Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Residential Development Project
(b)Name of the Company / Organisation NYATI REALTOR LLP
(c)Registered Address Nyati Unitree, East Wing Nagar Road, Yerawada, Pune,,Pune,Maharashtra-411006
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Piyush Nyati
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Nyati Unitree, East Wing Nagar Road, Yerawada, Pune,,Haveli,Pune,Maharashtra-411006
(d)Pin code 411006
(e)E-mail ecnyatiesteban@gmail.com
(f)Telephone No. 20-66863333
(g)Fax No. 66863332
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/MIS/75289/1993
(e)Master Proposal Number(Single Window) SW/267887/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 4/3/1 + 4/3/2 + 4/3/3 + 4/1A + 4/1B/1 + 4/1B/2 + 4
(b)Pincode 411028
(c)Bounded Latitudes (North)
From
Degree 18
Minutes 27
Second 30.61
From
Degree 18
Minutes 27
Second 22.39
(d)Bounded Longitudes (East)
From
Degree 73
Minutes 55
Second 14.20
From
Degree 73
Minutes 55
Second 1.42
(e)Survey of India Topo Sheet No. E 43H15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 634
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 8.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraPuneHaveliUndri
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SEAC-2010/CR-829/TC- 2
(b)Date of Apply of EC 11 Jan 1993
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA notification 2006
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-1285/RON/2020-NGP/8091
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)built up area55188.71233045.42288234.13Otherssq.m.Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)7 Existing Buildings A1, A2,A3,B,C1,C2,C3P+12 FloorsB+UG.+11 FloorsB+UG.+11 Floors
(2.)4 buildings F1, F2, G1, G2-B+ST.+27 FloorsB+ST.+27 FloorsChange in planning
(3.)5 buildings D1,D2,D3,D4,D5-B+P+ST.+30 FloorsB+P+ST.+30 FloorsChange in planning
(4.)1 building G3-B+P+G+27 FloorsB+P+G+27 FloorsChange in planning
(5.)3 Buildings E1, E2, E3-B+St.+28 FloorB+St.+28 FloorChange in Planning
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 May 2021
(iv)Valid Upto 31 Jan 2022
(v)File No. 1.0/CC/UAN NO. 0000108738/CO 2105000668
(vi)Application No. MPCB-CONSENT- 0000108738
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 593.32
(b) Funds Allocated for Environment Management (Capital) (in crores) 11.61
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 1.0
(e) Funds Allocated for Environment Management Capital(%) 1.96
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)other0Others00Road0 Others0Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2021 To 31 Dec 2021
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube60.3248.0760.30100
(2.)NOxMicro Gram per Meter Cube17.6614.2617.6580
(3.)OthersCOMicro Gram per Meter Cube0.420.360.422
(4.)PM2.5Micro Gram per Meter Cube37.0927.0737.0360
(5.)SO2Micro Gram per Meter Cube17.2912.7117.2580
    14.2.     No. of Ground Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.56.86.58.5
(2.)Heavy MetalsFemg/l0.90.211
(3.)TSSmg/l1310100100
(4.)Fluoridemg/l0.90.351.51.5
(5.)TDSmg/l410.77349.405001500
(6.)Chloridesmg/l12286.710001000
(7.)Total Hardnessmg/l204.11156.22600600
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.56.8C
(2.)DOmg/l2.81.5C
(3.)CODmg/l6246C
(4.)BODmg/l20.317.25C
    14.4.     No. of Ambient Noise Monitoring Locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.0151.5575
(2.)Leq(Night)A-weighted decibels(dB(A))50.4441.5370
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.48.7
(2.)K(Potassium)Milligram per Kilogram1021.7748.7
(3.)Electric ConductivityMillisiemens per Centimetre73.354.8
(4.)P(Phosphorus)Milligram per Kilogram842.1258.5
(5.)N(Nitrogen)Kilogram per hectare0.480.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 9 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 7 To 8
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPMC132314Copy of Permission LetterPipelineOtherspipeline734923 Mar 20221323
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage11921215MBBROthersReused for Flushing & Gardening purpose518674
16.1.
