Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Modernization of an Upscale and Mid Market Hotel with Large Conferencing Facility (Formerly a Hotel Complex & Convention Centre)
(b)Name of the Company / Organisation BAMBOO HOTEL AND GLOBAL CENTRE DELHI PRIVATE LIMITED
(c)Registered Address Asset Area 13, Aerocity, IGI Airport,,New Delhi,Delhi-110037
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Shatrumardan Tiwari
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address
(d)Pin code 110037
(e)E-mail dialapprovals@dbg.co.in
(f)Telephone No. 11-27470513
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/DL/MIS/76173/2016
(e)Master Proposal Number(Single Window) SW/269760/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Asset-13, DIAL Hospitality Distt. near IGI Airport
(b)Pincode 110037
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 33
Second 1.71
From
Degree 28
Minutes 32
Second 55.82
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 7
Second 12.23
From
Degree 77
Minutes 7
Second 22.15
(e)Survey of India Topo Sheet No. 53H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 237
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5.09
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)DelhiSouth WestVasant Vihar-
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 21-35/2017-IA-III
(b)Date of Apply of EC 28 Dec 2016
(c)Date of Issue of EC 31 Dec 1899
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA notification 2006 & its amendments all
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Jaipur
(iii)Letter No. 4930/10
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built up area351081.49-6081.49345000OtherssqmOthersNot Applicable
(2.)plot area31163.13031163.13OtherssqmOthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Power Load24000-622017780Unit- KVA
(2.)DG sets14x2000-10x 20004x 2000Unit- KVA
(3.)Population12073818020253Unit- No.
(4.)STP capacity1320991419Unit- KLD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Apr 2022
(iv)Valid Upto 01 Apr 2022
(v)File No. NA
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1200
(b) Funds Allocated for Environment Management (Capital) (in crores) 12.08
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.99
(e) Funds Allocated for Environment Management Capital(%) 1.01
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Estimated Building COnstruction Material (Steel, Cement, Aggregates, RMC, etc.)0OthersNAlocal marketRoad10 Otherslist of materialsCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 25 Feb 2022 To 27 Feb 2022
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube92.2571.2873.2160
(2.)PM10Micro Gram per Meter Cube130.28103.58110.24100
(3.)OthersCOMili Gram per Meter Cube1.340.971.22
(4.)SO2Micro Gram per Meter Cube11.78.710.980
(5.)NOxMicro Gram per Meter Cube31.524.3030.280
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.18.16.58.5
(2.)Chloridesmg/l670670250250
(3.)TDSmg/l18611861500500
(4.)Fluoridemg/l0.940.9411
(5.)Heavy MetalsLeadmg/l0.0010.0010.010.01
(6.)TSSmg/l1.941.9411
(7.)Total Hardnessmg/l368368200200
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l44D
(2.)BODmg/l2424D
(3.)OthersTDSmg/l519.2519.2D
(4.)pHNA7.57.5D
(5.)CODmg/l8080D
    14.4.     No. of Ambient Noise Monitoring Locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.861.865
(2.)Leq(Night)A-weighted decibels(dB(A))54.754.755
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram15.415.4
(2.)K(Potassium)Milligram per Kilogram48.748.7
(3.)N(Nitrogen)Milligram per Kilogram67.467.4
(4.)pH7.37.3
(5.)Electric ConductivityOthersmicro siemens per centimeters440.8440.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi International Airport Limited (DIAL)6820 Not Appliacble PipelineOthersPipeline-12 Jun 2010682
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, flushing & miscellaneous8021419in house STP based on MBBR technologyReuse within the Plant & Recycling,Green Belt Renewal Plant,Otherslosses of 80 KLD72280
16.1.
(a)Total Waste Water Generation 802
(b)Total Discharged Water 80
(c)Total Reused Water 722
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non-biodegradable WasteMunicipal Solid Waste1274.945Tons10RoadAuthorized Recyclers
(2.)E-WasteE Waste0.024Tons10RoadAuthorized Recyclers
(3.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.67Kilolitre10RoadAuthorized Recyclers
(4.)Biodegradable WasteMunicipal Solid Waste850.085Tons0.1OthersNAOthersWill be treated in OWC within the project site.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)CONA1.340.90.0031.3432
(2.)PM10Microgram per Meter Cube1300.90.300130.3100
(3.)PM2.5Microgram per Meter Cube92.250.90.3292.5760
(4.)SO2Microgram per Meter Cube11.70.90.9812.6880
(5.)NOxMicrogram per Meter Cube31.50.90.9532.4580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)4 x 2000low sulfur diesel380.3PM2.50.19
(2.)4 x 2000low sulfur diesel380.3PM100.21
(3.)4 x 2000low sulfur siesel380.3NOx ,NO20.1
(4.)4 x 2000low sulfur diesel380.3SO20.46
(5.)4 x 2000low sulfur diesel380.3OthersCO1.53
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17780
(b)Source BSES Rajdhani Power Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4 x 2000 KVA
(e)Stack Height (in m) 38
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.11631
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.11631
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4734.87
(b)Waste/Barren Land 88.1
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 85.85
(e)Settlements 0
(f)Industrial 24758.61
(g)Forest 358.28
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Scrub land 2193.25
    Total 32218.96
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersPlot area3.11631
Total 3.11631
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNaraina9.25NNE
(2.)ESZsAsola Wildlife Sanctuary with ESZ9.65SE
(3.)Wildlife CorridorsNone0NA
(4.)ESAsNone0NA
(5.)WLSAsola Wildlife Sanctuary10.57SE
(6.)NPANone0NA
(7.)CorridorsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesTomb of Sultan Ghari2.21SSE
(2.)Defence InstallationsAir Force Station Rajokri4.41SSW
(3.)ForestRajokari Protective Forest2.89S
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.1163
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sanjay Van Lake
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 5.09
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 4925
(c)Temporary Employment- During Construction 250
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 5175
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt08102.498102
(2.)Percentage of Total Project Area02626
(3.)No. of Plants0400400
(4.)Funds Allocated04230000042300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen area of 8102.49 sqm will be developed.
(2.)SocialDirect and indirect employment will be gemerated.
(3.)FinancialRevenue will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 43
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 31163.13
(e)Total built up area (sqm) 345000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
    Capacity 613
(b)No. of Recharge Pits 2
    Capacity 112
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 1604
5.
Energy Saving Measures:
(a)Source/Mode Solar energy
(b)Percentage 2
(c)Quantity 355.6
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no impact on water body and drainage
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA 0143
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th Floor, NN Mall, Sector - 3, Rohini, New Delhi-110085
(iv)Mobile No. 9871591330
(v)Landline No. 49281360
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 26 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)19/07/2022The Proposal has been submitted under the head of Fresh EC inspite of the fact that the project is under construction in view of previous EC issued on 05.03.2019. Please clarify and resubmit.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShatrumardan Tiwari
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)BAMBOO HOTEL AND GLOBAL CENTRE DELHI PRIVATE LIMITED
AddressAsset Area 13, Aerocity, IGI Airport
Print