Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Application for Environmental Clearance for the Proposed Plasticizer Manufacturing Unit at Plot- T-129, Indl. Area, MIDC Tarapur (Boisar), Taluka & District: Palghar by Nayakem Organics Pvt. Ltd.
(b)Name of the Company / Organisation NAYAKEM ORGANICS PVT. LTD. (UNIT-II)
(c)Registered Address 1104-B, Naman Midtown, Senapati Bapat Marg, Elphinstone Road, Mumbai- 400013,,Mumbai City,Maharashtra-400013
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Nand Bhojraj Thadani
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address 1104-B, Naman Midtown, Senapati Bapat Marg, Elphinstone Road, Mumbai- 400013,Palghar,Maharashtra-401506
(d)Pin code 401506
(e)E-mail nayakem.nbt@gmail.com
(f)Telephone No. 22-24314878
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/IND3/65732/2021
(e)Master Proposal Number(Single Window) SW/264093/2022
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. T-129, MIDC Indl. Area, Boisar-Tarapur, D
(b)Pincode 411038
(c)Bounded Latitudes (North)
From
Degree 19
Minutes 47
Second 40
From
Degree 19
Minutes 47
Second 94
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 43
Second 29
From
Degree 72
Minutes 43
Second 63
(e)Survey of India Topo Sheet No. 47A/9, 47A/10, 47A/13, 47A/14D
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 50
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.63
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraPalgharPalgharBoisar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/MH/IND3/65732/2021
(b)Date of Apply of TOR 16 Jul 2021
(c)Date of Issue of TOR / Standard ToR 19 Jul 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project site is situated in a notified industr
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total Plot Area3,615 m2-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Stearates50OthersMt/MRoad
(2.)Benzoates400OthersMt/MRoad
(3.)Adipates50OthersMt/MRoad
(4.)Maleates100OthersMt/MRoad
(5.)Sebacates25OthersMt/MRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. -
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 7.58
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.255
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.30
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.07
(e) Funds Allocated for Environment Management Capital(%) 3.36
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 19650
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 19650
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Maleic anhydride1200Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(2.)Stearic Acid900Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(3.)Benzoic Acid9600Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(4.)Adipic Acid750Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(5.)2-EHA (Octanol)900Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(6.)Butanol900Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(7.)Di-Ethylene/ Di-Propylene Glycol4800Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
(8.)Sebacic Acid600Tons per AnnumLocal MarketRoad0 Others-Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube26.501426.3280
(2.)PM10Micro Gram per Meter Cube68.4043.2068.2680
(3.)SO2Micro Gram per Meter Cube146.8011.55100
(4.)OthersCOMicro Gram per Meter Cube0.580.410.584
(5.)PM2.5Micro Gram per Meter Cube34.6020.4034.5560
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l432300500500
(2.)TSSmg/l5500
(3.)Chloridesmg/l9820250250
(4.)Fluoridemg/l0.10.111
(5.)Heavy MetalsChromiummg/l0.050.050.050.05
(6.)pHNA7.896.56.57.5
(7.)Total Hardnessmg/l15980200600
(8.)OthersTotal ColiformOthersCFU/100 ml005050
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.826.5E
(2.)DOmg/l00E
(3.)BODmg/l15875E
(4.)CODmg/l555241E
(5.)OthersChloridemg/l15285E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))55.331.570
(2.)Leq(Night)A-weighted decibels(dB(A))62.835.475
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Litre00
(2.)Electric ConductivityMillisiemens per Centimetre00
(3.)N(Nitrogen)Milligram per Litre2515
(4.)K(Potassium)Milligram per Litre00
(5.)pH8.596.82
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 4
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC260 Not Appliacble PipelineOthers--27 Mar 202226
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process11.5Effluent Treatment PlantReuse within the Plant & Recycling1
16.1.
(a)Total Waste Water Generation 1
(b)Total Discharged Water 0
(c)Total Reused Water 1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Office WasteMunicipal Solid Waste0.06Tons0RoadOthersHanded over to local bodies
(2.)Process Residue SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)48Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Bio Sludge from ETPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.048Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10NA00000
(2.)PM2.5NA00000
(3.)SO2NA00000
(4.)Others(Specify)-NA00000
(5.)NOxNA00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Thermic Fluid HeaterNatural Gas250.25SO2-
(2.)D.G SetLDO150.15PM10,SO2,PM2.5-
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1x100 kVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.3615
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.3615
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : - 0.3615
    Total 0.3615
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.3615-
Total 0.3615
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAs-0-
(2.)Corridors-0-
(3.)Wildlife Corridors-0-
(4.)ESZs-0-
(5.)Critically Polluted Area-0-
(6.)WLS-0-
(7.)NPA-0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Others--0-
(2.)Forest-0-
(3.)Archaeological Sites-0-
(4.)Defence Installations-0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.3615
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Banganga River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 5
(e)No. of working days 365
(f)Total Manpower 175
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.1446
(b)Percentage of Total Project Area 40.00
(c)No. of Plants to be Planted 82
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe project will generate direct and indirect jobs for locals.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA0194
(ii)Name of the EIA Consultant ULTRA-TECH, Environmental Consultancy and Lab
(iii)Address Unit Nos. 224, 225 & 226, Jai Commercial Complex, Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane- 400601, Maharashtra
(iv)Mobile No. 8600017756
(v)Landline No. 0222534277
(vi)Email Id env.yewale@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 09 Mar 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)18/08/2022Please submit compliance as per minutes.
(2.)24/09/2022Reply to the queries raised in 226th SEAC-I meeting held on 07.08.2022.ADS Letter
(3.)22/12/2022please submit compliance as per minutes
(4.)09/03/2023Compliance to the minutes of 232nd SEAC-I Meeting are attached herewith.ADS Letter
(5.)30/06/2023pl submit compliance as per minutes.
(6.)06/07/2023Reply to the query raised in 249th SEAC-I meeting held on 11.05.2023ADS Letter
(7.)30/11/2023Submit compliance as per SEIAA 267 Day 1 Part C Sr. No.39 mom
(8.)15/01/2024Reply to 267th SEIAA Minutes of Meeting.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNand Bhojraj Thadani
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)NAYAKEM ORGANICS PVT. LTD. (UNIT-II)
Address1104-B, Naman Midtown, Senapati Bapat Marg, Elphinstone Road, Mumbai- 400013