Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sanitary Landfill At Tehsil Joshimath, Chamoli District, Uttarakhand
(b)Name of the Company / Organisation NAGAR PALIKA PARISHAD JOSHIMATH
(c)Registered Address Nagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443,,Chamoli,Uttarakhand-246443
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant S P Notiyal
(b)Designation (Owner/ Partner/ CEO) Adhishashi Adhikari
(c)Address Nagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443,Chamoli,Uttarakhand-246443
(d)Pin code 246443
(e)E-mail dt.amaltas@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UK/MIS/61760/2021
(e)Master Proposal Number(Single Window) SW/252493/2022
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 5488
(b)Pincode 246443
(c)Bounded Latitudes (North)
From
Degree 30
Minutes 33
Second 35.81
From
Degree 30
Minutes 33
Second 34.39
(d)Bounded Longitudes (East)
From
Degree 79
Minutes 34
Second 18.67
From
Degree 79
Minutes 34
Second 18.76
(e)Survey of India Topo Sheet No. H44H7, H44H6,H44H11 and H44H10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 2458
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandChamoliJoshimathVishnu Prayag
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number
(c)Date of Apply of TOR 12 Mar 2021
(d)Date of Issue of TOR / Standard ToR 31 Mar 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Nov 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :03 Dec 2021
Distance of Public Hearing Venue from the Proposed Project :0
At project premise in Teshsil - Joshimath, Distt. - Chamoli, Uttarakhand
State :Uttarakhand
District :Chamoli
Tehsil :Joshimath
Village :Vishnu Prayag
23Employment opportunities should be provided to local people and What are the mitigation measures taken for the air pollutionDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Sanitary Landfill8.9 MTPDproposed
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sanitary Landfill8.9OthersMTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1.94
(b) Funds Allocated for Environment Management (Capital) (in crores) 36
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.039
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 12.5
(e) Funds Allocated for Environment Management Capital(%) 1855.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 8.9
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 8.9
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Municipal Solid Waste8.9OthersMTPDWaste generation from Chamoli districtRoad5 OthersConcession AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Mar 2021 To 31 May 2021
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube93.85589.9100
(2.)PM2.5Micro Gram per Meter Cube49.92849.660
(3.)SO2Micro Gram per Meter Cube9.529.480
(4.)NOxMicro Gram per Meter Cube27.410.126.580
(5.)OthersCOMili Gram per Meter Cube1.20.11.24
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsArsenicmg/l0.0010.00010.010.01
(2.)pHNA7.357.226.58.5
(3.)TDSmg/l1661125002000
(4.)Total Hardnessmg/l8440200600
(5.)Chloridesmg/l4222.52501000
(6.)Fluoridemg/l0.350.2411.5
(7.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.327.12C
(2.)CODmg/l44C
(3.)DOmg/l7.47.1C
(4.)BODmg/l0.010.001C
    14.4.     No. of Ambient Noise Monitoring Locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.937.145
(2.)Leq(Day)A-weighted decibels(dB(A))54.851.355
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.876.67
(2.)Electric ConductivityOthersµmhos/cm164112
(3.)N(Nitrogen)Kilogram per hectare782.6524.4
(4.)P(Phosphorus)Kilogram per hectare164.4124.5
(5.)K(Potassium)Kilogram per hectare173.5133.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.02 To 55.90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 60.75 To 9.06
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersUttarakhand Jal Sansthan Joshimath45 Not Appliacble modeOthersRoadOthersTanker0021 Jan 20224
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Leachate generation000Reuse within the Plant & Recycling00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste3249Tons0RoadOtherscomposting, RDF & landfill facility
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube93.81001.295100
(2.)PM2.5Microgram per Meter Cube49.91001.1151.0160
(3.)SO2Microgram per Meter Cube9.51000.439.9380
(4.)NOxMicrogram per Meter Cube27.41004.3531.7580
(5.)Others(Specify)COMicrogram per Meter Cube1.210001.24
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel300NOx0.0001
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 19
(b)Source UPCL Joshimath
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 5 kVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 0.201
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.201
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 4585.92
(b)Waste/Barren Land 2834.51
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 458.47
(e)Settlements 11322.61
(f)Industrial 0
(g)Forest 4968.85
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Snow 7401.69
    Total 31572.05
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Area for Solid Waste Management0.201
Total 0.201
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZs000
(2.)Corridors000
(3.)Wildlife Corridors000
(4.)Critically Polluted Area000
(5.)WLS000
(6.)NPA000
(7.)ESAsReserve forests and Rivers0.5.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites000
(2.)ForestJOSHIMATH RF2.1in SW direction
(3.)Defence Installations000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.201
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Small clawed otter, Jungle cat, Sloth bear, Leopard, Asiatic Black bear,
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Alaknanda River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 0.35
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 7
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 12
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.0576
(b)Percentage of Total Project Area 28.66
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalNo open dumping of waste will be carried out, which leads to soil, water & air pollution. Also littering waste is ground for breeding mosquitoes, which become agents of various deadly diseases. This p
(2.)SocialProject will generate both direct & indirect employment
(3.)Financialgenerate revenue
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity .
(b)No. of Recharge Pits .
    Capacity .
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area .
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0141
(ii)Name of the EIA Consultant Amaltas Enviro Industrial Consultants LLP
(iii)Address 2925-Basement, Sector-46, Gurugram-122003, Haryana
(iv)Mobile No. 9899531153
(v)Landline No. 0124418153
(vi)Email Id amaltascon@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 05 Apr 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)28/12/2022Provide valid certificate of accredited consultant.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS P Notiyal
DesignationAdhishashi Adhikari
Name of Company (Applicant Name should not be given here)NAGAR PALIKA PARISHAD JOSHIMATH
AddressNagar Palika Parishad Joshimath, Chamoli, Uttarakhand - 246443
Print