 4.5
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Vasind Grampanchayat, 1st Floor, Gram-Panchayat Bhavan, Vasind, Maharashtra 421604 Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 60790.33 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) NA
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes The current land use is Residential Cum Commercial development. The open barren plot will be developed into residential /Commercial buildings. The development is asper the Local Body.
1.2 Clearance of existing land, vegetation and buildings? No The plot is Vacant, There Are 12 nos of Existing Trees on site which will be retained. No tree Cutting involved
1.3 Creation of new land uses? Yes The land will be used for Residential as well as commercial purpose.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical investigations have been carried out.
1.5 Construction works? Yes Residential Building 1 to 9 with shops: Gr+ 7 flrs: (Residential: 1176 Shops: 34) Ht: 23.80 m, 1 Comm Bldg: Gr+1 Flrs (310 sq.m), Amenity Building: Gr + 2 flrs (shops :12 Offices: 8, Assembly Hall:1), Clubhouse: Gr +1 Upper Flr
1.6 Demolition works? No Not applicable
1.7 Temporary sites used for construction works or housing of construction workers? Yes • During the construction phase residential/nonresidential Labors are provided with housing facilities which is purely on temporary basis. • The site will have temporary sheds during construction phase, which will be later dismantled. The site office will later be demolished after completion of construction.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Excavation quantity will be reused appropriately to fill-up low-lying areas of project site and remaining will be disposed through authorized recycler.
1.9 Underground works including mining or tunneling? No No underground works including mining / Tunneling is required except minor activities like excavation of earth only for foundation, lay down of pipes, underground storage tank, electric cables, mobile STPs etc.
1.10 Reclamation works? No As this is a construction project, hence no reclamation work required.
1.11 Dredging? No NA
1.12 Offshore structures? No NA
1.13 Production and manufacturing processes? No NA
1.14 Facilities for storage of goods or materials? Yes Separate raw material storage yard will be made, which will be temporary. Construction Phase: • Cement will be separately stored under cover in bales. • Sand will be stacked neatly under tarpaulin cover. • Bricks and steel will be laid in open. Operation Phase: Storage area for Manure and Sludge will be provided.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Construction Phase: Construction waste generated shall be properly disposed off as per the municipal laws. The solid waste generated by the onsite workers shall be handed over to municipal authority for safe disposal. This will be treated/disposed off as per following: • The Wet waste will be processed in OWC. • Maximum requirement of manure for gardening will be used. • Drywaste will be handed over to recyclers. Sewage generation: Sewage Generation: 594 KLD STP technology: MBBR 2 n
1.16 Facilities for long term housing of operational workers? No No, there shall be no facilities for long term housing for operational workers
1.17 New road, rail or sea traffic during construction or operation? No The project site is adjacent to Vasind Bhatsai road will be utilized during construction and operational phase. There will be no new road and rail proposed.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No NA
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No There will be no diversion or closure of the Completed transport routes and infrastructure.
1.20 New or diverted transmission lines or pipelines? No There will be no shifting of electrical transmission line. But the project involves construction of new internal pipelines for fresh water, recycled water, rain water harvesting, sewer lines and internal power distribution lines.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No NA
1.22 Stream crossings? No There is no stream passing through the site.
1.23 Abstraction or transfers of water from ground or surface waters? No Construction Phase: Water requirement in the construction phase will be supplied depending upon construction activity will be fulfilled by private tanker water. Operation Phase: Domestic water requirement shall be served as per water NOC from Grampanchayat Flushing and landscaping water requirement shall be fulfill by onsite STP treated water. Excess treated water will be managed by proposed 2 no. of Holding ponds & Farming lands (MoU done for the same)
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No There will be no change in the drainage pattern.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes There will be movement of personnel’s, materials and machineries during the construction phase. The impact due to the same will be negligible as local people will be deployed and the construction material and machinery required will be mobilized from the local area. Thus, there will be contribution of marginal noise & vehicular emissions. Post Construction: During commissioning, there will be transportation of personnel’s and materials in and out of the project regularly. The Completed roads w
1.26 Long-term dismantling or decommissioning or restoration works? No Restoration works for the project on long term will be an ongoing activity which will not have any impact on physical environment.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No There is no decommissioning activity.
1.28 Influx of people to an area in either temporarily or permanently? Yes Construction Phase During the construction phase Labors will be provided with housing facilities which will be purely in temporary basis and during peak hours remaining will be deployed from nearby places. Operation Phase On completion of the project, there will be regular movement of residents, visitors, staff and related persons approx. 5389 no.
