Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of fishing harbour at Sutrapada, Gir Somnath District by Fisheries Department Government of Gujarat
(b)Name of the Company / Organisation FISHERIES DEPARTMENT
(c)Registered Address 3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar,,Bangalore Urban,Karnataka-382010
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant Mahammad Shahid
(b)Designation (Owner/ Partner/ CEO) Commissioner of Fishries
(c)Address 3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar,,Gandhinagar,Gandhinagar,Gujarat-382010
(d)Pin code 382010
(e)E-mail comfis.guj@gmail.com
(f)Telephone No. 79-23253742
(g)Fax No. 23253730
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(e) Ports, Harbours
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/NCP/74850/2016
(e)Master Proposal Number(Single Window) SW/266436/2022
(f)EAC concerned (for category A Projects only) INFRA-1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. At Sutrapada, Gir Somnath, Gujarat
(b)Pincode 362275
(c)Bounded Latitudes (North)
From
Degree 20
Minutes 50
Second 25.81
From
Degree 20
Minutes 50
Second 9.24
(d)Bounded Longitudes (East)
From
Degree 70
Minutes 28
Second 27.41
From
Degree 70
Minutes 28
Second 50.07
(e)Survey of India Topo Sheet No. 41L/9, 41L/10, 41L/5, 41L/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGir SomnathSutrapadaSutrapada
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SIA/GJ/107411/2016
(c)Date of Apply of TOR 21 Nov 2016
(d)Date of Issue of TOR / Standard ToR 17 Jun 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Aug 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :1.20
Shri Sutrapada Samasta Kharava Samaj Hall, Behind Taluka Panchayat Seva Sadan and Shree Shivsagar Primary School, Po. - Sutrapada, Ta. Sutrapada, Dist. Gir Somnath
State :Gujarat
District :Gir Somnath
Tehsil :Sutrapada
Village :Sutrapada
88Sutrapada village consists of 100% fisherman population. Approx 6000-7000 population is engaged in fisheries related activities. This project will generate employment in Sutrapada and surroundingOthersAdditional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Beach landing/RCC slope hard200 m
(2.)Dormitory (1no)(1 x 1274 = 1274 Sq.M)
(3.)Landing Quay185 m
(4.)Western breakwater730m
(5.)Admin building (1no)1 x 480 = 480 Sq.M
(6.)Outfitting Quay87 m
(7.)Eastern Breakwater1065m
(8.)Pre-processing hall cum Auction & fish drying yard3550 Sq.m.(2 Nos)
(9.)Radio station (1no)1 x 148 = 148 Sq.M
(10.)Effluent Treatment plant:400 Sq. m.
(11.)Fuel outlets:182 Sq. m.
(12.)Canteen building (1no)(1 x 316 = 316 Sq.M)
(13.)Security room (1no)(1 x 32 = 32 Sq.M)
(14.)Repair quay37 m
(15.)Gear shed (5no)(5 x 243 = 1216 Sq.M)
(16.)Toilets138 Sq.m
(17.)Restaurant:316 Sq. m
(18.)Workshop (1no)(1 x 228 = 228 Sq.M)
(19.)Community hall (1no)1 x 600 = 600 Sq.M
(20.)Vehicle parking area7996 sqm
(21.)Fuel bunkering area182 sqm
(22.)Net mending shed:1033 Sq.m
(23.)OH tank:2 nos.
(24.)Approach roads and internal foot paths:235 m
(25.)Net mending shed (4no)4 x 258.25 = 1033 Sq.M
(26.)Boundary wall1017 m
(27.)Rest shed (5no)(5 x 214 = 1070 Sq.M)
(28.)Net mending area / Drying area:3028 Sq.m
(29.)Boat parking area145m X 85m
(30.)Idle berthing quay1448 m
(31.)Ice storage (1no)(1 x 600 = 600 Sq.M)
(32.)Toilet block (2no)(2 x 69 = 138 Sq.M)
(33.)Net mending area3028 sqm
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Fishing Harbour10000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 232.06
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.15
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.2
(e) Funds Allocated for Environment Management Capital(%) 0.93
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Water6034Cubic Meter per Day0Local Muncipal CoorpationRoad1.30 Fuel Supply Agreement0Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Oct 2020 To 25 Jun 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube16101680
(2.)OthersCOMili Gram per Meter Cube1.50.71.54
(3.)PM2.5Micro Gram per Meter Cube42244260
(4.)NOxMicro Gram per Meter Cube24132380
(5.)PM10Micro Gram per Meter Cube925591100
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.27.26.58.5
(2.)Total Hardnessmg/l1700230200600
(3.)TSSNA0000
(4.)Fluoridemg/l1.330.2411.5
(5.)Heavy MetalsNonemg/l0000
(6.)TDSmg/l48903625002000
(7.)Chloridesmg/l1800552501000
(8.)OthersBoronmg/l1.10.10.51.0
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.77.3A
(2.)BODmg/l42.4A
(3.)CODmg/l3212B
(4.)OthersTotal coliform organismsmg/l50022B
(5.)DOmg/l6.25.1A
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.247.255
(2.)Leq(Night)A-weighted decibels(dB(A))44.638.745
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre0.6350.425
(2.)N(Nitrogen)Kilogram per hectare204105
(3.)P(Phosphorus)Kilogram per hectare8555
(4.)pH8.27.2
(5.)K(Potassium)Kilogram per hectare362200
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGujarat Pani Puravatha Board1.152Copy of Permission LetterPipelineOthersPipelineJ.S. Pani/Mang/9/20205 Feb 20221.20
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Water Requirement for Cleaning410470ETPReuse within the Plant & Recycling410
(2.)Domestic Sewage84100STPGreen Belt Renewal Plant84
16.1.
