Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Padampuri Stone Quarry 2
(b)Name of the Company / Organisation TAHSILDAR NUAPADA
(c)Registered Address Tahsil Office At/Po/Dist- Nuapada,,Nuapada,Orissa-766105
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant TAHSILDAR NUAPADA
(b)Designation (Owner/ Partner/ CEO) ON BEHALF OF LESSEE
(c)Address Tahsil Office At/Po/Dist- Nuapada,Nuapada,Orissa-766105
(d)Pin code 766105
(e)E-mail tahsildar.nuapada@rediffmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/OR/MIN/63923/2021
(e)Master Proposal Number(Single Window) SW/268321/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No-76 Plot No - 187, 227
(b)Pincode 766104
(c)Bounded Latitudes (North)
From
Degree 20
Minutes 49
Second 36.76
From
Degree 20
Minutes 49
Second 39.31
(d)Bounded Longitudes (East)
From
Degree 82
Minutes 32
Second 55.67
From
Degree 82
Minutes 33
Second 09.01
(e)Survey of India Topo Sheet No. 64L/09
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 368
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 7.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaNuapadaNuapadaPadampuri
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 63923/142-MINB1/06-2021
(b)Date of Apply of TOR 10 Jul 2021
(c)Date of Issue of TOR / Standard ToR 04 Oct 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Nov 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Dec 2021
Distance of Public Hearing Venue from the Proposed Project :2
At Gram Panchayat Office, Godfula situated in plot no- 875 of khata no- 227 of Maouza Godfula, Dist- Naupada
State :Orissa
District :Nuapada
Tehsil :Nuapada
Village :Godfula
921. Blasting should be stopped or locals demanded controlled blasting. 2. Employment to be generated to reduce migration. 3. Mining will help for the livelihood of locals.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Padampuri Stone Qaurry 2Semi Mechanized
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Area - 2.023 ha3040Otherscubic meter per annumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.24
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.094
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.005
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0454
(e) Funds Allocated for Environment Management Capital(%) 39.17
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0.08
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0.08
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel0.08Kilo Litre per DayOpen MarketRoad1.0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 28 Feb 2022
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube20.579.5819.8680
(2.)PM10Micro Gram per Meter Cube75.852.7074.82100
(3.)PM2.5Micro Gram per Meter Cube37.8219.2037.6360
(4.)SO2Micro Gram per Meter Cube13.515.513.2480
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)pHNA7.677.166.58.5
(3.)Fluoridemg/l0.150.0911.5
(4.)Chloridesmg/l89752501000
(5.)TDSmg/l3543285002000
(6.)Total Hardnessmg/l261229200600
(7.)Heavy MetalsAsmg/l000.010.05
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l1210B
(2.)DOmg/l7.16.8B
(3.)BODmg/l3.93.7B
(4.)pHNA7.687.27B
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.8243.7855/75
(2.)Leq(Night)A-weighted decibels(dB(A))47.9535.4745/70
    14.5.     No. of Soil Sample Monitored Locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram12.3410.98
(2.)pH7.607.20
(3.)K(Potassium)Milligram per Kilogram57.3450.32
(4.)N(Nitrogen)Kilogram per hectare340326
(5.)Electric ConductivityOthersmicrosiemens per centimeter337276
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.25 To 12.64
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.83 To 5.38
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Othersby tanker supply5.02.50Copy of Permission LettermodeOthersby roadOthersby tanker supply0005 Jan 20225.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.3780Septic tankOthersseptic tank0.3780
16.1.
