| 1. | | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | | Details of Project: | | (a)Name of the project(s) | Development of fishing harbour at Sutrapada, Gir Somnath District by Fisheries Department Government of Gujarat | | (b)Name of the Company / Organisation | FISHERIES DEPARTMENT | | (c)Registered Address | 3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar,,Bangalore Urban,Karnataka-382010 | | (d)Legal Status of the Company | State Government | |
|
| 2. | | Address for the correspondence: | | (a)Name of the Applicant | Mahammad Shahid | | (b)Designation (Owner/ Partner/ CEO) | Commissioner of Fishries | | (c)Address | 3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar,,Gandhinagar,Gandhinagar,Gujarat-382010 | | (d)Pin code | 382010 | | (e)E-mail | comfis.guj@gmail.com | | (f)Telephone No. | 79-23253742 | | (g)Fax No. | 23253730 | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
|
| 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 7(e) Ports, Harbours
| | (b)Minor Project/Activity | NIL | | (c)Category | B1 | | (d)Proposal Number | SIA/GJ/NCP/74850/2016 | | (e)Master Proposal Number(Single Window) | SW/266436/2022 | | (f)EAC concerned (for category A Projects only) | INFRA-1 | | (g)Project Type | Fresh EC |
|
|
| 4. | | Location of the Project: | | (a)Plot/Survey/Khasra No. | At Sutrapada, Gir Somnath, Gujarat | | (b)Pincode | 362275 | | (c)Bounded Latitudes (North) | | | From | | | Degree | 20 | | Minutes | 50 | | Second | 25.81 | | From | | | Degree | 20 | | Minutes | 50 | | Second | 9.24 | | (d)Bounded Longitudes (East) | | | From | | | Degree | 70 | | Minutes | 28 | | Second | 27.41 | | From | | | Degree | 70 | | Minutes | 28 | | Second | 50.07 | | (e)Survey of India Topo Sheet No. | 41L/9, 41L/10, 41L/5, 41L/1 | | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | | (g)Maximum Elevation Above Means Sea Level(AMSL) | 4 | | (h)Uploaded (kml) File | Copy of Kml File  | | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | | (j)Seismic Zone | 3 | |
|
| 5. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Gujarat | |
|
|
| Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Gujarat | Gir Somnath | Sutrapada | Sutrapada | |
|
| 6. | | Details of Terms of Reference (ToR): | | (a)Whether TOR is mandatory for submitting application | Yes | | (b)MoEF&CC / SEIAA File Number | SIA/GJ/107411/2016 | | (c)Date of Apply of TOR | 21 Nov 2016 | | (d)Date of Issue of TOR / Standard ToR | 17 Jun 2021 | | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
| 7. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | No | | (b)Whether details of Public Hearing available? | Yes | | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
| 7.1. Details of Public Hearing |
|---|
|
| S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
|---|
| (1.) | | | Copy of Public Hearing : | Copy of Public Hearing | | Date : | 14 Sep 2021 | | Distance of Public Hearing Venue from the Proposed Project : | 1.20 |
| Shri Sutrapada Samasta Kharava Samaj Hall, Behind Taluka Panchayat Seva Sadan and Shree Shivsagar Primary School, Po. - Sutrapada, Ta. Sutrapada, Dist. Gir Somnath | | State : | Gujarat | | District : | Gir Somnath | | Tehsil : | Sutrapada | | Village : | Sutrapada |
| 88 | Sutrapada village consists of 100%
fisherman population. Approx 6000-7000
population is engaged in fisheries related
activities. This project will generate
employment in Sutrapada and surrounding | Others | Additional District Collector | |
| 8. | | Details of Project Configuration/Product: | |
|
| 8.1. Project Configuration |
|---|
| S. No. | Plant/Equipment/Facility | Configuration | Remarks |
|---|
