1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Tejal Industries | (b)Name of the Company / Organisation | TEJAL INDUSTRIES | (c)Registered Address | Plot No. 730,731 GIDC Estate, Ankleshwar, Gujarat,,Bharuch,Gujarat-393002 | (d)Legal Status of the Company | Others | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Ramnikbhai Tratiya | (b)Designation (Owner/ Partner/ CEO) | Proprietor | (c)Address | Plot No. 730, 731 GIDC Estate, Ankleshwar, Gujarat,,Anklesvar,Bharuch,Gujarat-393002 | (d)Pin code | 393002 | (e)E-mail | keyur2710@gmail.com | (f)Telephone No. | 264-6220110 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/IND3/62266/2021 | (e)Master Proposal Number(Single Window) | SW/261740/2022 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. 730, 731, GIDC Estate, Ankleshwar, Dist. | (b)Pincode | 393002 | (c)Bounded Latitudes (North) | | From | | Degree | 21 | Minutes | 36 | Second | 47.96 | From | | Degree | 21 | Minutes | 36 | Second | 49.18 | (d)Bounded Longitudes (East) | | From | | Degree | 73 | Minutes | 1 | Second | 16.65 | From | | Degree | 73 | Minutes | 1 | Second | 17.95 | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 13 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 1.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Anklesvar | Ankleshvar | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/GJ/76304/2021 | (b)Date of Apply of TOR | 26 Mar 2021 | (c)Date of Issue of TOR / Standard ToR | 03 Apr 2021 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is located within Industrial Estate | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Open Vessel Reactor | 6 KL | 1 No. | (2.) | Open Vessel Reactor | 2 KL | 1 No. | (3.) | Pulverizer | 15 HP | 1 No. | (4.) | Filter Press | 36 Plates | 1 No. | (5.) | Filter Press | 24 Plates | 1 No. | (6.) | Open Vessel Reactor | 1 KL | 1 No. | (7.) | Open Vessel Reactor | 17 KL | 1 No. | (8.) | Ball Mill | 2000 Lit | 1 No. | (9.) | Open Vessel Reactor | 5 KL | 1 No. | (10.) | Dryer | 200 Tray | 1 No. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pigment Lake Red C | 96 | Tons per Annum | | Road | | (2.) | Pigment Maroon toner Or | 96 | Tons per Annum | | Road | | (3.) | Pigment Red RC Or | 96 | Tons per Annum | | Road | | (4.) | Diluted products of product No. 1 to 4 listed above (30%) | 864 | Tons per Annum | | Road | | (5.) | 4 B Acid | 240 | Tons per Annum | | Road | | (6.) | Pigment Rubine Tonner | 96 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 09 Jan 2019 | (iv)Valid Upto | 15 Dec 2023 | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 0.2 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.185 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.002 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.2085 | (e) Funds Allocated for Environment Management Capital(%) | 92.50 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2300.28 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2300.28 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | B Naphthol | 27.72 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (2.) | Calcium chloride | 117.48 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (3.) | Caustic soda (48%) | 203.88 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (4.) | CLT Acid (C-Acid) | 42.72 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (5.) | Gum Rosin | 70.32 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (6.) | Hydrochloric acid | 221.76 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (7.) | Barium Chloride | 38.4 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (8.) | Fuel | 394.200 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (9.) | Bon Acid | 111 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (10.) | Sodium nitrite | 54.12 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (11.) | Sulfuric Acid | 173.76 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (12.) | 2B Acid | 42.72 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (13.) | Precipitate Silica | 576 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (14.) | Tobias Acid | 52.44 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | (15.) | P-Toludine | 173.76 | Tons per Annum | | Local suppliers | Road | | 25 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2020 To 01 Mar 2021 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 46 | 10 | 45 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 89 | 48 | 88 | 100 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 45 | 25 | 44 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 52 | 12 | 48 | 80 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1503 | 594 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 598 | 356 | 300 | 600 | (3.) | TSS | | | mg/l | | 10 | 5 | 0 | 0 | (4.) | Fluoride | | | mg/l | | 0.5 | 0.1 | 1 | 1.5 | (5.) | Chlorides | | | mg/l | | 890 | 80 | 250 | 1000 | (6.) | Others | Alkalanity | | mg/l | | 584 | 160 | 200 | 600 | (7.) | pH | | | NA | | 7.9 | 7.1 | 6.5 | 8.5 | |
14.3. No. of Surface Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | TDS | mg/l | | 1104 | 480 | B | (2.) | DO | | mg/l | | 4.5 | 2.5 | B | (3.) | pH | | NA | | 8.3 | 6.8 | B | (4.) | BOD | | mg/l | | 10 | 10 | B | (5.) | COD | | mg/l | | 10 | 10 | B | |
