Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Tejal Industries
(b)Name of the Company / Organisation TEJAL INDUSTRIES
(c)Registered Address Plot No. 730,731 GIDC Estate, Ankleshwar, Gujarat,,Bharuch,Gujarat-393002
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Ramnikbhai Tratiya
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address Plot No. 730, 731 GIDC Estate, Ankleshwar, Gujarat,,Anklesvar,Bharuch,Gujarat-393002
(d)Pin code 393002
(e)E-mail keyur2710@gmail.com
(f)Telephone No. 264-6220110
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND3/62266/2021
(e)Master Proposal Number(Single Window) SW/261740/2022
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 730, 731, GIDC Estate, Ankleshwar, Dist.
(b)Pincode 393002
(c)Bounded Latitudes (North)
From
Degree 21
Minutes 36
Second 47.96
From
Degree 21
Minutes 36
Second 49.18
(d)Bounded Longitudes (East)
From
Degree 73
Minutes 1
Second 16.65
From
Degree 73
Minutes 1
Second 17.95
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 13
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchAnklesvarAnkleshvar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/76304/2021
(b)Date of Apply of TOR 26 Mar 2021
(c)Date of Issue of TOR / Standard ToR 03 Apr 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located within Industrial Estate
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Open Vessel Reactor6 KL1 No.
(2.)Open Vessel Reactor2 KL1 No.
(3.)Pulverizer15 HP1 No.
(4.)Filter Press36 Plates1 No.
(5.)Filter Press24 Plates1 No.
(6.)Open Vessel Reactor1 KL1 No.
(7.)Open Vessel Reactor17 KL1 No.
(8.)Ball Mill2000 Lit1 No.
(9.)Open Vessel Reactor5 KL1 No.
(10.)Dryer200 Tray1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pigment Lake Red C96Tons per AnnumRoad
(2.)Pigment Maroon toner Or96Tons per AnnumRoad
(3.)Pigment Red RC Or96Tons per AnnumRoad
(4.)Diluted products of product No. 1 to 4 listed above (30%)864Tons per AnnumRoad
(5.)4 B Acid240Tons per AnnumRoad
(6.)Pigment Rubine Tonner96Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Jan 2019
(iv)Valid Upto 15 Dec 2023
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.2
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.185
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.002
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.2085
(e) Funds Allocated for Environment Management Capital(%) 92.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2300.28
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2300.28
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)B Naphthol27.72Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(2.)Calcium chloride117.48Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(3.)Caustic soda (48%)203.88Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(4.)CLT Acid (C-Acid)42.72Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(5.)Gum Rosin70.32Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(6.)Hydrochloric acid221.76Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(7.)Barium Chloride38.4Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(8.)Fuel394.200Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(9.)Bon Acid111Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(10.)Sodium nitrite54.12Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(11.)Sulfuric Acid173.76Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(12.)2B Acid42.72Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(13.)Precipitate Silica576Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(14.)Tobias Acid52.44Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
(15.)P-Toludine173.76Tons per AnnumLocal suppliersRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 01 Mar 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube46104580
(2.)PM10Micro Gram per Meter Cube894888100
(3.)PM2.5Micro Gram per Meter Cube45254460
(4.)NOxMicro Gram per Meter Cube52124880
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l15035945002000
(2.)Total Hardnessmg/l598356300600
(3.)TSSmg/l10500
(4.)Fluoridemg/l0.50.111.5
(5.)Chloridesmg/l890802501000
(6.)OthersAlkalanitymg/l584160200600
(7.)pHNA7.97.16.58.5
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTDSmg/l1104480B
(2.)DOmg/l4.52.5B
(3.)pHNA8.36.8B
(4.)BODmg/l1010B
(5.)CODmg/l1010B
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))5842-
(2.)Leq(Night)A-weighted decibels(dB(A))5535-
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram66.26.1
(2.)K(Potassium)Milligram per Kilogram136120
(3.)pH8.127.23
(4.)N(Nitrogen)Milligram per Kilogram53.812.1
(5.)Electric ConductivityMillisiemens per Centimetre0.3650.223
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 14
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 8 To 9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC9.60.1Copy of Permission LetterPipelineOthersPipe LineNTA/ANK/DEE(WS)/173823 Dec 202115
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic + Industrial17.120ETP + R.OOthersNCT14.42.7
16.1.