| (1.) | Beach landing/RCC slope hard | 200 m | | | (2.) | Dormitory (1no) | (1 x 1274 = 1274 Sq.M) | | | (3.) | Landing Quay | 185 m | | | (4.) | Western breakwater | 730m | | | (5.) | Admin building (1no) | 1 x 480 = 480 Sq.M | | | (6.) | Outfitting Quay | 87 m | | | (7.) | Eastern Breakwater | 1065m | | | (8.) | Pre-processing hall cum Auction & fish drying yard | 3550 Sq.m.(2 Nos) | | | (9.) | Radio station (1no) | 1 x 148 = 148 Sq.M | | | (10.) | Effluent Treatment plant: | 400 Sq. m. | | | (11.) | Fuel outlets: | 182 Sq. m. | | | (12.) | Canteen building (1no) | (1 x 316 = 316 Sq.M) | | | (13.) | Security room (1no) | (1 x 32 = 32 Sq.M) | | | (14.) | Repair quay | 37 m | | | (15.) | Gear shed (5no) | (5 x 243 = 1216 Sq.M) | | | (16.) | Toilets | 138 Sq.m | | | (17.) | Restaurant: | 316 Sq. m | | | (18.) | Workshop (1no) | (1 x 228 = 228 Sq.M) | | | (19.) | Community hall (1no) | 1 x 600 = 600 Sq.M | | | (20.) | Vehicle parking area | 7996 sqm | | | (21.) | Fuel bunkering area | 182 sqm | | | (22.) | Net mending shed: | 1033 Sq.m | | | (23.) | OH tank: | 2 nos. | | | (24.) | Approach roads and internal foot paths: | 235 m | | | (25.) | Net mending shed (4no) | 4 x 258.25 = 1033 Sq.M | | | (26.) | Boundary wall | 1017 m | | | (27.) | Rest shed (5no) | (5 x 214 = 1070 Sq.M) | | | (28.) | Net mending area / Drying area: | 3028 Sq.m | | | (29.) | Boat parking area | 145m X 85m | | | (30.) | Idle berthing quay | 1448 m | | | (31.) | Ice storage (1no) | (1 x 600 = 600 Sq.M) | | | (32.) | Toilet block (2no) | (2 x 69 = 138 Sq.M) | | | (33.) | Net mending area | 3028 sqm | | |
| 8.2. Product |
|---|
| S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
|---|
| (1.) | Fishing Harbour | 10000 | Tons per Annum | | Road | | |
|
| 9. | | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | | Details Not Applicable | |
|
| 9.1. | | Details of Consent to Operate | | (i)Whether Consent to operate obtained ? | NA | | (ii)Copies of all Consent to operate obtained since inception | NA | | (iii)Date of Issue | N/A | | (iv)Valid Upto | N/A | | (v)File No. | NA | | (vi)Application No. | NA | | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
| 10. | | Project Cost: | | (a)Total Cost of the Project at current price level (in crores) | 232.06 | | (b) Funds Allocated for Environment Management (Capital) (in crores) | 2.15 | | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0 | | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.2 | | (e) Funds Allocated for Environment Management Capital(%) | 0.93 | |
|
| 11. | | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
| 12. | | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
| 13. | | Raw Material / Fuel Requirement: | | (a)Proposed quantity of raw material/fuel | 0 | | (b)Existing quantity of raw material/fuel | N/A | | (c)Total quantity of raw material/fuel | 0 | |
|
|   13.1. Raw Material / Fuel Profile |
|---|
| S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
|---|
| (1.) | Water | 6034 | Cubic Meter per Day | 0 | Local Muncipal Coorpation | Road | | 1.30 | Fuel Supply Agreement | 0 | Copy of Linkage | |
|
| 14. | | Baseline Data : | | (a)Period of Base Line Data Collection | FROM 04 Oct 2020 To 25 Jun 2021 | | (b)Season | Winter | |
|
| 14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 5 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
|---|
| (1.) | SO2 | | Micro Gram per Meter Cube | 16 | 10 | 16 | 80 | | (2.) | Others | CO | Mili Gram per Meter Cube | 1.5 | 0.7 | 1.5 | 4 | | (3.) | PM2.5 | | Micro Gram per Meter Cube | 42 | 24 | 42 | 60 | | (4.) | NOx | | Micro Gram per Meter Cube | 24 | 13 | 23 | 80 | | (5.) | PM10 | | Micro Gram per Meter Cube | 92 | 55 | 91 | 100 | |
| 14.2. No. of Ground Water Monitoring Locations : 5 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
|---|
| (1.) | pH | | | NA | | 8.2 | 7.2 | 6.5 | 8.5 | | (2.) | Total Hardness | | | mg/l | | 1700 | 230 | 200 | 600 | | (3.) | TSS | | | NA | | 0 | 0 | 0 | 0 | | (4.) | Fluoride | | | mg/l | | 1.33 | 0.24 | 1 | 1.5 | | (5.) | Heavy Metals | | None | mg/l | | 0 | 0 | 0 | 0 | | (6.) | TDS | | | mg/l | | 4890 | 362 | 500 | 2000 | | (7.) | Chlorides | | | mg/l | | 1800 | 55 | 250 | 1000 | | (8.) | Others | Boron | | mg/l | | 1.1 | 0.1 | 0.5 | 1.0 | |
