Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Bamhangaon Stone Quarry
(b)Name of the Company / Organisation BAMHANGAON STONE QUARRY OF SHRI NAVAL SINGH BAGHEL
(c)Registered Address S/o Shri Lalta Prasad Baghel R/o Village Hiwala Post Mandla Tehsil Khirkiya Dist Harda,,Harda,Madhya Pradesh-461441
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Naval Singh
(b)Designation (Owner/ Partner/ CEO) Lessee
(c)Address S/o Shri Lalta Prasad Baghel R/o Village Hiwala Post Mandla Tehsil Khirkiya Dist Harda,Harda,Madhya Pradesh-461441
(d)Pin code 461441
(e)E-mail nvs05454@gmail.com
(f)Telephone No. 120-4213296
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/MP/MIN/64234/2020
(e)Master Proposal Number(Single Window) SW/266158/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3/1/KH
(b)Pincode 461441
(c)Bounded Latitudes (North)
From
Degree 22
Minutes 15
Second 32.51
From
Degree 22
Minutes 15
Second 36.81
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 55
Second 29.77
From
Degree 76
Minutes 55
Second 35.72
(e)Survey of India Topo Sheet No. 55B/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 275
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 50
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshHardaKhirkiyaBamhangaon
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 7947/2020
(b)Date of Apply of TOR 04 Dec 2020
(c)Date of Issue of TOR / Standard ToR 01 Jan 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Mar 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Apr 2021
Distance of Public Hearing Venue from the Proposed Project :1.0
Gram Panchayat premises Bahmangaon Tehsil Khirkiya. District Harda (MP)
State :Madhya Pradesh
District :Harda
Tehsil :Khirkiya
Village :Bahmangaon
50The details are given in chapter 7 in Table 7.1 of Final EIA ReportOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Loader01On rent Basis
(2.)Dumper04On rent Basis
(3.)Excavator01On rent Basis
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)1.609938Otherscum/yearRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.3
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.13435
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0544
(e) Funds Allocated for Environment Management Capital(%) 44.78
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)fuel for running machineries20000OthersLitre per annumNARoad0.40 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube564050100
(2.)PM2.5Micro Gram per Meter Cube35253260
(3.)NOxMicro Gram per Meter Cube24182080
(4.)SO2Micro Gram per Meter Cube1371080
    14.2.     No. of Ground Water Monitoring Locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l667429250500
(2.)Total Hardnessmg/l481264250500
(3.)Chloridesmg/l996750150
(4.)Heavy MetalsIronmg/l0.000.000.51.0
(5.)Fluoridemg/l0.800.581.52.0
(6.)pHNA7.657.256.58.5
(7.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 01
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l9.06.0A
(2.)DOmg/l6.15.9A
(3.)pHNA7.657.25A
(4.)CODmg/l3026A
    14.4.     No. of Ambient Noise Monitoring Locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.640.775
(2.)Leq(Night)A-weighted decibels(dB(A))48.637.170
    14.5.     No. of Soil Sample Monitored Locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.167.26
(2.)K(Potassium)Milliequivalents per 100 Gram8.87.6
(3.)N(Nitrogen)Milliequivalents per 100 Gram17.414.6
(4.)P(Phosphorus)Milliequivalents per 100 Gram0.880.74
(5.)Electric ConductivityMillisiemens per Centimetre465348
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 32
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 28 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersPrivate Tanker3.481.0Copy of Permission LettermodeOthersBy RoadOthersPrivate Tanker024 Feb 20213.48
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water0.8520Septic tankOtherssoak pit00.852
16.1.
(a)Total Waste Water Generation 0.852
(b)Total Discharged Water 0.852
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste2200Tons0RoadOthersSeptic Tank
(2.)OB/SOILOthersOB Waste4860Tons0RoadOthersApproach and Haul Road Maintenance
(3.)Waste RejectOthersWaste Reject2727Tons0RoadOthersApproach and Haul Road Maintainance
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube35000.6535.6560
(2.)SO2Microgram per Meter Cube0000000000
(3.)NOxMicrogram per Meter Cube0000000000
(4.)PM10Microgram per Meter Cube56001.2257.22100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NIL000000PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3
(b)Source Madhya Pradesh Electricity Generation Department
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.6
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.6
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 10500
(b)Waste/Barren Land 6250
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 4550
(e)Settlements 3700
(f)Industrial 0
(g)Forest 7535
(h)Mangroves 0
(i)Marine Area 0
(j)Others : pvt land 1.6
    Total 32536.6
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area1.21pit area
(2.)Green belt0.37plantation purpose
(3.)OB Dump Area0.01dump area
(4.)Othersoffice and rest shelter0.01office and rest shelter
Total 1.6
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0As per DFO Letter
(2.)ESZsNone0As per DFO Letter
(3.)Critically Polluted AreaNone0As per CPCB Guideline (MP) (Matter of O.A. No. 1038/2018 (CEPI Matter))
(4.)NPANone0None Within 10km Radius
(5.)ESAsNone0None Within 10km Radius
(6.)CorridorsNone0None Within 10km Radius
(7.)Wildlife CorridorsNone0None Within 10km Radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None Within 10km Radius
(2.)ForestNone0None Within 10km Radius
(3.)Defence InstallationsNone0None Within 10km Radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.6
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Machak river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.93
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 02
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 20
(e)No. of working days 250
(f)Total Manpower 22
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.37
(b)Percentage of Total Project Area 23.13
(c)No. of Plants to be Planted 2000
(d)Funds Allocated for Plantation 437500
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialHelps in raining the economy of the local areas
(2.)SocialProvide employment, Proper Plantation, Maintenance to kaccha road, Development of village
(3.)EnvironmentalEnhance vegetation and helps in protection of environment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)StoneMinor
2.
