Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) An establishment of ā€œSynthetic Organic Cation & Anion Resinsā€ manufacturing unit by Ion Exchange India Limited located at Plot No.18/1, MIDC-Roha, Tal.: Roha, Dist: Raigad, Maharashtra, (INDIA), 402109
(b)Name of the Company / Organisation ION EXCHANGE INDIA LIMITED
(c)Registered Address Ion House, Dr. E. Moses Road, Mahalaxmi, Mumbai,,Mumbai City,Maharashtra-400011
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Mr Shirish Sirjoshi
(b)Designation (Owner/ Partner/ CEO) Senior Vice President
(c)Address Ion House, Dr. E. Moses Road, Mahalaxmi, Mumbai,Mumbai City,Maharashtra-400011
(d)Pin code 400011
(e)E-mail sirjoshi.sb@ionexchange.co.in
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/IND3/68615/2021
(e)Master Proposal Number(Single Window) SW/255256/2022
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 18/1 MIDC
(b)Pincode 402109
(c)Bounded Latitudes (North)
From
Degree 18
Minutes 25
Second 33.32
From
Degree 73
Minutes 8
Second 52.37
(d)Bounded Longitudes (East)
From
Degree 18
Minutes 25
Second 26.34
From
Degree 73
Minutes 8
Second 57.89
(e)Survey of India Topo Sheet No. 47 F2, 47 F3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 11
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadRohaDhatav
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/MH/IND3/68615/2021
(b)Date of Apply of TOR 22 Oct 2021
(c)Date of Issue of TOR / Standard ToR 27 Oct 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project site is located in notified Industrial are
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)P. P. Vessel with strainer plate2000 ltr ā€“ 3nos., 6000 ltr -1 no.
(2.)HDPE vessel with strainer plate10000 ltr ā€“ 7 nos., 5000 ltr -7 nos.
(3.)MSGL Vessel3000 ltr ā€“ 2 nos., 5000 ltr -3 nos.
(4.)Silo- PP sleeve with SS dome with screw conveyor8000 ltr ā€“ 9 nos., 10000 ltr -10 nos., 12000 ltr ā€“ 3 nos., 16000 ltr -1 no., 18000 ltr ā€“ 10 nos.
(5.)Silo- MS dome12000 ltr ā€“ 2 nos.
(6.)SS Vessel with strainer plate2000 ltr ā€“ 3 nos., 2500 ltr -1 no., 3000 ltr ā€“ 11 nos., 4000 ltr -12 nos., 6000 ltr ā€“ 1 no., 10000 ltr -6 nos.,
(7.)MS Vessel with strainer plate3000 ltr ā€“ 5 nos., 4500 ltr -5 nos.
(8.)Washer PP Sleeve-MSRL dome6000 ltr ā€“ 1 no., 10000 ltr -3 nos., 12500 ltr ā€“ 2 nos., 15000 ltr -3 nos., 18000 ltr ā€“ 1 no., 20000 ltr -17 nos.,
(9.)HDPE Tank2000 ltr. -1 no., 5000 ltr. ā€“ 9 nos., 10000 ltr ā€“ 3 nos., 20000 ltr ā€“ 7 nos., 30000 ltr.-18nos.
(10.)Flash Dryer600 Kg / Hr ā€“ 10 nos.
(11.)G.L. Jacketed Reactor with stirrerMSGL -4000 ltr -1 No., 5000 ltr-5 Nos., 6300 ltr-15 nos., 10000 ltr-16 Nos., 12500 ltr-18 Nos., 16000 ltr-30 Nos., 20000 ltr-8 Nos.
(12.)S.S. Jacketed Reactor with stirrer3000 ltr-2nos., 4000 ltr-1 no., 5000ltr- 9 nos., 6000 ltr ā€“ 2 nos., 10000 ltr ā€“ 6 nos., 14000 ltr- 7 nos., 16000 ltr ā€“ 18nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Anion Resins36000OthersMT/ARoad
(2.)Cation Resins36000OthersMT/ARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 400
(b) Funds Allocated for Environment Management (Capital) (in crores) 6.90
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 6.05
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.50
(e) Funds Allocated for Environment Management Capital(%) 1.73
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12094.04
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 12094.04
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iso Butyl Alcohol30.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(2.)AQ-B6.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(3.)Global-31.5OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(4.)Formaldehyde0.682OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(5.)Ferric Chloride30.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(6.)Benzoyl Peroxide12.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(7.)Poly Vinyl Alcohol0.5OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(8.)Oxalic Acid1.2OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(9.)Common Salt633.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(10.)MYL129.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(11.)Methylene Di chloride159.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(12.)Triethyl Amine3.125OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(13.)Phosphoric Acid2.955OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(14.)Tri Methyl Amine (30%)795.0OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(15.)Styrene (Monomer)126.9OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(16.)Hexamine1.875OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(17.)Global-49.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(18.)Methanol126.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(19.)Di Vinyl Benzene (Monomer)183.0OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(20.)Dimethyl Ethanol Amine420.0OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(21.)Gelatin9.0OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
(22.)DN-146.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(23.)Methyl Formaldehyde930.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(24.)Di Methyl Amine750.0OthersMT/MLocal MarketRoad500 OthersLocal MarketCopy of Linkage
(25.)Caustic Lye (48%)423.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(26.)Hydrochloric acid141.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(27.)Sulphuric acid4236.0OthersMT/MLocal MarketRoad800 OthersLocal MarketCopy of Linkage
(28.)Sodium Bicarbonate56.404OthersMT/MLocal MarketRoad200 OthersLocal MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2021 To 31 Mar 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube24.4017.9024.0860
(2.)PM10Micro Gram per Meter Cube65.0057.1064.86100
