Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Mixed Used Development On Plot Bearing S. Nos. 86/1, 86/2, 86/3(A), 86/4(A), 86/5(A), 115/1(A), 115/2(A), 115/3(A), 115/4(A), 115/5(A), 115/6, 115/7(A), 115/9(A), 116/1, 116/2, 116/3, 116/4, 116/5, 116/6, 117/1, 117/2, 117/3, 117/4, 117/5, 117/6, 117/7, 117/8, 117/9, 117/10 and 117/11, Pokhran Road no. 1, Village Panchpakhadi, Taluka Thane, District Thane.by M/s. Elpis Ventures Pvt. Ltd.
(b)Name of the Company / Organisation M/S. ELPIS VENTURES PRIVATE LIMITED
(c)Registered Address Virtuous retail, VR Bengaluru, No. 11B, Devasandra Industrial Area, 2nd stage, Mahadevpura, Bengaluru, Karnataka, India,,Bangalore Urban,Karnataka-560048
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant WR Kumaran
(b)Designation (Owner/ Partner/ CEO) President Projects
(c)Address same as user agency,,Bangalore East,Bangalore Urban,Karnataka-560048
(d)Pin code 560048
(e)E-mail kumaran_wr@virtuousretail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/MIS/64293/2021
(e)Master Proposal Number(Single Window) SW/259165/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot Bearing S. Nos. 86/1, 86/2, 86/3(A), 86/4(A),
(b)Pincode 400601
(c)Bounded Latitudes (North)
From
Degree 19
Minutes 12
Second 22
From
Degree 19
Minutes 12
Second 25
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 57
Second 59
From
Degree 72
Minutes 58
Second 9
(e)Survey of India Topo Sheet No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 60
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2.09
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraThaneThaneVillage Panchpakhadi, Taluka Thane, District Thane
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SIA/MH/MIS/64293/2021
(c)Date of Apply of TOR 29 Jun 2021
(d)Date of Issue of TOR / Standard ToR 22 Dec 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason as per EIA Notification
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Tower-1 HospitalityB4+B3+B2+B1+Ground+1st to 4th MLCP floors + 5th to 39th upper floors.
(2.)Tower-2 CommercialB4+B3+B2+B1+Ground+1st to 13th MLCP floors + 14th to 51st (part) upper floors.
(3.)Tower-3 ComercialB4+B3+B2+B1+Ground+1st to 13th MLCP floors + 14th to 55th upper floors
(4.)EWS bldgB4+B3+B2+B1+Ground+1st to 17th upper floors + 18th (p) floors.
(5.)Retail blockB4+B3+B2+B1+G+4th UL+5th to 9th (p) MLCP floors+10th to 13rd p) upper floors-
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)FSI Area394169.47OtherssqmRoad
(2.)Non FSI Area265790.73OtherssqmRoad
(3.)Total Construction Area659960.20OtherssqmRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 2830
(b) Funds Allocated for Environment Management (Capital) (in crores) 45.00
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 23.9
(e) Funds Allocated for Environment Management Capital(%) 1.59
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Construction Project0OthersMTNear by placesRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube142.7820.61134.22100
(2.)PM2.5Micro Gram per Meter Cube89.6915.3986.6160
(3.)SO2Micro Gram per Meter Cube41.609.2740.6580
(4.)OthersCOMili Gram per Meter Cube1.900.271.824
(5.)NOxMicro Gram per Meter Cube52.6014.2052.5280
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.687.688.58.5
(2.)TDSmg/l320.00320.005002000
(3.)Fluoridemg/l0.200.201.01.5
(4.)Total Hardnessmg/l176.00176.00200600
(5.)TSSmg/l001.005.00
(6.)Chloridesmg/l48.0048.002501000
(7.)OthersPbmg/l0.0010.0010.010.01
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.967.70C
(2.)DOmg/l4.804.20C
(3.)OthersTotal ColiformOthersMPN/100ml35001800C
(4.)BODmg/l9.006.00E
(5.)CODmg/l29.0022.00E
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))45.3643.0340
(2.)Leq(Day)A-weighted decibels(dB(A))65.7657.5155
    14.5.     No. of Soil Sample Monitored Locations : 2
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.967.83
(2.)N(Nitrogen)Milligram per Kilogram755.47686.24
(3.)K(Potassium)Milligram per Kilogram2314.342216.30
(4.)P(Phosphorus)Milligram per Kilogram10.089.84
(5.)Electric ConductivityOthersµS/cm380.19356.21
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.50 To 14.60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.20 To 6.90
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTMC20975Copy of Permission LetterPipelineOthersMuncipal pipe lineapplication made to TMC01 Mar 20220
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic and Flushing water16911875MBBRReuse within the Plant & Recycling,Othersflushing, HVAC and landscpe16910
16.1.
