Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name M/s. Krishang Pharma Private Limited Company/Organisation Name KRISHANG PHARMA PRIVATE LIMITED
Registered Address Land survey no:507/1, Nokha Talav, Village: Ode, Ta: Anand, Gujarat. Gujarat 388210 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant VIJAY RAMESHBHAI MAKVANA
(b)Designation (Owner/ Partner/ CEO) Technical Director
(c)Address Land survey no:507/1, Nokha Talav, Village: Ode, Ta: Anand, Gujarat.,,,Anand,Gujarat-388210
(d)Pin code 388210
(e)E-mail director@krishangpharma.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f)-API
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/GJ/IND3/247329/2021
(e)Master Proposal Number(Single Window) SW/247327/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAnandAnandOde
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Land Survey No: 507/1, Village: Ode, Ta & District: Anand, Gujarat - 388210
Town / Village
(Name of more than one town may be entered by separating with)
Ode Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
Land Survey No: 507/1
State Gujarat District Anand
Tehshil Anand Pincode 388210
Nearest railway station OD railway station Distance from the project site 5.29
Nearest airport Vadodara Airport Distance from the project site 33.51
Nearest Town/City/District Headquarters Anand Distance from the project site 18
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Ode Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 3720.78 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) Yes Plain land will change to constructed land.The unit will be situated at private industrial area. And this land use pattern already made for industrial purpose.
1.2 Clearance of existing land, vegetation and buildings? No Not applicable
1.3 Creation of new land uses? No Plain land will get converted to constructed land
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Required soil testing and other investigation will be carried out before starting construction activities.
1.5 Construction works? Yes The Proposed Project is a New Unit; Hence, Construction Activity will be Carried out in Later Stage After Obtaining all the Necessary Permission from Authorised Body.
1.6 Demolition works? No Land already developed for Industrial purpose.
1.7 Temporary sites used for construction works or housing of construction workers? No No, Housing will not be required. Workers will come from nearby villages.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes It will be as per the plant design and building above ground level.
1.9 Underground works including mining or tunneling? No No underground work will be carried out.
1.10 Reclamation works? No No reclamation work will be carried out.
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing processes? Yes Production details and manufacturing details uploaded as part of Pre Feasibility Report.
1.14 Facilities for storage of goods or materials? Yes Raw materials & finished products will be stored in covered designated area
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Water balance diagram is given in Pre-Feasibility Report. Waste water will be treated in ETP having primary, secondary, tertiary treatment facility and for further treatment in MEE and treated water will be reused within premises.
1.16 Facilities for long term housing of operational workers? No The workers will come from nearby local area and hence such facilities will not be required.
1.17 New road, rail or sea traffic during construction or operation? No During operation phase, traffic might momentary increase. However; existing transport routes are adequate for the proposed momentary increase in traffic.
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No No new roads and rail are envisaged.
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No No closure or diversion of existing routes is required.
1.20 New or diverted transmission lines or pipelines? No Not applicable
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No any changes to the hydrology of watercourses will be caused.
1.22 Stream crossings? No Not applicable
1.23 Abstraction or transfers of water from ground or surface waters? No Water requirement will be fulfilled by Borewell. CGWA permission will be obtained.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? No Surrounding water bodies and land use is not affected due to water consumption. Water requirement will be fulfilled by Borewell. CGWA permission will be obtained.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes Temporary during the construction phase and permanent after commissioning of the plant.
1.26 Long-term dismantling or decommissioning or restoration works? No No dismantling or decommissioning works are required to carry out. Therefore, land use will not be impacted.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No Not Applicable
1.28 Influx of people to an area in either temporarily or permanently? Yes Temporarily during construction phase and permanent during operational phase.
1.29 Introduction of alien species? No Not Applicable
1.30 Loss of native species or genetic diversity? No Not Applicable
1.31 Any other actions? No No additional actions will be implemented.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) Yes 8639.45 sq.m Non Agricultural land to be utilised for this project.
2.2 Water (expected source & competing users) unit: KLD Yes 105 KLD = (65 F + 40 R) KLD water From Borewell
2.3 Minerals (MT) No Not applicable
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes Stone, aggregates and other construction material will be used as per requirement for construction work.