(3.)NOxMicro Gram per Meter Cube26.3020.6025.9880
(4.)SO2Micro Gram per Meter Cube23.2016.8023.2080
(5.)OthersCOMili Gram per Meter Cube0.100.020.104
    14.2.     No. of Ground Water Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l159.2975.84200200
(2.)Chloridesmg/l70.4729.55250250
(3.)Heavy MetalsIronmg/l0.30.010.30.3
(4.)Fluoridemg/l0.850.0311
(5.)pHNA7.737.246.58.5
(6.)TDSmg/l323.3175.35500500
(7.)OthersZincmg/l1.950.2155
(8.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l18.763.75E
(2.)DOmg/l4.360.96E
(3.)pHNA8.157.75E
(4.)CODmg/l45.029.27E
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))62.951.975
(2.)Leq(Night)A-weighted decibels(dB(A))50.840.870
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare119.9853.02
(2.)pH7.937.15
(3.)P(Phosphorus)Kilogram per hectare81.5521.55
(4.)K(Potassium)Kilogram per hectare135.2270.51
(5.)Electric ConductivityMillisiemens per Centimetre818.30161.53
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC29865Copy of Permission LetterPipelineOthersPipeline8713328 Sep 20212986
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial20202500ETPOthersCETP3501670
(2.)Domestic4.510STPOthersCETP04.5
16.1.
(a)Total Waste Water Generation 2024.5
(b)Total Discharged Water 1674.5
(c)Total Reused Water 350
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Battery WasteIndustrial Waste0.96Tons120RoadAuthorized Recyclers
(2.)E WasteIndustrial Waste1.2Tons120RoadAuthorized Recyclers
(3.)Boiler AshIndustrial Waste720Tons120RoadOthersSale to Brick Manufacture
(4.)Used / Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Discarded containersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)600Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Chemical SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)17340Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Spent ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4932Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)612Tons120RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Empty Containers / CarboysIndustrial Waste60Tons120RoadAuthorized Recyclers
(10.)Packaging MaterialIndustrial Waste30Tons120RoadAuthorized Recyclers
(11.)Plastic & Paper wasteIndustrial Waste120Tons120RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube24.083.870.0524.1360
(2.)NOxMicrogram per Meter Cube25.980.960.226.1880
(3.)SO2Microgram per Meter Cube23.200.963.026.2080
(4.)PM10Microgram per Meter Cube64.862.040.265.06100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boilers - 4 TPH & 10 TPH * 1 No. eachBriquettes/Coal/LDO/CNG300.45SO2,NOx ,OthersSPM-
(2.)DG Set-1250 KVA * 2 nos.HSD300.45SO2,NOx ,OthersSPM-
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source MSEDCL, Roha
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 Nos. of capacity 1250 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.4263
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.4263
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 7362
(b)Waste/Barren Land 907
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 588
(e)Settlements 1679
(f)Industrial 0
(g)Forest 10583
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Fallow Land + Open Scrub Land 10296
    Total 31415
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area16172.0
(2.)Green belt11429.6
(3.)OthersRoad+Open Space+Parking6661.4
Total 34263
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0There is no presence of any WLS in 10 Km radius of project
(2.)NPANil0There is no presence of any NPA in 10 Km radius of project
(3.)ESZsNil0There is no presence of any ESZ in 10 Km radius of project
(4.)Critically Polluted AreaNil0There is no presence of any CPA in 10 Km radius of project
(5.)CorridorsNil0There is no presence of any Corridors in 10 Km radius of project
(6.)Wildlife CorridorsNil0There is no presence of any Wildlife Corridors in 10 Km radius of project
(7.)ESAsDhatav0Draft notifications dated 10.03.2014, 04.09.2015, 27.02.2017 and 03.10.2018 in respect of ESA (Ecologically Sensitive Area) of Western Ghats
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA033.69% of total study area is under forest scattered around the project site Reserved Forest in Dhatav Village is 1.4 Km from project site.
(2.)Archaeological SitesNA0There are no archealogical sites within 10 km from project site
(3.)Defence InstallationsNA0There are no any defence installations within 10 km from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Guar, Sloth Bear, Leopard, Tiger
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 5000000
(iii)Period of Implementation 3 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kundalika River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 330
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.14296
(b)Percentage of Total Project Area 33.36
(c)No. of Plants to be Planted 2286
(d)Funds Allocated for Plantation 3500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. Augmentation of proposed green belt in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the
(2.)Financial1.The community that resides in the nearby areas will be benefited directly or indirectly by this project 2. After establishment, the industry will meet the national interest of economical growth thro
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0135
(ii)Name of the EIA Consultant Equinox Environments (I) Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1.160 ā€˜Eā€™ ward, Opp. Kamala College, Sykes Extension, Kolhapur
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 10 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMr Shirish Sirjoshi
DesignationSenior Vice President
Name of Company (Applicant Name should not be given here)ION EXCHANGE INDIA LIMITED
AddressIon House, Dr. E. Moses Road, Mahalaxmi, Mumbai
Print