| 14.3. No. of Surface Water Monitoring Locations : 3 |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
|---|
| (1.) | pH | | NA | | 7.7 | 7.3 | A | | (2.) | BOD | | mg/l | | 4 | 2.4 | A | | (3.) | COD | | mg/l | | 32 | 12 | B | | (4.) | Others | Total coliform organisms | mg/l | | 500 | 22 | B | | (5.) | DO | | mg/l | | 6.2 | 5.1 | A | |
| 14.4. No. of Ambient Noise Monitoring Locations : 5 |
|---|
| S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
|---|
| (1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.2 | 47.2 | 55 | | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.6 | 38.7 | 45 | |
| 14.5. No. of Soil Sample Monitored Locations : 5 |
|---|
| S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
|---|
| (1.) | Electric Conductivity | Millisiemens per Centimetre | | 0.635 | 0.425 | | (2.) | N(Nitrogen) | Kilogram per hectare | | 204 | 105 | | (3.) | P(Phosphorus) | Kilogram per hectare | | 85 | 55 | | (4.) | pH | | | 8.2 | 7.2 | | (5.) | K(Potassium) | Kilogram per hectare | | 362 | 200 | |
|
| 14.6. | | Details of Ground Water Table: | | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 20 | | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | | (c)Whether Ground Water Intersection will be there ? | No | |
|
| 15. Details of Water Requirement (During Operation) |
|---|
| S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
|---|
| (1.) | Others | Gujarat Pani Puravatha Board | 1.15 | 2 | Copy of Permission Letter | Pipeline | | Others | Pipeline | J.S. Pani/Mang/9/202 | 05 Feb 2022 | 1.20 | |
|
| 15.1. | | (a)Whether Desalination is proposed | No | |
|
| 16. Waste Water Management(During Operation) |
|---|
| S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
|---|
| (1.) | Water Requirement for Cleaning | 410 | 470 | ETP | Reuse within the Plant & Recycling | | 410 | | | (2.) | Domestic Sewage | 84 | 100 | STP | Green Belt Renewal Plant | | 84 | | |
|
| 16.1. | | (a)Total Waste Water Generation | 494 | | (b)Total Discharged Water | 0 | | (c)Total Reused Water | 494 | |
|
| 17. Solid Waste Generation/Management |
|---|
| S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
|---|
| (1.) | Offal Collection | Municipal Solid Waste | | 1032 | Tons | 2 | Road | | Others | Offal will be sold out to Fish Meal Producers | |
|
|
| 18.1. Air Quality Impact Prediction |
|---|
| S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
|---|
| (1.) | Others(Specify) | NA | NA | 0 | 0 | 0 | 0 | 0 | | (2.) | PM2.5 | | Microgram per Meter Cube | 28 | 2.5 | 4.22 | 32.22 | 60 | | (3.) | NOx | | NA | 0 | 0 | 0 | 0 | 0 | | (4.) | SO2 | | NA | 0 | 0 | 0 | 0 | 0 | | (5.) | PM10 | | Microgram per Meter Cube | 91 | 5 | 6.16 | 97.16 | 100 | |
|
| 18.2. Stack Details |
|---|
| S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
|---|
| (1.) | D G Set | HSD | 30 | 5 | PM10,SO2 | | SoX, NOX , PM10, PM2.5 | |
|
| 19. | | Power Requirement: | | (a)Quantity (Kilo Volt Amps (kVA)) | 11 | | (b)Source | Gujarat Urja Vikas Nigam Limited (GUVNL). | | (c)Uploaded Copy of Agreement | Not Applicable | | (d)Standby Arrangement (Details of DG Sets) | 1 | | (e)Stack Height (in m) | 30 | |
|
| 20. | | Land Ownership Pattern: | | (a)Forest Land | 0 | | (b)Private Land | 0 | | (c)Government Land | 6.8 | | (d)Revenue Land | 0 | | (e)Other Land | 0 | | Total Land | 6.8 | |
|
| 21. | | Present Land Use Breakup of the Study Area in Ha: | | (a)Agriculture Area | 7236.30 | | (b)Waste/Barren Land | 3073.87 | | (c)Grazing/ Community Land | 3499.73 | | (d)Surface Water Bodies | 0 | | (e)Settlements | 1352.51 | | (f)Industrial | 0 | | (g)Forest | 505.93 | | (h)Mangroves | 0 | | (i)Marine Area | 15650.59 | | (j)Others : Muddy Land | 96.59 | | Total | 31415.52 | |
|
