Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Existing Common Bio-Medical Waste Treatment Facility at 41, F-Road, Belgachia, Liluah P.S., Howrah P.O. & District, West Bengal.
(b)Name of the Company / Organisation MEDICARE ENVIRONMENTAL MANAGEMENT PVT. LTD.
(c)Registered Address 13th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad,,Hyderabad,Telangana-500032
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sanjay Prakash Garg
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address 13th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad,Rangareddi,Telangana-500081
(d)Pin code 500081
(e)E-mail medicarebmw@gmail.com
(f)Telephone No. 40-24446000
(g)Fax No. 04029800121
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(d)(a)Common Bio-Medical Waste Treatment Facility
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/WB/MIS/47616/2019
(e)Master Proposal Number(Single Window) SW/256664/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 41, F-Road (Dag numbers 292(P), 510(P), 885(P) and
(b)Pincode 711108
(c)Bounded Latitudes (North)
From
Degree 22
Minutes 36
Second 25.30
From
Degree 22
Minutes 36
Second 29.63
(d)Bounded Longitudes (East)
From
Degree 88
Minutes 19
Second 33.06
From
Degree 88
Minutes 19
Second 36.26
(e)Survey of India Topo Sheet No. F45K2, F45K6
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.1
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalHowrahBally JagachhaBelgachia
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number EN/T-II-1/006/2020
(c)Date of Apply of TOR 11 Jan 2020
(d)Date of Issue of TOR / Standard ToR 12 Nov 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Nov 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Dec 2021
Distance of Public Hearing Venue from the Proposed Project :1
J-Road, Belgachia Chatramilan Sangha, 29/6, J Road, Belgachia, Howrah District - 711105, West Bengal
State :West Bengal
District :Howrah
Tehsil :Bally Jagachha
Village :Belgachia
51People present in the public hearing welcomed the proposed expansion project and asked for the employment and discussed health hazard due to emission.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Incinerators750 kg/hr (Existing- 2 nos. x 250 kg/hr- one working and one stand by, Proposed- 2 nos. x 250 kg/hr)
(2.)Shredder7.5 TPD (Existing 1 no. x 60 kg/hr, 1 no. x 80 kg/hr, Proposed- 1 no. x 5 TPD)
(3.)Autoclave7.5 TPD (Existing 2 nos. x 2.5 TPD- one working and one stand by, Proposed- 2 nos. x 2.5 TPD each)
(4.)ETP150 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Biomedical Waste15Tons Crushed per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Feb 2019
(iv)Valid Upto 30 Nov 2023
(v)File No. 03/2S/CON (BM)-1633/2003
(vi)Application No. CO113599
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 12
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.65
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2
(e) Funds Allocated for Environment Management Capital(%) 22.08
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD70Otherslitre/hourLocal MarketRoad1 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2020 To 28 Feb 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube68.340.968.360
(2.)SO2Micro Gram per Meter Cube25.112.225.180
(3.)NOxMicro Gram per Meter Cube38.224.238.280
(4.)OthersO3Micro Gram per Meter Cube31.920.431.9100
(5.)PM10Micro Gram per Meter Cube90.457.890.4100
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.26.86.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l27083905002000
(4.)Total Hardnessmg/l1525227200600
(5.)Chloridesmg/l1130352501000
(6.)Fluoridemg/l1111.5
(7.)Heavy MetalsIronmg/l1.880.20.30.3
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTotal coliformOthersMPN/100ml3924A
(2.)BODmg/l148D
(3.)DOmg/l6.15.9A
(4.)CODmg/l3924E
(5.)pHNA7.36.9A
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.549.855/65
(2.)Leq(Night)A-weighted decibels(dB(A))47.24045/55
    14.5.     No. of Soil Sample Monitored Locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.97.2
(2.)P(Phosphorus)Kilogram per hectare125
(3.)Electric ConductivityOthersMicro Siemens per centimetre375220
(4.)N(Nitrogen)Kilogram per hectare27331
(5.)K(Potassium)Kilogram per hectare367229
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersBorewell and municipal water supply451 Not Appliacble modeOthersBorewell and municipal water supplyOthersBorewell and municipal water supply021 Feb 20220
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent114150ETPOthersRecirculated in APCDS1140
(2.)Domestic66Septic Tank/ Soak pitOthersSeptic Tank/ Soak pit06
16.1.