(a)Total Waste Water Generation 1192
(b)Total Discharged Water 674
(c)Total Reused Water 518
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Wet WasteMunicipal Solid Waste1073.1Tons0OthersOnsite Traeatment of wet waste disposalOthersOWC will be provided on site
(2.)Dry WasteMunicipal Solid Waste717.22Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.161.6723.4285.58100
(2.)PM2.5Microgram per Meter Cube45.281.7515.2460.5260
(3.)SO2Microgram per Meter Cube25.621.9710.5136.1380
(4.)Others(Specify)COMicrogram per Meter Cube0.11.750.0470.0474
(5.)NOxMicrogram per Meter Cube28.721.7822.4951.2180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1 DG set Of 320KVAHSD40.1SO20.0007
(2.)7 DG sets of 400 KVAHSD40.2NOx0.3429
(3.)2 DG Sets of 320 KVA (Existing)HSD40.1PM10,PM2.50.0039
(4.)2 DG Sets of 320 KVA ( Existing)HSD40.1NOx0.0784
(5.)2 DG Sets of 320 KVA (Existing)HSD40.1SO20.0014
(6.)7 DG sets of 400 KVAHSD40.2PM10,PM2.50.0171
(7.)1 Dg set of 320 KVAHSD40.1NOx0.0392
(8.)1 DG Set of 320 KVAHSD40.1PM10,PM2.50.0020
(9.)7 Dg sets of 400 KVAHSD40.2SO20.0063
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15726
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Existing- 2 DG with 320KVA, Proposed- 1 DG with 32
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 8.72
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 8.72
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 6527.69
(b)Waste/Barren Land 6813.18
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 306.81
(e)Settlements 11001.77
(f)Industrial 0
(g)Forest 6767.46
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 31416.91
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area8.72This is Residential Developement Project
Total 8.72
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0Not present in 10km study area
(2.)ESZsNA0Not present in 10km study area
(3.)Wildlife CorridorsNA0Not present in 10km study area
(4.)CorridorsNA0Not present in 10km study area
(5.)Critically Polluted AreaNA0Not present in 10km study area
(6.)NPANA0Not present in 10km study area
(7.)ESAsNA0Not present in 10km study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0No forest area falls under 10 km study area
(2.)Archaeological SitesNA0No forest area falls under 10 km study area
(3.)OthersNANA0No forest area falls under 10 km study area
(4.)Defence InstallationsNA0No forest area falls under 10 km study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 23
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 8.7
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 9845
(c)Temporary Employment- During Construction 70
(d)Temporary Employment- During Operation 50
(e)No. of working days 365
(f)Total Manpower 9995
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt175072759025
(2.)Percentage of Total Project Area31114
(3.)No. of Plants211688899
(4.)Funds Allocated066980176698017
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEnvironment Infrastructure proposed in project will help in waste minimization, resource recovery & reuse
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 98.40
(b)Total No. of Flats to be Build 1776
(c)No. of Buildings 20
(d)Total plot area (sqm) 87281.0
(e)Total built up area (sqm) 288234.13
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 17
    Capacity 115
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4 Wheeler: 1791 Nos, 2 Wheeler: 4833 Nos.
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 14.5
(c)Quantity 900
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA0028
(ii)Name of the EIA Consultant Sneha Hi Tech Products
(iii)Address No. 8 & 28. 4th Cross, Marutinagar, Chandra Layout 80ft Road Nagarabhavi, Bangalore- 560072
(iv)Mobile No. 9167177403
(v)Landline No. 0802318011
(vi)Email Id snehahitech2020@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 06 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPiyush Nyati
DesignationDirector
Name of Company (Applicant Name should not be given here)NYATI REALTOR LLP
AddressNyati Unitree, East Wing Nagar Road, Yerawada, Pune
Print