Mine Capacity in ROM (Run of Mine) 113141
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 15223/mining plan cell-6/N.K/09/2021, Bhopal
(b)Date of Approval 02 Nov 2021
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department director geology and mining bhopal
(e)Approved Mining Lease Area 1.60
(f)Approved Capacity 9938
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.5376
(b)Mineable Reserves (Million Ton) 0.31679
(c)Extractable Reserves(Million Ton) 0.13913
(d)Percent(%) of Extraction 43.91
(e)Grade of Coal /Ore /Mineral 0
(f)Stripping Ratio 1 : 0.02
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 11
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 1.60
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 25 Jun 2019
(iii)Validity of LOI 10
(iv)Reference No. of LOI 6729/khanij/07-UP/2018-19, Harda
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After the grant of EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Not applicable
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 01
(ii)Total Area (in Hectare) 0.01
(iii)Height (in meter) 3
(iv)Quantity (in Million Cubic meter) 0.0003
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.0017
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.0017
11.
Details of Final Mine Void:
(a)Area (in Hectare) 1.21
(b)Depth (in meter) 12
(c)Volume (in Million Cubic meter) 0.1452
12.
Details of Quarry:
(a)Final Void of 1.21 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1.60
13.
Details of Transportation:
(a)In Pit/Underground to Surface Through dumper
(b)Surface to Siding/Loading Through excavator
(c)Transportation / Conveyor Details By Road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES045504550
(2.)WASTE LAND062506250
(3.)SETTLEMENTS037003700
(4.)AGRICULTURE LAND01050010500
(5.)GRAZING LAND000
(6.)FOREST LAND075357535
TOTAL03253532535
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0.01000.01
(2.)BUILT UP AREA (COLONY/OFFICE)0.01000.01
(3.)TOP SOIL STORAGE0000
(4.)EXTERNAL OB DUMPS0000
(5.)ROADS0000
(6.)VIRGIN AREA0000
(7.)EXCAVATION/QUARRY01.2101.21
(8.)GREEN BELT0.37000.37
TOTAL0.391.21001.6
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.01
(c)Quarry(in hectare) 1.60
(d)Safety Zone(in hectare) 0.37
(e)Final Void of 1.21 (hectare) at a Depth of 12 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1200
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.37
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA 0141
(ii)Name of the EIA Consultant ASERIES ENVIROTEK INDIA PVT. LTD
(iii)Address Khasra No. 973 (Part), Sainik Vihar Phase-II, Near CRPF Camp Gate No. 2, Bijnaur, Sarojini Nagar, Lucknow (UP)-226008
(iv)Mobile No. 9990366186
(v)Landline No. 0000000000
(vi)Email Id aseriess.envirotek@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 11 Jun 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)08/04/2022Pls. upload complete Public hearing with covering letter (News paper cutting & Photographs) MO letter assuring that the proposed mine is included in New DSR
(2.)12/04/2022The correction have been made as per the instruction received
(3.)13/04/2022Pls. upload Mine Plan
(4.)14/04/2022The correction have been made as per the instruction received
(5.)25/04/2022This Case is rejected in 682 SEIAA meeting dated 26-08-21.
(6.)27/06/2022The correction have been made as per the instruction received
(7.)29/06/2022Kindly With draw the Application & apply a fresh
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNaval Singh
DesignationLessee
Name of Company (Applicant Name should not be given here)BAMHANGAON STONE QUARRY OF SHRI NAVAL SINGH BAGHEL
AddressS/o Shri Lalta Prasad Baghel R/o Village Hiwala Post Mandla Tehsil Khirkiya Dist Harda
Print