(a)Total Waste Water Generation 1691
(b)Total Discharged Water 0
(c)Total Reused Water 1691
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable wasteMunicipal Solid Waste1243Tons0OthersOWCOthersOWC
(2.)Non Biodegradable wasteMunicipal Solid Waste2719Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube41.6000.7442.3480
(2.)PM2.5Microgram per Meter Cube89.6900.0789.7660
(3.)PM10Microgram per Meter Cube142.7801.02143.8100
(4.)NOxMicrogram per Meter Cube52.6000.3952.9980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)18 nos of DG setHSD221.940.40PM10,SO2,PM2.5 ,NO2DG operation during power failure only
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 41587
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 18 dg set of 4 x 1500,9 x 2000,4 x 2250,1 x 160
(e)Stack Height (in m) 221.94
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 7.8310
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 7.8310
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Private 7.831
    Total 7.831
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersBuilding Construction7.8310Mixed Used Project
Total 7.831
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area-00
(2.)WLS000
(3.)NPA000
(4.)ESAs000
(5.)ESZsTcfs2.5away from the notified ESZ
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installations000
(2.)Forest000
(3.)Archaeological Sites000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 441
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 7.831
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired private plot, I to C/R done
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ulhas river, Upvan lake, siddeshwar lake, masunda lake etc
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 700
(b)Permanent Employment-During Operation 20000
(c)Temporary Employment- During Construction 400
(d)Temporary Employment- During Operation 400
(e)No. of working days 6
(f)Total Manpower 21500
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.4953
(b)Percentage of Total Project Area 6.32
(c)No. of Plants to be Planted 4577
(d)Funds Allocated for Plantation 350
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Social• The project provides an employment opportunity for the local community. • Commercial buildings are proposed which will also generate a good number of job opportunities. • This is a mixed-use maste
(2.)EnvironmentalThe project will provide many facilities for improvement of the physical environment. This is a well-designed project and uses the sustainable development policy. The project will be provided with suf
(3.)FinancialThe project is located in Thane where properties have shown an unprecedented growth. It has become a Fast-Growing Commercial hub zone catering to the affordable residential and commercial properties a
(4.)EnvironmentalThe proposed project has a greenery area which helps to protect the environmental quality. STP, OWC, RWH system, Solar systems all proposed. The project has received GOLD pre certification for LEED
(5.)SocialThe project will provide many facilities for improvement of the physical environment. This is a well-designed project and uses the sustainable development policy. The project will be provided with suf
(6.)EnvironmentalThe project will be provided with sufficient road facilities within the project premises and a large area will be provided for the parking of vehicle. The proposed project has a greenery area which he
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 213.00
(b)Total No. of Flats to be Build 248
(c)No. of Buildings 5
(d)Total plot area (sqm) 78310.00
(e)Total built up area (sqm) 659960.20
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
    Capacity 650
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4795/14067
5.
Energy Saving Measures:
(a)Source/Mode Solar, LED, etc
(b)Percentage 21.18
(c)Quantity 1682
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Proper Internal SWD design has been proposed
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA0206
(ii)Name of the EIA Consultant Enviro Analysts and Engineers Private Limited
(iii)Address B-1003,Enviro House,10th floor| Western Edge-II, W.E Highway|Borivali(E),Mumbai-400066
(iv)Mobile No. 9321619749
(v)Landline No. 2228541647
(vi)Email Id info@eaepl.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 13 May 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)04/07/2022Pls comply as per minutes uploaded.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantWR Kumaran
DesignationPresident Projects
Name of Company (Applicant Name should not be given here)M/S. ELPIS VENTURES PRIVATE LIMITED
AddressVirtuous retail, VR Bengaluru, No. 11B, Devasandra Industrial Area, 2nd stage, Mahadevpura, Bengaluru, Karnataka, India
Print