Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for production of road metal of 5400Cum/Annum over Dubula Stone Quarry Mouza Dubula, PS- Tarabha, Dist- Subarnapur, Hold No- 251, Plot No:1370 over an area of 13.00 acres (5.2611 Ha) of Sri Narottam Mohanty, Plot no. 272, Kharvela Nagara, Unit-3, Dist- Khurda, Bhubaneswar
(b)Name of the Company / Organisation NAROTTAM MOHANTY
(c)Registered Address Plot No 272,Kharvel Nagar,,Khordha,Orissa-751001
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Narottam Mohanty
(b)Designation (Owner/ Partner/ CEO) Lessee
(c)Address Plot No 272,Kharvel Nagar,,Bhubaneswar,Khordha,Orissa-751001
(d)Pin code 751001
(e)E-mail ultralookventurespvtltd@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/OR/MIN/72108/2020
(e)Master Proposal Number(Single Window) SW/255755/2022
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1377(AAA),Khata No251
(b)Pincode 767016
(c)Bounded Latitudes (North)
From
Degree 20
Minutes 38
Second 00
From
Degree 20
Minutes 38
Second 12
(d)Bounded Longitudes (East)
From
Degree 83
Minutes 40
Second 10
From
Degree 83
Minutes 40
Second 18
(e)Survey of India Topo Sheet No. F44X10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 163
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 60
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaSonapurTarbhaDubula
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/OR/MIN/59078/2020
(b)Date of Apply of TOR 11 Dec 2020
(c)Date of Issue of TOR / Standard ToR 21 Jan 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Jul 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :1
Dubula Village
State :Orissa
District :Sonapur
Tehsil :Tarbha
Village :DUBULA
61Environmental pollution, Degradation of Agriculture landOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rock Breaker10T2
(2.)Excavator0.9 Cum1 nos
(3.)Compressor250cfm1
(4.)Tipper/Tractor4/2.5cum2 nos.
(5.)jack Hammer6kgf/cf22nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Road Material5400OthersCum/ AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.2650
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.093
(e) Funds Allocated for Environment Management Capital(%) 53.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 35000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 35000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)deisel Fuel machine hired basis0.114Kilo Litre per Daylocal filling stationRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Oct 2020 To 24 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube62.736.062.1100
(2.)PM2.5Micro Gram per Meter Cube24.88.423.560
(3.)SO2Micro Gram per Meter Cube19.24.018.780
(4.)NOxMicro Gram per Meter Cube19.48.219.380
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.626.786.58
(2.)TDSmg/l1931625002000
(3.)Total Hardnessmg/l9676300600
(4.)Chloridesmg/l7.25.62501000
(5.)TSSmg/l83100500
(6.)Heavy MetalsCumg/l000.051
(7.)Fluoridemg/l0.220.1911.5
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l1613C
(2.)pHNA7.327.1B
(3.)DOmg/l145.9B
(4.)BODmg/l2.10B
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))48.643.655
(2.)Leq(Night)A-weighted decibels(dB(A))39.236.445
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.0820.062
(2.)P(Phosphorus)Percent0.0260.020
(3.)pH6.746.28
(4.)K(Potassium)Percent0.090.06
(5.)Electric ConductivityMillisiemens per Centimetre43230
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.73 To 8.55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.5 To 4.81
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGovernmnet Water Supply71.5Copy of Permission LettermodeOthersMobile Water TankerOthersMobile Water Tanker0008 Feb 20228
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic0.011Soak PitDischarge into Surface Water Body0.01
16.1.
