1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Environmental Clearance for Establishment of 30 KLPD Distillery at Gat No. 165, 168A, 168C Vasant Nagar, Pargaon, Tal.: Washi, Dist.: Osmanabad, Maharashtra By Bhimashankar Sugar Mills Ltd., (BSML). | (b)Name of the Company / Organisation | BHIMASHANKAR SUGAR MILLS LTD. | (c)Registered Address | vasantnagar, Pargaon, Tal. - Washi,,Osmanabad,Maharashtra-413526 | (d)Legal Status of the Company | Others | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Nitin Satish Lodha | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | vasantnagar, Pargaon, Tal. - Washi,Osmanabad,Maharashtra-413526 | (d)Pin code | 413526 | (e)E-mail | bsmladm@gmail.com | (f)Telephone No. | 0- | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(g) Distilleries
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/MH/IND2/62118/2021 | (e)Master Proposal Number(Single Window) | SW/249475/2022 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 165, 168A, 168C | (b)Pincode | 413526 | (c)Bounded Latitudes (North) | | From | | Degree | 18 | Minutes | 68 | Second | 74.48 | From | | Degree | 75 | Minutes | 68 | Second | 11.54 | (d)Bounded Longitudes (East) | | From | | Degree | 18 | Minutes | 68 | Second | 53.52 | From | | Degree | 75 | Minutes | 68 | Second | 47.24 | (e)Survey of India Topo Sheet No. | 47 N/90, 47 N/10, 47 N/13, 47 N/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 554 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Osmanabad | Washi | Pargaon | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/MH/IND2/62118/2021 | (b)Date of Apply of TOR | 26 Mar 2021 | (c)Date of Issue of TOR / Standard ToR | 04 Jun 2021 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 18 Nov 2021 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At the Factory site - M/s. Bhimashankar Sugar Mills Ltd., Gat No.: 165, 168A, 168C Tal. - Washi, Dist. - Osmanabad, Maharashtra. | State : | Maharashtra | District : | Osmanabad | Tehsil : | Washi | Village : | Pargaon |
| 45 | Air Pollution, Water pollution, Effluent treatment etc | Others | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Distillery Plant | 30 KLPD | B Heavy Molasses, C heavy Molasses, Sugarcane juice | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ethanol/ ENA/ RS | 30 | Kilo Litre per Day | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 04 Jun 2021 | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 22.23 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 5.05 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.65 | (e) Funds Allocated for Environment Management Capital(%) | 22.72 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 30 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 30 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | C Molasses | 29970 | Tons per Annum | | Own sugar Factory & nearby sugar factory | Road | | 40 | Others | Own factory & nearby factories | Copy of Linkage | (2.) | Sugar cane juice | 24300 | Tons per Annum | | Own sugar Factory | Road | | 0 | Captive | | Copy of Linkage | (3.) | B - Heavy Molasses | 26460 | Tons per Annum | | Own sugar Factory & nearby sugar factory | Road | | 40 | Others | Own factory & nearby factories | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2021 To 31 May 2021 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 29 | 11 | 28.54 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 78 | 41 | 77.54 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 35 | 11 | 35 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 2.9 | 0.5 | 2.87 | 4 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 36 | 18 | 36 | 60 | |
14.2. No. of Ground Water Monitoring Locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Fluoride | | | mg/l | | 0.8 | 0.4 | 1.5 | 1.5 | (2.) | pH | | | NA | | 7.8 | 7.3 | 7 | 7 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | TDS | | | mg/l | | 628 | 524 | 500 | 500 | (5.) | Total Hardness | | | mg/l | | 432 | 336 | 200 | 200 | (6.) | Heavy Metals | | Boron | mg/l | | 0.4 | 0.2 | 0 | 0 | (7.) | Chlorides | | | mg/l | | 94 | 67 | 250 | 250 | |
14.3. No. of Surface Water Monitoring Locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.8 | 7.3 | E | (2.) | DO | | mg/l | | 5.9 | 5.5 | E | (3.) | BOD | | mg/l | | 2.70 | 0 | E | (4.) | COD | | mg/l | | 16 | 2 | E | |
14.4. No. of Ambient Noise Monitoring Locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 62.2 | 38.96 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.17 | 47.20 | 75 | |
14.5. No. of Soil Sample Monitored Locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.7 | 7 | (2.) | N(Nitrogen) | Kilogram per hectare | | 181 | 115 | (3.) | P(Phosphorus) | Kilogram per hectare | | 77 | 47 | (4.) | K(Potassium) | Kilogram per hectare | | 269 | 234 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.2 | 0.13 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 17.35 To 4.15 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 20 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 253 | 1.4 | Copy of Permission Letter | Pipeline | | Jack Well | | 214/1318/MH/IND/2017 | 07 Sep 2017 | 182 | (2.) | Surface | | 253 | 27 | Copy of Permission Letter | Pipeline | | Jack Well | | 2472/15 | 10 Jun 2015 | 176 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial (Distillery - Other) | 72 | 72 | Treated in Proposed Condensate Polishing Unit (CPU) & reused | Others | Used for dilution of molasses | 72 | 0 | (2.) | Domestic | 8 | 10 | Septic Tank | Others | -- | 8 | 0 | (3.) | Industrial (Distillery - Spentwash) | 240 | 0 | Biomethanation – MEE concentration- biocomposting | Others | Bio-composting | 240 | 0 | |