(a)Total Waste Water Generation 120
(b)Total Discharged Water 6
(c)Total Reused Water 114
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from IncineratorBottom Ash200Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)SludgeOthersETP2850Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube90.40.80.4990.89100
(2.)SO2Microgram per Meter Cube25.10.81.826.980
(3.)NOxMicrogram per Meter Cube38.20.84.142.380
(4.)PM2.5Microgram per Meter Cube68.30.80.2968.5960
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Incinerator (2 nos x 250 kg/hr)HSD300.6PM100.14 g/s each
(2.)DG Set (300 kVA)HSD70.2SO20.001 g/s
(3.)Incinerator (250 kg/hr)HSD300.6PM100.14 g/s
(4.)Incinerator (2 nos. x 250 kg/hr)HSD300.6NOx1.08 g/s each
(5.)Incinerator (250 kg/hr)HSD300.6SO20.54 g/s
(6.)Incinerator (2 nos. x 250 kg/hr)HSD300.6SO20.54 g/s each
(7.)DG Set (125 kVA)HSD50.15PM100.006 g/s
(8.)DG Set (125 kVA)HSD50.15SO20.0006 g/s
(9.)DG Set (125 kVA)HSD50.15NOx0.11 g/s
(10.)DG Set (300 kVA)HSD70.2NOx0.26 g/s
(11.)DG Set (300 kVA)HSD70.2PM100.013 g/s
(12.)Incinerator (250 kg/hr)HSD300.6NOx1.08 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 300
(b)Source West Bengal State Electricity Distribution Company
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set (300 kVA)
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.8
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.8
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0.8
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Other 0
    Total 0.8
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.267
(2.)Main Plant0.446
(3.)OthersRoads and parking area0.096
Total 0.809
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone10None in 10 km radius
(2.)NPANone10None in 10 km radius
(3.)Wildlife CorridorsNone10None in 10 km radius
(4.)CorridorsNone10None in 10 km radius
(5.)ESZsNone10None in 10 km radius
(6.)WLSNone10None in 10 km radius
(7.)ESAsHoogly River2.5East
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA10None in 10 km radius
(2.)Defence InstallationsNA10None in 10 km radius
(3.)Archaeological SitesIndian Museum5Southeast
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.8
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Existing land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Hoogly River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.267
(b)Percentage of Total Project Area 33.38
(c)No. of Plants to be Planted 30
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImproper segregation of waste results in mixing of hospital wastes with general waste making the whole waste stream hazardous. Due to this facility, bio medical waste is being treated and disposed pro
(2.)SocialLocal people are employed for operation of this facility. Direct employment and indirect employment opportunities are developed because of this facility.
(3.)FinancialIn view of the difficulties faced by private hospitals, nursing homes and clinics that could not make their own arrangements due to high cost involved in setting up treatment and disposal facilities,
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 0.8
(e)Total built up area (sqm) 0.446
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
    Capacity 80
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 80 sqm
5.
Energy Saving Measures:
(a)Source/Mode LED bulbs shall be used for street lights
(b)Percentage 15
(c)Quantity 15
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will not be any impact on water bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/SA 0134
(ii)Name of the EIA Consultant Ramky Enviro Services Private Limited
(iii)Address 12th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad - 500032
(iv)Mobile No. 9246782274
(v)Landline No. 4023015369
(vi)Email Id subash.k@ramky.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)06/04/2022Please submit all necessary documents as sought by SEAC during the 36th meeting of the reconstituted SEAC held on 23.03.2022. Queries are mentioned in details in the Minutes of the 36th reconstituted SEAC meeting.
(2.)28/10/2022All the documents/information sought by SEAC has been uploaded.ADS Letter
(3.)17/11/2022Please submit all necessary documents as sought by SEAC during the 55th meeting of the reconstituted SEAC held on 09.11.2022. Queries are mentioned in details in the Minutes of the 55th reconstituted SEAC meeting.
(4.)02/06/2023With reference to the additional details sought by the SEAC during 55th SEAC meeting held on 09-11-2022, we are hereby submitting pointwise ADS clarifications for kind consideration of our proposal.ADS Letter
(5.)02/06/2023With reference to the additional details sought by the SEAC during 55th SEAC meeting held on 09-11-2022, we are hereby submitting pointwise ADS clarifications for kind consideration of our proposal.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjay Prakash Garg
DesignationAGM
Name of Company (Applicant Name should not be given here)MEDICARE ENVIRONMENTAL MANAGEMENT PVT. LTD.
Address13th Floor, Ramky Grandiose, Ramky Towers Complex, Gachibowli, Hyderabad
Print