| 22. Land Requirement for Various Activities |
|---|
| S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
|---|
| (1.) | Others | harbour area | 6.8 | | |
|
|
| 23. | | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
| 23.1. Details of Ecological Sensitivity : |
|---|
| S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | WLS | Turtle nesting grounds | 3.7 | Veraval-Sutrapada beach- | | (2.) | NPA | None at project site None within 10 km radius | 0 | None at project site None within 10 km radius | | (3.) | Corridors | None at project site None within 10 km radius | 0 | None at project site None within 10 km radius | | (4.) | Wildlife Corridors | None at project site None within 10 km radius | 0 | None at project site None within 10 km radius | | (5.) | ESAs | Turtle nesting grounds | 3.7 | Veraval-Sutrapada beach- | | (6.) | ESZs | Hirakot RF | 1.6 | NW | | (7.) | Critically Polluted Area | None at project site None within 10 km radius | 0 | None at project site None within 10 km radius | |
| 23.2. Details of Environmental Sensitivity : |
|---|
| S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
|---|
| (1.) | Others | Historical/ Tourist place | Shree Somnath Jyotirling Temple | 9.6 | None at project site | | (2.) | Archaeological Sites | | None at project site None within 10 km radius | 0 | None at project site None within 10 km radius | | (3.) | Forest | | Hirakot RF | 1.6 | NW direction | | (4.) | Defence Installations | | None at project site | 0 | None at project site None within 10 km radius | |
|
| 23.3. | | (a)Whether Noc / Permission from the competent authority is required? | No | | (b)Whether NBWL recommendation is required? | No | |
|
| 24. | | Forest Land: | | Whether any Forest Land involved? | No | |
|
|
| 26. | | Land Acquisition Status: | | (a)Acquired Land(Ha) | 6.8 | | (b)Land yet to be acquired(Ha) | 0 | | (c)Status of Land acquisition if not acquired | 6.8 | |
|
| 27. | | Rehabilitation and Resettlement (R&R): | | (a)No. of Villages | 0 | | (b)No. of Households | 0 | | (c)No. of PDFs (Project Displaced Families) | 0 | | (d)No. of PAFs (Project Affected Families) | 0 | | (e)Funds Allocated for R&R(in Rs) | 0 | | (f)Status of R&R | Completed | |
|
| 28. | | Details of Presence of Schedule-I Species: | | (a)Whether there is Presence of Schedule-I Species ? | Yes | | (i)Details of Schedule-I Species | Green Sea Turtle, Whale shark | | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | | (i)Uploaded copy of conservation plan | Copy of conservation plan | | (ii)Fund Provision made | 16 | | (iii)Period of Implementation | 5 | | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
| 29. | | Details of Presence of Water Bodies in Core Area: | | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | | (i)Details of Water Bodies in Core Area | Arabian sea | | (b)Whether there is Diversion Required ? | No | | (c)Whether permission has been obtained from competent authority ? | Yes | | (i)Uploaded copy of permission | Copy of permission | | (ii)Letter No. | 0 | | (iii)Date of issue | 09 Feb 2022 | | (iv)Recommendation | The project has been submitted to GCZMA for CRZ re | |
|
| 30. | | Details of Presence of Water Bodies in Buffer Area: | | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | | (i)Details of Water Bodies in Buffer Area | Saraswati River | | (ii)Direction of Water Bodies in Buffer Area | North | | (iii)Distance of Water Bodies in Buffer Area | 6 | |
|
| 31. | | Manpower Requirement: | | (a)Permanent Employment-During Construction | 5 | | (b)Permanent Employment-During Operation | 0 | | (c)Temporary Employment- During Construction | 70 | | (d)Temporary Employment- During Operation | 0 | | (e)No. of working days | 6 | | (f)Total Manpower | 75 | |
|