2.5 Forests and timber (source – MT) Yes No forest products will be used. Timber will be used for office furniture only.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes 12500 KVA; to be procured from MGVCL. Briquettes: 15 TPD for Boiler Diesel: 100 Lit/day
2.7 Any other natural resources (use appropriate standard units) No Not applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes Some of the raw materials are hazardous. Hence, due care will be taken for handling them. Some of hazardous will be stored in tank, other will be in drum, barrels, HDPE bags, carboys etc.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Not applicable
3.3 Affect the welfare of people e.g. by changing living conditions? No Living condition of local people may improve through direct and indirect employment for this proposed project.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Not applicable
3.5 Any other causes No Not applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No Not Applicable
4.2 Municipal waste (domestic and or commercial wastes) Yes It will be managed as per prevailing norms
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes All hazardous waste to be managed as per the applicable governing laws. Details given in PFR
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes To be managed as per the applicable governing laws. The company will obtain authorisation of TSDF and shall dispose all the waste as per the Hazardous Waste (Management, Handling and Trans Boundary Movement) Rules. The possibility of sewage sludge to be used as manure shall be checked out.
4.7 Construction or demolition wastes No Construction wastes will be inert in nature and will be collected and utilized in filling of low-lying areas within the unit. No demolition work will be carried out for the proposed manufacturing unit. Therefore, no demolition waste will be generated.
4.8 Redundant machinery or equipment No Not applicable
4.9 Contaminated soils or other materials No Not applicable
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No The details given in hazardous and/or solid waste management rules.
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes As per Given in PFR
5.2 Emissions from production processes Yes As per Given in PFR
5.3 Emissions from materials handling including storage or transport Yes Fugitive emissions during material handling will be managed by good manufacturing practices.
5.4 Emissions from construction activities including plant and equipment Yes Fugitive dust emission during the construction of project site.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes There will be generation of particulate matters due to construction activities. However, care will be taken to make it minimum. Plant manufacturing area will be kept neat and clean. All the reactions willbe carried out in closed vessels. Therefore, no odour will be generated.
5.6 Emissions from incineration of waste No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Not applicable
5.8 Emissions from any other sources No There will not be any emission from any other sources.
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes There might be generation of noise due to operation of various equipments/ machineries. Adequate sound enclosures are provided to all the equipments and machineries generating high noise & ear protecting devices are provided to the workers working in such areas where noise levels is high.
6.2 From industrial or similar processes Yes Noise level from different sources of the plant will be within the stipulated norms as adequate sound enclosures will be provided to all the equipments and machineries generating high noise.
6.3 From construction or demolition Yes Noise generated from the construction activities will be within tolerable limits. No demolition work willbecarriedoutfortheproposedunit. Therefore, no noise will be generated due to demolition.
6.4 From blasting or piling No Not applicable
6.5 From construction or operational traffic Yes There will be momentary increase in the noise level due to traffic during operational phase.
6.6 From lighting or cooling systems No Not applicable
6.7 From any other sources No Not applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials Yes Proper care for handling of hazardous materials will be taken as per the MSIHC rules & HW management Rules.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes Domestic sewage will be treated in STP and reused for plantation within premises. Effluent will be treated in conventional ETP and treated water sent to MEE and treated water reused within premises.
7.3 By deposition of pollutants emitted to air into the land or into water No Stack of appropriate heightwill be installed for flue gas emission.
7.4 From any other sources No Not applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No All EMS components shall run round the clock; and in case of failure of any of the system there will be safe storage arrangement, which will help for safe storage of waste/effluent. In case of extreme emergency plant will be closed till the system gets operational.
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes Due care shall be taken to prevent any disaster. Safety would be taken utmost care during operational stage. Training shall be imparted to workers for health and safety aspects of chemical handling.
8.2 From any other causes No Not applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes Such disasters are out of human control.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
No Not applicable as road, electricity, water supply and underground drainage system for disposal of wastewater is already developed in this area.
9.2 Lead to after-use of the site, which could have an impact on the environment No Not applicable
9.3 Set a precedent for later developments No Not applicable
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
No Not applicable as there are no such areas in the vicinity of 15 km.
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests No Not applicable
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration No Not applicable
4 Inland, coastal, marine or underground waters No Not applicable
5 State, National boundaries No Not applicable as there are no such areas near the vicinity of 15 km.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas No Not Applicable
7 Defence installations No Not Applicable
8 Densely populated or built-up area Yes This area is surrounded by many industrial units.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes The site is surrounded by many such areas.
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) No Not Applicable
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No None within 15 km area
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects No No such hazard identified so far
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)12/01/2022Pl. submit status of previous unit along with satelite image of proposed plot considering periphery of 500 meter. 2. Pl. submit old unit CCA of GPCB status and other legal court case and bank defaulter status of unit
(2.)21/01/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVIJAY RAMESHBHAI MAKVANA
DesignationTechnical Director
Name of Company (Applicant Name should not be given here)KRISHANG PHARMA PRIVATE LIMITED
AddressLand survey no:507/1, Nokha Talav, Village: Ode, Ta: Anand, Gujarat.