|
16.1. | (a)Total Waste Water Generation | 320 | (b)Total Discharged Water | 0 | (c)Total Reused Water | 320 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Yeast Sludge | Industrial Waste | | 2 | Tons | 0 | Others | - | Others | Used for biocomposting | (2.) | CPU Sludge | Industrial Waste | | 2 | Tons | 0 | Others | - | Others | Used for biocomposting | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 78 | 2.1 | 0.73 | 78.73 | 100 | (2.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0 | 0 | (3.) | SO2 | | Microgram per Meter Cube | 29 | 2 | 6.2 | 35.2 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 36 | 2.1 | 0.68 | 36.68 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Existing Boiler - 20 TPH | Bagasse | 45 | 1.8 | PM10,SO2,NOx ,PM2.5 | | 150 | (2.) | Existing Boiler - 45 TPH | Bagasse | 51 | 2 | PM10,SO2,NOx ,PM2.5 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 665 | (b)Source | Own Co-gen Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 DG sets of capacity 100 KVA & 500 KVA Capacity | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 0 | (b)Private Land | 11.58 | (c)Government Land | 0 | (d)Revenue Land | 0 | (e)Other Land | 0 | Total Land | 11.58 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 13353.6 | (b)Waste/Barren Land | 0 | (c)Grazing/ Community Land | 0 | (d)Surface Water Bodies | 566.6 | (e)Settlements | 1849.2 | (f)Industrial | 0 | (g)Forest | 428.9 | (h)Mangroves | 0 | (i)Marine Area | 0 | (j)Others : Follow Land, Harvested Land, Open Land | 15217.3 | Total | 31415.6 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Built Up Area | | 5.37 | | (2.) | Green belt | | 3.93 | | (3.) | Others | Open Space | 2.28 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | None | 0 | None | (2.) | ESZs | None | 0 | None | (3.) | Critically Polluted Area | Not Any | 0 | Not Any | (4.) | Wildlife Corridors | None | 0 | None | (5.) | ESAs | None | 0 | None | (6.) | WLS | None | 0 | None | (7.) | NPA | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None | 0 | None | (2.) | Archaeological Sites | | None | 0 | None | (3.) | Forest | | Not any | 0 | Non | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in Rs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Manjara River | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Manjra River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 2.07 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 270 | (f)Total Manpower | 100 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 3.93 | (b)Percentage of Total Project Area | 33.94 | (c)No. of Plants to be Planted | 1200 | (d)Funds Allocated for Plantation | 5000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The community that resides in the nearby areas will be benefited directly or indirectly by this project | (2.) | Environmental | 1. Augmentation of existing green belt in the industrial area and its surrounding shall help in improving the aesthetic beauty of the surrounding environment giving a pleasant look and improvising the | (3.) | Social | 1. Upliftment of local peoples 2. Improvement in the Physical & Social Infrastructure 3.Employment generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/RA0194 | (ii)Name of the EIA Consultant | Ultra-Tech Environment consultancy & Laboratory | (iii)Address | Unit Nos. 224, 225 & 226 Jai Commercial Complex Eastern Express Highway, Opp. Cadbury Factory, Khopat, Thane 400 601, MH | (iv)Mobile No. | 8600017759 | (v)Landline No. | 0222534277 | (vi)Email Id | eiapune@ultratech.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 09 Mar 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
NO Record | |
Additional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
(1.) | 19/07/2022 | please submit compliance as per minutes | | (2.) | 22/08/2022 | Submission of Compliance towards points raised in 224th SEAC-1 meeting held on 12th July 2022 of Environmental Clearance for proposed 30 KLPD distillery project at Gat No. 165, 168A, 168C Vasant Nagar, Pargaon, Tal.: Washi, Dist.: Osmanabad by M/s Bhimashankar Sugar Mills Ltd. (BSML). | ADS Letter | (3.) | 14/12/2022 | please submit compliance as per minutes | | (4.) | 16/08/2023 | Compliance submitted | ADS Letter | (5.) | 30/11/2023 | Submit compliance as per SEIAA 267 Day 1 Part C Sr. No.40 mom | | (6.) | 01/02/2024 | Reply towards ADS raised in 267th SEIAA meeting held on 17.10.2023.
Kindly consider our case in Upcoming SEIAA meeting for grant of EC. | ADS Letter | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Nitin Satish Lodha | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | BHIMASHANKAR SUGAR MILLS LTD. | Address | vasantnagar, Pargaon, Tal. - Washi |
|