| 32. | | Green Belt in Ha: | | (a)Total Area of Green Belt (in hectare) | 2.244 | | (b)Percentage of Total Project Area | 33.00 | | (c)No. of Plants to be Planted | 2400 | | (d)Funds Allocated for Plantation | 100000 | | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
| 33. Project Benefits |
|---|
| S. No. | Type of Project Benefits | Details of Project Benefits |
|---|
| (1.) | Social | Any new formulation or modernization of existing project assures employment opportunities for the local citizens. As Sutrapada project is freshly designed, during construction phase temporary employme | | (2.) | Others | Many of the fish importing nations as well as in house fish importers insist on fish and fishery product coming from the clean and hygiene fish landing places as a prerequisite to meet the quality sta | | (3.) | Social | Understanding the primary need of the people, the project definitely will have positive impacts on the socio-economic conditions of the region. Livelihood of the citizens is likely to improve due to t | |
|
| 34. CRZ Specific Details : Not Applicable |
| 35. Sector Specific Details For INFRA-1 |
|
| 1. | | Details of Building Construction: | | (a)Maximum Height of the Building (Meters) | 15 | | (b)Total No. of Flats to be Build | 0 | | (c)No. of Buildings | 1 | | (d)Total plot area (sqm) | 68000 | | (e)Total built up area (sqm) | 480 | |
|
| 2. | | Foreshore Facilities and/or Marine Disposal: | | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | | (b)Upload Shoreline Study | Copy of Shoreline stuudy | | (c)Type of Cargo | Fishing harbour | | (d)Quantity of Cargo | 10000 | | (e)Control Measures of Cargo | None | | (f)Dust Control Measures | No dust will be generated | | (g)Quantum | 0 | | (h)Quantity of Dredging (Cubic meter per day) | 2.5 | | (i)Type of Dredging | Capital | | (j)Disposal of Dredge Material | Will be used in reclamation | | (k)Details of Outfall Diffusers | None | | (l)No. of Dilution Expected | 0 | | (m)Distance at which the Outlet will Reach Ambient Parameters | 0 | | (n)Details of Monitoring at Outfall | 0 | | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
| 3. | | Rain Water Harvesting: | | (a)No. of Storage | 0 | | Capacity | 0 | | (b)No. of Recharge Pits | 0 | | Capacity | 0 | |
|
| 4. | | Parking: | | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 4996 sq.m | |
|
| 5. | | Energy Saving Measures: | | (a)Source/Mode | LED | | (b)Percentage | 100 | | (c)Quantity | 10 | |
|
|
| 7. Type of Industries to be established with Industrial Estate as per their category A/B |
|---|
| S. No. | Type of Industry | No. of Units | Category A/B |
|---|
| NIL | |
| 8. | | Length of the alignment | N/A | |
|
| 9. | | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | | Details Not Applicable | |
|
|
| 36. | | Details of Court Cases: | | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
| 37. | | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
| 38. | | Details of EIA Consultant: | | (a)Have you hired Consultant for preparing document? | Yes | | (i)Accreditation No. | NABET/EIA/2023/RA0194 | | (ii)Name of the EIA Consultant | ULTRA TECH | | (iii)Address | Unit no. 224, 225, 206, Jai commercial Complex, 463 Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane (W) – 400601. | | (iv)Mobile No. | 7276857781 | | (v)Landline No. | 29525517 | | (vi)Email Id | deepika@ultratech.in | | (vii)Category of Accreditation | A | | (viii)Sector of Accreditation | INFRA-1 | | (ix)Validity of Accreditation | 09 Mar 2023 | | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
| Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | |
| Addtional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | |
| | Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| | | Name of Applicant | Mahammad Shahid | | Designation | Commissioner of Fishries | | Name of Company (Applicant Name should not be given here) | FISHERIES DEPARTMENT | | Address | 3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar |
|