1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Sanitary Landfill At Tehsil Joshimath, Chamoli District, Uttarakhand | (b)Name of the Company / Organisation | NAGAR PALIKA PARISHAD JOSHIMATH | (c)Registered Address | Nagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443,,Chamoli,Uttarakhand-246443 | (d)Legal Status of the Company | State Government | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | S P Notiyal | (b)Designation (Owner/ Partner/ CEO) | Adhishashi Adhikari | (c)Address | Nagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443,Chamoli,Uttarakhand-246443 | (d)Pin code | 246443 | (e)E-mail | dt.amaltas@gmail.com | (f)Telephone No. | 0- | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/UK/MIS/61760/2021 | (e)Master Proposal Number(Single Window) | SW/252493/2022 | (f)EAC concerned (for category A Projects only) | INFRA-2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 5488 | (b)Pincode | 246443 | (c)Bounded Latitudes (North) | | From | | Degree | 30 | Minutes | 33 | Second | 35.81 | From | | Degree | 30 | Minutes | 33 | Second | 34.39 | (d)Bounded Longitudes (East) | | From | | Degree | 79 | Minutes | 34 | Second | 18.67 | From | | Degree | 79 | Minutes | 34 | Second | 18.76 | (e)Survey of India Topo Sheet No. | H44H7, H44H6,H44H11 and H44H10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 2458 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttarakhand | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Uttarakhand | Chamoli | Joshimath | Vishnu Prayag | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | | (c)Date of Apply of TOR | 12 Mar 2021 | (d)Date of Issue of TOR / Standard ToR | 31 Mar 2021 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 03 Dec 2021 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At project premise in Teshsil - Joshimath, Distt. - Chamoli, Uttarakhand | State : | Uttarakhand | District : | Chamoli | Tehsil : | Joshimath | Village : | Vishnu Prayag |
| 23 | Employment opportunities should be provided to local people and What are the mitigation measures taken for the air pollution | District Magistrate | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Sanitary Landfill | 8.9 MTPD | proposed | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sanitary Landfill | 8.9 | Others | MTPD | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 1.94 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 36 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.039 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 12.5 | (e) Funds Allocated for Environment Management Capital(%) | 1855.67 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 8.9 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 8.9 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Municipal Solid Waste | 8.9 | Others | MTPD | Waste generation from Chamoli district | Road | | 5 | Others | Concession Agreement | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Mar 2021 To 31 May 2021 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 93.8 | 55 | 89.9 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 49.9 | 28 | 49.6 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 9.5 | 2 | 9.4 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 27.4 | 10.1 | 26.5 | 80 | (5.) | Others | CO | Mili Gram per Meter Cube | 1.2 | 0.1 | 1.2 | 4 | |
14.2. No. of Ground Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | Arsenic | mg/l | | 0.001 | 0.0001 | 0.01 | 0.01 | (2.) | pH | | | NA | | 7.35 | 7.22 | 6.5 | 8.5 | (3.) | TDS | | | mg/l | | 166 | 112 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 84 | 40 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 42 | 22.5 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.35 | 0.24 | 1 | 1.5 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water Monitoring Locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.32 | 7.12 | C | (2.) | COD | | mg/l | | 4 | 4 | C | (3.) | DO | | mg/l | | 7.4 | 7.1 | C | (4.) | BOD | | mg/l | | 0.01 | 0.001 | C | |
14.4. No. of Ambient Noise Monitoring Locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.9 | 37.1 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.8 | 51.3 | 55 | |
14.5. No. of Soil Sample Monitored Locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.87 | 6.67 | (2.) | Electric Conductivity | Others | µmhos/cm | 164 | 112 | (3.) | N(Nitrogen) | Kilogram per hectare | | 782.6 | 524.4 | (4.) | P(Phosphorus) | Kilogram per hectare | | 164.4 | 124.5 | (5.) | K(Potassium) | Kilogram per hectare | | 173.5 | 133.5 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.02 To 55.90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 60.75 To 9.06 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Uttarakhand Jal Sansthan Joshimath | 4 | 5 | Not Appliacble | modeOthers | Road | Others | Tanker | 00 | 21 Jan 2022 | 4 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Leachate generation | 0 | 0 | 0 | Reuse within the Plant & Recycling | | 00 | | |
|
16.1. | (a)Total Waste Water Generation | 0 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 3249 | Tons | 0 | Road | | Others | composting, RDF & landfill facility | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 93.8 | 100 | 1.2 | 95 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 49.9 | 100 | 1.11 | 51.01 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 9.5 | 100 | 0.43 | 9.93 | 80 | (4.) | NOx | | Microgram per Meter Cube | 27.4 | 100 | 4.35 | 31.75 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 1.2 | 100 | 0 | 1.2 | 4 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 30 | 0 | NOx | | 0.0001 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 19 | (b)Source | UPCL Joshimath | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 5 kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 0 | (c)Government Land | 0.201 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 0.201 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 4585.92 | (b)Waste/Barren Land | 2834.51 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 458.47 | (e)Settlements | 11322.61 | (f)Industrial | 0 | (g)Forest | 4968.85 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Snow | 7401.69 | Total | 31572.05 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Area for Solid Waste Management | | 0.201 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESZs | 0 | 0 | 0 | (2.) | Corridors | 0 | 0 | 0 | (3.) | Wildlife Corridors | 0 | 0 | 0 | (4.) | Critically Polluted Area | 0 | 0 | 0 | (5.) | WLS | 0 | 0 | 0 | (6.) | NPA | 0 | 0 | 0 | (7.) | ESAs | Reserve forests and Rivers | 0.5 | . | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | 0 | 0 | 0 | (2.) | Forest | | JOSHIMATH RF | 2.1 | in SW direction | (3.) | Defence Installations | | 0 | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.201 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Small clawed otter, Jungle cat, Sloth bear, Leopard, Asiatic Black bear, | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Alaknanda River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0.35 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 5 | (b)Permanent Employment-During Operation | 7 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 12 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 0.0576 | (b)Percentage of Total Project Area | 28.66 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 1000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | No open dumping of waste will be carried out, which leads to soil, water & air pollution. Also littering waste is ground for breeding mosquitoes, which become agents of various deadly diseases. This p | (2.) | Social | Project will generate both direct & indirect employment | (3.) | Financial | generate revenue | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | Capacity | . | (b)No. of Recharge Pits | . | Capacity | . | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 0 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1821/RA 0141 | (ii)Name of the EIA Consultant | Amaltas Enviro Industrial Consultants LLP | (iii)Address | 2925-Basement, Sector-46, Gurugram-122003, Haryana | (iv)Mobile No. | 9899531153 | (v)Landline No. | 0124418153 | (vi)Email Id | amaltascon@gmail.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 05 Apr 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 28/12/2022 | Provide valid certificate of accredited consultant. | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | S P Notiyal | Designation | Adhishashi Adhikari | Name of Company (Applicant Name should not be given here) | NAGAR PALIKA PARISHAD JOSHIMATH | Address | Nagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443 |
|