Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environment Clearance of Proposed Multistoried Residential Building “Assotech Pride Phase-1 Extension” of M/s Assotech Sun Growth Abode LLP at Mouza- Rudrapur, Bhubaneswar, Dist- Khurda, Odisha
(b)Name of the Company / Organisation ASSOTECH SUN GROWTH ABODE LLP
(c)Registered Address Flat No. 203, 2nd Floor, Plot No. F-15, BJB Nagar, Bhubaneswar,,Khordha,Orissa-751014
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sashank Sekhar Rout
(b)Designation (Owner/ Partner/ CEO) Vice President
(c)Address Assotech Pride, Plot No. 274, NH-16, Rudrapur, Bhubaneswar, Odisha,,Khordha,Khordha,Orissa-752101
(d)Pin code 752101
(e)E-mail sbmishra1979@gmail.com
(f)Telephone No. 120-4802222
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/OR/MIS/64021/2021
(e)Master Proposal Number(Single Window) SW/247175/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 274
(b)Pincode 752101
(c)Bounded Latitudes (North)
From
Degree 20
Minutes 19
Second 40.2
From
Degree 85
Minutes 53
Second 8.4
(d)Bounded Longitudes (East)
From
Degree 20
Minutes 19
Second 37.7
From
Degree 85
Minutes 53
Second 5.2
(e)Survey of India Topo Sheet No. 73H/15, 73H/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 120
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 16
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)OrissaKhordhaBhubaneswarRudrapur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 64021/45-MIS/06-2021
(c)Date of Apply of TOR 28 Jul 2021
(d)Date of Issue of TOR / Standard ToR 01 Jan 1900
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing is not required for Building & Cons
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Multistoried Apartment350733.31 sqmNA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Multistoried Residential Building “Assotech Pride Phase-1 Extension”350733.31OtherssqmRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 392
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.6
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.26
(e) Funds Allocated for Environment Management Capital(%) 0.66
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6444652
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6444652
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FLY ASH BRICKS6194381OthersNosOpen MarketRoad20 Open MarketCopy of Linkage
(2.)Cement215319OthersBagsOpen MarketRoad10 Open MarketCopy of Linkage
(3.)Chips7625OtherscumOpen MarketRoad25 Open MarketCopy of Linkage
(4.)Steel1456OthersTonOpen MarketRoad12 Open MarketCopy of Linkage
(5.)Sand25871OtherscumOpen MarketRoad13 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube39.832.539.760
(2.)SO2Micro Gram per Meter Cube14.911.114.880
(3.)NOxMicro Gram per Meter Cube26.421.725.580
(4.)PM10Micro Gram per Meter Cube71.463.668.9100
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l12698200600
(2.)TSSmg/l0000
(3.)Chloridesmg/l66552501000
(4.)Fluoridemg/l0.320.0211.5
(5.)pHNA7.156.76.58.5
(6.)TDSmg/l192.9178.35002000
(7.)Heavy MetalsIronmg/l0.170.090.30.3
    14.3.     No. of Surface Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.75.6C
(2.)BODmg/l2.82.2C
(3.)CODmg/l00C
(4.)pHNA7.526.67C
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.741.645
(2.)Leq(Day)A-weighted decibels(dB(A))54.550.655
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram2.341.72
(2.)K(Potassium)Milligram per Kilogram32.5817.95
(3.)pH7.226.57
(4.)N(Nitrogen)Milligram per Kilogram193.6173.4
(5.)Electric ConductivityMillisiemens per Centimetre18789
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.1 To 6.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.25 To 2.2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater792.80Copy of Permission LettermodeOthersBorewellOthersBorewellCGWA/NOC/INF/ORIG/2020/762006 Mar 2020829
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Waste10171050Sewage Treatment PlantReuse within the Plant & Recycling1017
16.1.
(a)Total Waste Water Generation 1017
(b)Total Discharged Water 0
(c)Total Reused Water 1017
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste1533Tons1RoadOthersAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube71.410.0771.47100
(2.)PM2.5Microgram per Meter Cube00000
(3.)SO2Microgram per Meter Cube14.910.1215.0280
(4.)NOxMicrogram per Meter Cube26.410.1826.4880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD701.5PM100.07
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 7460
(b)Source TPCODL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 6000 KVA
(e)Stack Height (in m) 50
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 6.725
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 6.725
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 212.05
(b)Waste/Barren Land 38.29
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 1.65
(e)Settlements 23.92
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Other Land 196.7
    Total 472.61
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersBuilding6.725
Total 6.725
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)Critically Polluted AreaNA0NA
(3.)WLSNA0NA
(4.)ESZsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)ESAsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.752
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kuakhai River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 150
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 350
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 520
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 2.36
(b)Percentage of Total Project Area 35.09
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 3000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt Development all around the project boundary
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 45
(b)Total No. of Flats to be Build 1752
(c)No. of Buildings 11
(d)Total plot area (sqm) 67259
(e)Total built up area (sqm) 350733.31
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
    Capacity 30
(b)No. of Recharge Pits 23
    Capacity 31.4
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2 & 4 Wheeler Parking
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 7.5
(c)Quantity 560
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0157
(ii)Name of the EIA Consultant ENVIRO INFRA SOLUTIONS PVT. LTD.
(iii)Address 301,302 & 305, SRBC, SECTOR-9, VASUNDHARA, GHAZIABAD
(iv)Mobile No. 9818922344
(v)Landline No. 0120415118
(vi)Email Id eis@enviroinfrasolutions.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 13 Nov 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSashank Sekhar Rout
DesignationVice President
Name of Company (Applicant Name should not be given here)ASSOTECH SUN GROWTH ABODE LLP
AddressFlat No. 203, 2nd Floor, Plot No. F-15, BJB Nagar, Bhubaneswar