(a)Total Waste Water Generation 0.378
(b)Total Discharged Water 0
(c)Total Reused Water 0.378
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mine wasteOthersRock mass waste1200Tons0RoadOthersDevelopment and maintenance of road
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.860.20.00119.86180
(2.)PM10Microgram per Meter Cube74.820.21.276.02100
(3.)SO2Microgram per Meter Cube13.240.20.00113.24180
(4.)PM2.5Microgram per Meter Cube37.630.20.00137.63160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source From nearby villages
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 2.023
(d)Revenue Land 0
(e)Other Land 0
    Total Land 2.023
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 26429.25
(b)Waste/Barren Land 229.30
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 388.35
(e)Settlements 512.44
(f)Industrial 0
(g)Forest 4861.66
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 32420.999999999996
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.023Along approach road
Total 0.023
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA10None within study area
(2.)WLSNA10None within study area
(3.)NPANA10None within study area
(4.)ESAsNA10None within study area
(5.)ESZsNA10None within study area
(6.)Wildlife CorridorsNA10None within study area
(7.)CorridorsNA10None within study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKanarhaira RF2.0North direction
(2.)Archaeological SitesNone10None within study area
(3.)Defence InstallationsNone10None within study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.023
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Jonk river
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 8.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 12
(e)No. of working days 220
(f)Total Manpower 12
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.644
(b)Percentage of Total Project Area 31.83
(c)No. of Plants to be Planted 1650
(d)Funds Allocated for Plantation 330000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThis project will provide direct/indirect employment opportunities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)StoneMinor
2.
Mine Capacity in ROM (Run of Mine) 3040
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 1808/BZ
(b)Date of Approval 01 Sep 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 2.023
(f)Approved Capacity 3040
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.9679768
(b)Mineable Reserves (Million Ton) 0.45123988
(c)Extractable Reserves(Million Ton) 0.45123988
(d)Percent(%) of Extraction 47
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 0.26
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 11
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 2.023
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 31 Jul 2020
(iii)Validity of LOI 10
(iv)Reference No. of LOI 3141/Touzi
(c)Whether Lease Deed Executed ? No
(i)Reason thereof New lease
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof New lease
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.007
(iii)Height (in meter) 8
(iv)Quantity (in Million Cubic meter) 0.00056
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0.228
(b)Depth (in meter) 5
(c)Volume (in Million Cubic meter) 0.0114
12.
Details of Quarry:
(a)Final Void of 0.228 (hectare) at a Depth of 5 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 2.023
13.
Details of Transportation:
(a)In Pit/Underground to Surface surface
(b)Surface to Siding/Loading loading
(c)Transportation / Conveyor Details by road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND04861.664861.66
(2.)WASTE LAND2.023227.277229.29999999999998
(3.)SURFACE WATER BODIES0388.35388.35
(4.)SETTLEMENTS0512.44512.44
(5.)AGRICULTURE LAND026429.2526429.25
(6.)GRAZING LAND000
TOTAL2.02332418.97732421
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)OtherInfrastructure000.0030.003
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)INTERNAL OB DUMPS000.0070.007
(5.)ROADS0000
(6.)GREEN BELT0.621000.621
(7.)VIRGIN AREA001.1641.164
(8.)EXCAVATION/QUARRY00.22800.228
(9.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL0.6210.2281.17402.023
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.007
(c)Quarry(in hectare) 2.023
(d)Safety Zone(in hectare) 0.621
(e)Final Void of 0.228 (hectare) at a Depth of 5 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0.003
(h)Total afforestation plant (in hectare) 0.644
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)202200000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1992/IA0053
(ii)Name of the EIA Consultant P & M Solution
(iii)Address C-88, First Floor, Sector 65, Noida, UP.
(iv)Mobile No. 8826287364
(v)Landline No. 0120432172
(vi)Email Id pmsolutionbxr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 10 Dec 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)06/07/2022The NABET Consultant shall submit correct proposal in the required format. The PP shall correct the project name with actual lease area of individual mines along with location. The proposal is returned herewith for compliance.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTAHSILDAR NUAPADA
DesignationON BEHALF OF LESSEE
Name of Company (Applicant Name should not be given here)TAHSILDAR NUAPADA
AddressTahsil Office At/Po/Dist- Nuapada
Print