(a)Total Waste Water Generation 0.01
(b)Total Discharged Water 0.01
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Over BurdenOthersOver Burden600Tons0RoadOthersstored and reuse
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube19.23.50.00119.20180
(2.)NOxMicrogram per Meter Cube19.43.5019.480
(3.)PM2.5Microgram per Meter Cube24.83.50.0224.8260
(4.)PM10Microgram per Meter Cube62.71264.7100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DgsetDisel150.2PM10
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100
(b)Source State Grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 15
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 5.2611
(d)Revenue Land 0
(e)Other Land 0
    Total Land 5.2611
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 6119.13
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 666.36
(d)Surface Water Bodies 383.33
(e)Settlements 193.50
(f)Industrial 1.54
(g)Forest 783.23
(h)Mangroves 5.01
(i)Marine Area 0
(j)Others : Railway, Road,Quarry,embankment 197.8
    Total 8349.9
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.825
(2.)Quarry Area0.545
(3.)OB Dump Area0.300
(4.)Built Up Area0.020
(5.)Othersunutilized area, Mineral stack, Road3.571
(6.)Township0
(7.)Main Plant0
(8.)Ash Pond0
(9.)Safety Zone0
(10.)Tailing Pond0
(11.)LandFill0
(12.)Water Reservoir0
(13.)Desalination Plant0
Total 5.261
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNIL100NO WLS AREA WITHIN 10 KM
(2.)ESZsNILL100NO ESZ WITHIN 10 KM
(3.)ESAsNILL100NO ESA WITHIN 10 KM
(4.)Critically Polluted AreaNIL100NO CRTICALLY POLLUTED AREA WITHIN 10 KM
(5.)NPANILL100NO NPA WITHIN 10 KM
(6.)CorridorsNILL100NO CORRIDOR WITHIN 10 KM
(7.)Wildlife CorridorsNILL100NO CORRIDOR WITHIN 10 KM
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNILL100NO FOREST LAND WITHIN 10KM RADIUS
(2.)Defence InstallationsNILL100NO DEFENCE INSTALLTION WITHIN 10KM RADIUS
(3.)Archaeological SitesNILL100NO ARCHAEOLOGICAL SITE WITHIN 10KM RADIUS
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 5.261
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area TelRiver
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 4.37
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2
(b)Permanent Employment-During Operation 1
(c)Temporary Employment- During Construction 12
(d)Temporary Employment- During Operation 6
(e)No. of working days 300
(f)Total Manpower 21
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.80
(b)Percentage of Total Project Area 34.21
(c)No. of Plants to be Planted 4800
(d)Funds Allocated for Plantation 7.50
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe impact of project on environment will not be significant, however the plantation activity done by project will have positive impact on local environment
(2.)SocialCompany will undertake awareness program and community activities like health, camps, meaids, family welfare camps, AIDS awareness program etc. Periodic medical checkups as per MAct/ Rules
(3.)FinancialThe project wills beneficiate financial to the proponent and Government. There will be revenue generation for the government in form of Royalty, taxes and DMF. The proponent will get financial benefi
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ROAD MATERIALMinor
2.
Mine Capacity in ROM (Run of Mine) 6000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 127/BZ
(b)Date of Approval 30 May 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 5.261
(f)Approved Capacity 5400
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1.4
(b)Mineable Reserves (Million Ton) 1.0
(c)Extractable Reserves(Million Ton) 0.06
(d)Percent(%) of Extraction 6
(e)Grade of Coal /Ore /Mineral 56
(f)Stripping Ratio 9 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 87
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 5.261
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 02 Jul 2020
(iii)Validity of LOI 5
(iv)Reference No. of LOI 1880
(c)Whether Lease Deed Executed ? No
(i)Reason thereof AFTER OBTAING EC ,LEASE WILLBE EXECUTED
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.3
(iii)Height (in meter) 1.08
(iv)Quantity (in Million Cubic meter) 3240
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.3
(iii)Height (in meter) 1.08
(iv)Quantity (in Million Cubic meter) 3240
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.000545
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.000545
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.000545
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0.545
(b)Depth (in meter) 6
(c)Volume (in Million Cubic meter) 0.327
12.
Details of Quarry:
(a)Final Void of 0.545 (hectare) at a Depth of 6 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0.327
13.
Details of Transportation:
(a)In Pit/Underground to Surface 25
(b)Surface to Siding/Loading 50
(c)Transportation / Conveyor Details Trucks/Tripper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)GRAZING LAND000
(2.)WASTE LAND5.26105.261
(3.)SETTLEMENTS000
(4.)SURFACE WATER BODIES000
(5.)FOREST LAND000
(6.)AGRICULTURE LAND000
TOTAL5.26105.261
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT0.825000.825
(2.)OtherMineral Stack0.020000.02
(3.)EXTERNAL OB DUMPS0000
(4.)TOP SOIL STORAGE0000
(5.)BUILT UP AREA (COLONY/OFFICE)0.020000.02
(6.)INTERNAL OB DUMPS0.300000.3
(7.)EXCAVATION/QUARRY0.545000.545
(8.)ROADS000.0500.05
(9.)VIRGIN AREA3.501003.501
TOTAL5.21100.0505.261
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.300
(c)Quarry(in hectare) 0.545
(d)Safety Zone(in hectare) 0.825
(e)Final Void of 0.545 (hectare) at a Depth of 6 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2667
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0.90
(h)Total afforestation plant (in hectare) 1.8
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2021200000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/IA0055
(ii)Name of the EIA Consultant ardra consulting services pvt ltd
(iii)Address A/79 SAHEED NAGAR
(iv)Mobile No. 9439100999
(v)Landline No. 0674254634
(vi)Email Id ardraconsulting09@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 29 Dec 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC meeting) Copy of Uploaded Proposal Presentation
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarottam Mohanty
DesignationLessee
Name of Company (Applicant Name should not be given here)NAROTTAM MOHANTY
AddressPlot No 272,Kharvel Nagar
Print