14.4. No. of Ambient Noise Monitoring Locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58 | 42 | - | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55 | 35 | - | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 66.2 | 6.1 | (2.) | K(Potassium) | Milligram per Kilogram | | 136 | 120 | (3.) | pH | | | 8.12 | 7.23 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 53.8 | 12.1 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.365 | 0.223 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 14 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 8 To 9 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC | 9.6 | 0.1 | Copy of Permission Letter | Pipeline | | Others | Pipe Line | NTA/ANK/DEE(WS)/1738 | 23 Dec 2021 | 15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic + Industrial | 17.1 | 20 | ETP + R.O | Others | NCT | 14.4 | 2.7 | |
|
16.1. | (a)Total Waste Water Generation | 17.1 | (b)Total Discharged Water | 2.7 | (c)Total Reused Water | 14.4 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Contaminated containers/Barrels/Liners/ | Industrial Waste | | 12.5 | Tons | 3.3 | Road | | Authorized Recyclers | | (2.) | Used Oil | Industrial Waste | | 0.02 | Kilolitre | 5 | Road | | Authorized Recyclers | | (3.) | ETP Sludge | Industrial Waste | | 60 | Tons | 3.3 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 36 | 1.48 | 0.476 | 36.476 | 80 | (2.) | NOx | | Microgram per Meter Cube | 49 | 1.48 | 0.28 | 49.28 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 44 | 1.48 | 0.18 | 44.18 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 89 | 1.48 | 0.27 | 89.27 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler 1 & 2 | Agro Waste / Briquettes | 21 | 0.3 | PM10,SO2,NOx | | 150,100,50 | (2.) | Hot Air Generator | Agro Waste / Briquettes | 11 | 0.2 | PM10,SO2,NOx | | 150,100,50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 70 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | No | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 0.2 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 0.2 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 4743.53 | (b)Waste/Barren Land | 5097.08 | (c)Grazing/ Community Land | 8744.36 | (d)Surface Water Bodies | 1418.57 | (e)Settlements | 0 | (f)Industrial | 4562.30 | (g)Forest | 0 | (h)Mangroves | 0 | (i)Marine Area | 2862.20 | (j)Others : Scrubbed/degraded vegetation | 4000.62 | Total | 31428.66 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Built Up Area | | 0.0695 | | (2.) | Green belt | | 0.0600 | | (3.) | Others | Roads, Open Area & Parking Area | 0.0705 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | -- | 0 | Not Applicable | (2.) | Corridors | -- | 0 | Not Applicable | (3.) | Wildlife Corridors | -- | 0 | Not Applicable | (4.) | NPA | -- | 0 | Not Applicable | (5.) | ESAs | -- | 0 | Not Applicable | (6.) | Critically Polluted Area | -- | 0 | Not Applicable | (7.) | ESZs | -- | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | -- | 0 | Not Applicable | (2.) | Archaeological Sites | | -- | 0 | Not Applicable | (3.) | Defence Installations | | -- | 0 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.2 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 5 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 0 | (f)Total Manpower | 15 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 0.06 | (b)Percentage of Total Project Area | 30.00 | (c)No. of Plants to be Planted | 50 | (d)Funds Allocated for Plantation | 10000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/IA 0071 | (ii)Name of the EIA Consultant | M/s. Jyoti Om Chemical Research Centre Pvt. Ltd. | (iii)Address | Shed K-1, 7705/2-4, GIDC Estate, Ankleshwar - 393002. | (iv)Mobile No. | 9429161860 | (v)Landline No. | 0264220293 | (vi)Email Id | environment@jyotiom.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 18 Dec 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 05/04/2022 | PL. SUBMIT EACH AND EVERY SPECIFIC ToR COMPLIANCE FOR PROPOSED EXPANSION PROJECT WITH BASELINE DATA MONITORING AS APPLICABLE TO PROPOSED PROCESS OF PROJECT specifically for process parameter pollutant like VOC parameter.
2. Pl. submit justification regarding proposed diluting products is EC applicable product or not .
3. Pl. submit compliance of CPCB direction under section 18(1)(B) to CETP for additional waste water discharge in CETP of NIA by PP.
Pl. submit revalidated CETP membership certificate with mentioning booked load and spare capacity of CETP.
5. Pl. submit compliance of MoEF & CC OM dated 07.07.2021 regarding expansion project with respect to Closure order issued by GPCB showing CLT acid production started without permission of the Board.
6. Pl. submit proof regarding existing products CCA copy before year 2006 with respect to showing nonapplicability of EC for existing plant. | | (2.) | 12/04/2022 | The correction have been made as per the instruction received | | (3.) | 19/04/2022 | Pl. submit pointwise reply of querry generated on 05.04.2022 in variabbly in addional information document in place of simply mentioning correction made. | | (4.) | 21/04/2022 | The correction have been made as per the instruction received | | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 02/07/2022 | As per minutes | | (2.) | 01/08/2022 | Our Appraisal Presentation was schedule on 425th meeting dated 23rd May 2022. However, due to unavoidable circumstances we could not attend the same. Now, we are willing to attend the next SEAC meeting, as scheduled by the committee. | ADS Letter | (3.) | 08/09/2022 | As per SEAC MOM | | (4.) | 04/11/2022 | Compliance to the observations / requirements with supporting documents have been uploaded. With the due hope that we complied with the requirements, Kindly grant us the Environment Clearance. | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Ramnikbhai Tratiya | Designation | Proprietor | Name of Company (Applicant Name should not be given here) | TEJAL INDUSTRIES | Address | Plot No. 730,731 GIDC Estate, Ankleshwar, Gujarat |
|