1.29 Introduction of alien species? No Indigenous or Natural species will be planted.
1.30 Loss of native species or genetic diversity? No NA
1.31 Any other actions? No NA
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No Undeveloped land will be used for construction purpose.
2.2 Water (expected source & competing users) unit: KLD Yes Operation phase: The water requirement will be met by the Vashind Grampanchayat/Recycled water from STP Fresh water: 437 KLD Recycled water: Flushing: 223 KLD, Gardening: 26 KLD Total Sewage generation – 594 KLD. STP capacity: 2 STP of capacity 320 KLD & 340 KLD (MBBR Technology) After treatment of sewage water will be used for flushing & Gardening. Excess treated water will be managed by proposed 2 no. of Holding ponds & Farming lands (MoU done for the same)
2.3 Minerals (MT) No NA
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes The construction materials, which will be used in the project site, will be procured from authorized local dealer
2.5 Forests and timber (source – MT) Yes For Apartments timber doors will be used. Certified wood to be used.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes Power requirement: Source: MSEDCL Construction Phase: 100 kVA Operation Phase: Connected Load: 8703 KW Maximum Demand Load: 3180 KW Number and capacity of DG sets to be used: 2 X 300 kVA Use of energy efficient, BEE labeled electrical fixtures, solar powered lighting in external common area. Energy efficient Light Emitting Diode (LED) lamps Solar Electrical Power + LED lights are complimentary in Residential areas during day time and is used effectively only in night time in
2.7 Any other natural resources (use appropriate standard units) No No other natural resources will be used.
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies No Each DG set shall be provided with proper acoustic enclosure. Oil spillage from construction machinery & vehicles, discarded containers of paints solvents etc, tarpaulins, etc. Hazardous waste will be management as per the rules
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No During the entire construction phase adequate precaution will be taken to avoid stagnation of water giving rise to mosquito breeding. Further, storm water network will be well designed to leave no stagnant water pockets, at any point of time. The storm water line will not cross wastewater line. Proper housekeeping practices will be adopted.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Positive impact due to enhanced and hygienic living conditions. Aesthetic value of area will be improved. It will provide employment opportunities to the local people in terms of skilled and unskilled labour during construction and service personnel during operational phase.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No There are no vulnerable areas
3.5 Any other causes No No other causes identified.
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No There is no activity which may generate spoil, overburden & mine waste.
4.2 Municipal waste (domestic and or commercial wastes) Yes The solid waste management facility will be proposed as per MSW rules. Garbage will be collected manually from each of the building in the garbage collection room. The garbage collected from area will be segregated into wet and dry garbage. Operation Phase: Total: 2538 kg/day Wet waste: 1476 kg/day Dry waste:1062 kg/day Treatment & Disposal: The biodegradable waste will be processed in OWC. Non- Biodegradable waste will be handed over to recyclers.
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Used oil from DG set will be stored carefully at separate location duly marked and will be sold to CPCB authorized recyclers. The mercury containing lamps will not be used in the post construction phase. However, the other hazardous waste such as waste tube lights, CFL’s, batteries (inverters), will be generated and will be sold to the registered actual users.
4.4 Other industrial process wastes No Not Applicable
4.5 Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes Dewatered / dried sludge from STP 30 kg/day will be used as manure for gardening/ landscaping.
4.7 Construction or demolition wastes Yes Solid waste during the construction phase would comprise mainly of excavated earth, concrete debris, steel scrap, scrap from insulation material for air-conditioning and packaging material. Cement bags, waste paper and cardboard packing material will be sold off to recyclers. Unusable steel scrap will also be collected at site and sold to recyclers. Excavated soil and rubble will be used for back filling and remaining material will be disposed by Covered trucks to the authorized sites.
4.8 Redundant machinery or equipment No All equipments used for the construction will be maintained on regular basis
4.9 Contaminated soils or other materials No No contaminated soil found.
4.10 Agricultural wastes No NA
4.11 Other solid wastes No NA
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes • Exhaust emission generated from Auto mobiles will be checked by proper PUC certificate. • Stationary machine-like DG set will be properly maintained to reduce air pollution.
5.2 Emissions from production processes No There is no production as the proposed project is residential cum commercial complex.
5.3 Emissions from materials handling including storage or transport Yes • Emissions will be generated, while handling and transportation of materials like cement, sand etc. to site, will be temporary in nature. • RMC shall be used preferably to reduce fugitive emissions due to material handling. • Regular water sprinkling & tarpaulin covers will be provided to cover dust emissions.