(a)Total Waste Water Generation 494
(b)Total Discharged Water 0
(c)Total Reused Water 494
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Offal CollectionMunicipal Solid Waste1032Tons2RoadOthersOffal will be sold out to Fish Meal Producers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)NANA00000
(2.)PM2.5Microgram per Meter Cube282.54.2232.2260
(3.)NOxNA00000
(4.)SO2NA00000
(5.)PM10Microgram per Meter Cube9156.1697.16100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D G SetHSD305PM10,SO2SoX, NOX , PM10, PM2.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11
(b)Source Gujarat Urja Vikas Nigam Limited (GUVNL).
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 6.8
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 7236.30
(b)Waste/Barren Land 3073.87
(c)Grazing/ Community Land 3499.73
(d)Surface Water Bodies 0
(e)Settlements 1352.51
(f)Industrial 0
(g)Forest 505.93
(h)Mangroves 0
(i)Marine Area 15650.59
(j)Others : Muddy Land 96.59
    Total 31415.52
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Othersharbour area6.8
Total 6.8
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSTurtle nesting grounds3.7Veraval-Sutrapada beach-
(2.)NPANone at project site None within 10 km radius0None at project site None within 10 km radius
(3.)CorridorsNone at project site None within 10 km radius0None at project site None within 10 km radius
(4.)Wildlife CorridorsNone at project site None within 10 km radius0None at project site None within 10 km radius
(5.)ESAsTurtle nesting grounds3.7Veraval-Sutrapada beach-
(6.)ESZsHirakot RF1.6NW
(7.)Critically Polluted AreaNone at project site None within 10 km radius0None at project site None within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersHistorical/ Tourist placeShree Somnath Jyotirling Temple9.6None at project site
(2.)Archaeological SitesNone at project site None within 10 km radius0None at project site None within 10 km radius
(3.)ForestHirakot RF1.6NW direction
(4.)Defence InstallationsNone at project site0None at project site None within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 6.8
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Green Sea Turtle, Whale shark
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 16
(iii)Period of Implementation 5
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Arabian sea
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. 0
(iii)Date of issue 09 Feb 2022
(iv)Recommendation The project has been submitted to GCZMA for CRZ re
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Saraswati River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 70
(d)Temporary Employment- During Operation 0
(e)No. of working days 6
(f)Total Manpower 75
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.244
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 2400
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialAny new formulation or modernization of existing project assures employment opportunities for the local citizens. As Sutrapada project is freshly designed, during construction phase temporary employme
(2.)OthersMany of the fish importing nations as well as in house fish importers insist on fish and fishery product coming from the clean and hygiene fish landing places as a prerequisite to meet the quality sta
(3.)SocialUnderstanding the primary need of the people, the project definitely will have positive impacts on the socio-economic conditions of the region. Livelihood of the citizens is likely to improve due to t
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 15
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 68000
(e)Total built up area (sqm) 480
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Fishing harbour
(d)Quantity of Cargo 10000
(e)Control Measures of Cargo None
(f)Dust Control Measures No dust will be generated
(g)Quantum 0
(h)Quantity of Dredging (Cubic meter per day) 2.5
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Will be used in reclamation
(k)Details of Outfall Diffusers None
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall 0
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4996 sq.m
5.
Energy Saving Measures:
(a)Source/Mode LED
(b)Percentage 100
(c)Quantity 10
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The proposed developments involve reclamation, dri
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA0194
(ii)Name of the EIA Consultant ULTRA TECH
(iii)Address Unit no. 224, 225, 206, Jai commercial Complex, 463 Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane (W) – 400601.
(iv)Mobile No. 7276857781
(v)Landline No. 29525517
(vi)Email Id deepika@ultratech.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 09 Mar 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter NA
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahammad Shahid
DesignationCommissioner of Fishries
Name of Company (Applicant Name should not be given here)FISHERIES DEPARTMENT
Address3rd Floor, Block No. 10, Dr. Jivraj Mehta Bhavan, Gandhinagar
Print