(a)Total Waste Water Generation 17.1
(b)Total Discharged Water 2.7
(c)Total Reused Water 14.4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Contaminated containers/Barrels/Liners/Industrial Waste12.5Tons3.3RoadAuthorized Recyclers
(2.)Used OilIndustrial Waste0.02Kilolitre5RoadAuthorized Recyclers
(3.)ETP SludgeIndustrial Waste60Tons3.3RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube361.480.47636.47680
(2.)NOxMicrogram per Meter Cube491.480.2849.2880
(3.)PM2.5Microgram per Meter Cube441.480.1844.1860
(4.)PM10Microgram per Meter Cube891.480.2789.27100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler 1 & 2Agro Waste / Briquettes210.3PM10,SO2,NOx150,100,50
(2.)Hot Air GeneratorAgro Waste / Briquettes110.2PM10,SO2,NOx150,100,50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 70
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.2
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.2
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4743.53
(b)Waste/Barren Land 5097.08
(c)Grazing/ Community Land 8744.36
(d)Surface Water Bodies 1418.57
(e)Settlements 0
(f)Industrial 4562.30
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 2862.20
(j)Others : Scrubbed/degraded vegetation 4000.62
    Total 31428.66
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area0.0695
(2.)Green belt0.0600
(3.)OthersRoads, Open Area & Parking Area0.0705
Total 0.2
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLS--0Not Applicable
(2.)Corridors--0Not Applicable
(3.)Wildlife Corridors--0Not Applicable
(4.)NPA--0Not Applicable
(5.)ESAs--0Not Applicable
(6.)Critically Polluted Area--0Not Applicable
(7.)ESZs--0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--0Not Applicable
(2.)Archaeological Sites--0Not Applicable
(3.)Defence Installations--0Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.2
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 10
(e)No. of working days 0
(f)Total Manpower 15
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.06
(b)Percentage of Total Project Area 30.00
(c)No. of Plants to be Planted 50
(d)Funds Allocated for Plantation 10000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEmployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/IA 0071
(ii)Name of the EIA Consultant M/s. Jyoti Om Chemical Research Centre Pvt. Ltd.
(iii)Address Shed K-1, 7705/2-4, GIDC Estate, Ankleshwar - 393002.
(iv)Mobile No. 9429161860
(v)Landline No. 0264220293
(vi)Email Id environment@jyotiom.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 18 Dec 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)05/04/2022PL. SUBMIT EACH AND EVERY SPECIFIC ToR COMPLIANCE FOR PROPOSED EXPANSION PROJECT WITH BASELINE DATA MONITORING AS APPLICABLE TO PROPOSED PROCESS OF PROJECT specifically for process parameter pollutant like VOC parameter. 2. Pl. submit justification regarding proposed diluting products is EC applicable product or not . 3. Pl. submit compliance of CPCB direction under section 18(1)(B) to CETP for additional waste water discharge in CETP of NIA by PP. Pl. submit revalidated CETP membership certificate with mentioning booked load and spare capacity of CETP. 5. Pl. submit compliance of MoEF & CC OM dated 07.07.2021 regarding expansion project with respect to Closure order issued by GPCB showing CLT acid production started without permission of the Board. 6. Pl. submit proof regarding existing products CCA copy before year 2006 with respect to showing nonapplicability of EC for existing plant.
(2.)12/04/2022The correction have been made as per the instruction received
(3.)19/04/2022Pl. submit pointwise reply of querry generated on 05.04.2022 in variabbly in addional information document in place of simply mentioning correction made.
(4.)21/04/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)02/07/2022As per minutes
(2.)01/08/2022Our Appraisal Presentation was schedule on 425th meeting dated 23rd May 2022. However, due to unavoidable circumstances we could not attend the same. Now, we are willing to attend the next SEAC meeting, as scheduled by the committee.ADS Letter
(3.)08/09/2022As per SEAC MOM
(4.)04/11/2022Compliance to the observations / requirements with supporting documents have been uploaded. With the due hope that we complied with the requirements, Kindly grant us the Environment Clearance.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamnikbhai Tratiya
DesignationProprietor
Name of Company (Applicant Name should not be given here)TEJAL INDUSTRIES
AddressPlot No. 730,731 GIDC Estate, Ankleshwar, Gujarat