Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) CONSTRUCTION OF MEGA COMMERCIAL DEVELOPMENT AT PLOT NO. LP 1B 02 GATEWAY DISTRICT, AEROCITY, INDIRA GANDHI INTERNATIONAL AIRPORT, NEW DELHI
(b)Name of the Company / Organisation ANGELICA DEVELOPERS LIMITED
(c)Registered Address 3rd Floor, Worldmark-2, Asset-8, Aerocity, NH-8, New Delhi,,South,Delhi-110037
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Rajesh Kumar
(b)Designation (Owner/ Partner/ CEO) ChiefProjects
(c)Address 3rd Floor, Worldmark-2, Asset-8, Aerocity, NH-8, New Delhi,South,Delhi-110037
(d)Pin code 110037
(e)E-mail eiaangelicadevelopers@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/DL/MIS/76154/2021
(e)Master Proposal Number(Single Window) SW/269663/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. LP 1B 02
(b)Pincode 110037
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 33
Second 0902
From
Degree 28
Minutes 33
Second 0823
(d)Bounded Longitudes (East)
From
Degree 77
Minutes 07
Second 3190
From
Degree 77
Minutes 07
Second 4122
(e)Survey of India Topo Sheet No. 53H/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 240
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 13.68
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)DelhiSouth WestVasant ViharIGI Airport
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number DPCC/SEIAA-IV/C-370(TOR)/DL/2021/3391-3394
(c)Date of Apply of TOR 13 Dec 2021
(d)Date of Issue of TOR / Standard ToR 07 Mar 2022
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason It is a Building and Construction Project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Proposed Built up area446597.00sqm
(2.)Plot Area92146.77sqm
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)roposed Built up area446597.00OthersSqmOthersNA
(2.)Plot Area92146.77OthersSqmOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1150
(b) Funds Allocated for Environment Management (Capital) (in crores) 6.81
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.24
(e) Funds Allocated for Environment Management Capital(%) 0.59
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)-0OthersNa as it is a building and Construction project0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2021 To 28 Feb 2022
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube1665715760
(2.)SO2Micro Gram per Meter Cube12.96.012.7680
(3.)NOxMicro Gram per Meter Cube35.8020.635.3080
(4.)PM10Micro Gram per Meter Cube30493284.50100
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l106010605002000
(2.)Chloridesmg/l2562562501000
(3.)Total Hardnessmg/l392392200600
(4.)pHNA7.487.486.58.5
(5.)Fluoridemg/l0.210.2111.5
(6.)TSSNA0000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2626D
(2.)CODmg/l8888D
(3.)DOmg/l3.13.1D
(4.)pHNA7.547.54D
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.357.365
(2.)Leq(Night)A-weighted decibels(dB(A))56.249.955
    14.5.     No. of Soil Sample Monitored Locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram5645
(2.)P(Phosphorus)Milligram per Kilogram9.07.7
(3.)Electric ConductivityOthersmicro Siemen/cm504477
(4.)pH7.957.82
(5.)N(Nitrogen)Milligram per Kilogram56.049.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 38 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPipeline4220.1Copy of Permission LetterPipelineOthersPipeline0111 Apr 2022500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Onsite8531025Onsite STPReuse within the Plant & RecyclingPublic Sewer853
16.1.
(a)Total Waste Water Generation 853
(b)Total Discharged Water 0
(c)Total Reused Water 853
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste3040.45Tons0.1Road,OthersOnsite OWCAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube187.770.53.37193.14100
(2.)PM2.5Microgram per Meter Cube99.190.51.95101.1460
(3.)SO2Microgram per Meter Cube10.400.512.623.080
(4.)NOxMicrogram per Meter Cube29.680.559.188.7880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG StackLow Sulphur Diesel00.45PM10191.79
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 21065
(b)Source BSES Rajdhani Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 22500 KVA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 9.21
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 9.21
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Private 9.21
    Total 9.21
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt3.1Sqm
Total 3.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)NPANA0NA
(6.)ESZsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsDelhi Cantonment5.57NE
(3.)ForestNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.21
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species PEACOCK
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 2.25 Lakh
(iii)Period of Implementation 5 Year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 1200
(d)Temporary Employment- During Operation 100
(e)No. of working days 300
(f)Total Manpower 1500
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 3.10
(b)Percentage of Total Project Area 33.66
(c)No. of Plants to be Planted 1152
(d)Funds Allocated for Plantation 945000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated
(2.)SocialEmployment will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 35.95
(b)Total No. of Flats to be Build .
(c)No. of Buildings .
(d)Total plot area (sqm) 92146.77
(e)Total built up area (sqm) 446597.00
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage .
    Capacity .
(b)No. of Recharge Pits 17
    Capacity 38.46
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4870
5.
Energy Saving Measures:
(a)Source/Mode As per ECBC
(b)Percentage 9
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/18021/RA0098
(ii)Name of the EIA Consultant Ind Tech House Consult
(iii)Address G 8/6, Ground Floor, Sector 11, Rohini, New Delhi-110085
(iv)Mobile No. 8860080363
(v)Landline No. 0114657036
(vi)Email Id ithconsult@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 24 Jul 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)14/06/2022In the project under consideration namely "Construction of Mega Commercial Development at Plot No. LP 1B 02 Gateway District, Aerocity, Indira Gandhi International Airport, New Delhi", the TOR was issued by SEIAA, Delhi vide Proposal No. SIA/DL/MIS/68937/2021 on 07.03.2022. However the EC has been applied through a fresh Proposal No. SIA/DL/MIS/76154/2021. Kindly explain the reason for not applying the EC from the already existing ID/ Proposal No. existing on the PARIVESH Portal to which the Form I and Form IA are linked.
(2.)16/06/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)05/07/2022Please refer Minutes of Meeting of 107th SEAC Meeting held on 01.07.2022 (uploaded on PARIVESH Portal) for ADS.
(2.)22/07/2022Dear Sir Please find enclosed herewith complete reply for your kind perusal.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRajesh Kumar
DesignationChiefProjects
Name of Company (Applicant Name should not be given here)ANGELICA DEVELOPERS LIMITED
Address3rd Floor, Worldmark-2, Asset-8, Aerocity, NH-8, New Delhi