5.4 Emissions from construction activities including plant and equipment Yes The project may cause rise in dust levels during construction phase. Precautions will be taken to reduce dust generation during construction phase. • Mixed use will eliminate the handling of cement, sand and concrete thus dust emission will be minimized. • Mixed use will also reduce the trucks trips. • Tarpaulins will be used to cover trucks carrying debris. • Water sprinkling will be done at regular intervals to reduce control of dust generation.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Construction Phase: Dust and odour generation due to • Movement of vehicles • Material handling and storage. • Solid waste disposal. • Black water disposal. Mitigation measures: • Sprinkling water on unpaved roads. • Covering materials storage shed with tarpaulin sheet or G.I metal sheets to reduce dissipation of dust to surrounding. • Solid waste shall be collected at a designated location away from the working area for disposal and collection by municipal authority. • The liquid w
5.6 Emissions from incineration of waste No NA
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No No such practices shall be entertained.
5.8 Emissions from any other sources No NA
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Noise generation from construction equipment’s used for drilling, cutting operations. During Operation Phase, Noise will be generated due to operation of DG sets. For control of noise following measures shall be adopted: • Properly maintained equipment’s with mufflers will be used. • High noise generating construction activities would be carried out only during day time. • Workers working near high noise construction machinery would be provided with ear muffs/ear plugs.
6.2 From industrial or similar processes No Not Applicable
6.3 From construction or demolition Yes The construction noise will be localized, intermittent in nature. The construction activities will include the following noise generating activities; 1. Excavation activities etc. 2. Concreting and mixing. 3. Heavy vehicle movement. 4. Operation of D.G sets. Following precautions shall be taken to control noise pollution: • High noise generating construction activities would be carried out only during day time. • Installation, use and maintenance of mufflers on equipment. • Workers
6.4 From blasting or piling Yes Piling foundation is proposed
6.5 From construction or operational traffic Yes Construction phase: There will be transport of materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase: • The vehicular parking will be restricted only in the adequate parking area provided, which would help in reducing noise pollution due to traffic congestion. • Local native plants will be used in plantation which will help to reduce the impact of air and noise pollu
6.6 From lighting or cooling systems No NA
6.7 From any other sources No NA
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No NA
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No After treatment of sewage, this treated sewage water will be used for flushing & Gardening. Excess treated water will be managed by proposed 2 no. of Holding ponds & Farming lands (MoU done for the same)
7.3 By deposition of pollutants emitted to air into the land or into water No Dust will be generated during construction phase from earthworks and movement of vehicles. Appropriate dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG exhaust will be discharged at stipulated height by providing adequate stack height to the DG sets.
7.4 From any other sources No NA
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No NA
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances No Each DG set shall be provided with proper acoustic enclosure. Fire Fighting System will be provided.
8.2 From any other causes Yes There is a risk of accident during construction however proper safety measures will be taken.
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? No The project falls under seismic zone-III as per IS1893 (Part-1):2002. The structural design shall be accordingly performed. Hence, no risk due to natural hazards is envisaged.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Supporting and ancillary development will take place. Internal Roads, Rainwater Harvesting, STP etc. will be provided. The project provides well residential housing area for the occupants
9.2 Lead to after-use of the site, which could have an impact on the environment No NA
9.3 Set a precedent for later developments Yes This will create job opportunity for support staff like security, maintenance, household workers etc
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc.
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No NA
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Bhatsa River: 0.03 km Tansa Wildlife Sanctuary: 13.6 km
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Nil
4 Inland, coastal, marine or underground waters Yes Bhatsa River: 0.03 km
5 State, National boundaries No NA
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No NA
7 Defence installations No No defense installation in the neighborhood.
8 Densely populated or built-up area Yes Residential, Commercial area around the site.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Schools, hospitals and small temples are observed in 10 km radius. Hospital: PHC Vasind Hospital 400m School: G.K. Gurukul-1 Km New Ideal School-2 Km College: G.K.S College of Arts, Commerce and Science -2 km
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No The project will meet water from Grampanchayat.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No All parameters of Air, water and Noise etc. will be maintained within the permissible limit.
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No This area is generally plain& come under seismic zone –III according to Indian Standard Seismic zoning map.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)25/08/2022Plz submit compliance as per 248 Day 1 (Part A) Sr. No. 27 MOM
(2.)27/08/2022Hereby sharing compliance as per 248 SEIAA meeting-Day 1(Part A)EDS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Lalwani
DesignationPartner
Name of Company (Applicant Name should not be given here)SUBAL INVESTMENT AND PURPLE RESIDENCIES
AddressSunrise Business Park, Road No. 16, Wagale Estate, Thane 400604