Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mangalam Chemicals Pvt. Ltd.
(b)Name of the Company / Organisation MANGLAM CHEMICALS PRIVATE LIMITED
(c)Registered Address Plot No. R-3&4, Paraskhera Industrial Area, UPSIDC, Bareilly-243502,,Bareilly,Uttar Pradesh-243502
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sushil Agarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. R-3&4, Paraskhera Industrial Area, UPSIDC, Bareilly-243502,Bareilly,Uttar Pradesh-243001
(d)Pin code 243001
(e)E-mail mangalamchemicals42@gmail.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(c)Category B1
(d)Proposal Number SIA/UP/IND3/70349/2021
(e)Master Proposal Number(Single Window) SW/246309/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 3
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. R-3 & 4 ( 1 Project)
(b)Pincode 243002
(c)Bounded Latitudes (North)
From
Degree 28
Minutes 25
Second 37.84
From
Degree 28
Minutes 25
Second 40.52
(d)Bounded Longitudes (East)
From
Degree 79
Minutes 21
Second 50.27
From
Degree 79
Minutes 21
Second 53.81
(e)Survey of India Topo Sheet No. 53 P/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 202
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 60
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshBareillyBareillyParsakhera Industrial Area, UPSIDC, Bareilly
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 0
(b)Date of Apply of EC 20 Dec 2021
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is Under UPSIDC Industrial Area of Bareill
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. NA
(iv)Status of Compliance Non Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Manufacturing of Formaldehyde54005400059400Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Reactor112
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 Mar 2020
(iv)Valid Upto 31 Dec 2021
(v)File No. 76114/UPPCB/Bareilly(UPPCBRO)/CTO/water/B AREILLY/
(vi)Application No. 6698203
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 2.12
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.30
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.042
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.05
(e) Funds Allocated for Environment Management Capital(%) 14.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 27000
(b)Existing quantity of raw material/fuel 2700
(c)Total quantity of raw material/fuel 29700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methanol29700Tons per AnnumSupplier, Kandla PortRoad1370 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2021 To 31 May 2021
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube140.5878.03137.768100
(2.)PM2.5Micro Gram per Meter Cube80.1437.3178.53760
(3.)NOxMicro Gram per Meter Cube37.1818.2436.436480
(4.)OthersCOMicro Gram per Meter Cube1.130.521.10744.0
(5.)SO2Micro Gram per Meter Cube22.379.0821.922680
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.717.516.58.5
(2.)TDSmg/l5302885002000
(3.)Total Hardnessmg/l220176200600
(4.)Chloridesmg/l132.0915.652501000
(5.)OthersFree Residual Chlorinemg/l0.10.10.21
(6.)TSSmg/l0030100
(7.)Fluoridemg/l0.630.1511.5
(8.)Heavy MetalsIronmg/l0.290.100.30
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.697.49C
(2.)OthersTDSmg/l378283C
(3.)BODmg/l6.504.0C
(4.)CODmg/l24.020.0C
(5.)DOmg/l7.27.2C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.650.875
(2.)Leq(Night)A-weighted decibels(dB(A))55.038.770
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.886.89
(2.)K(Potassium)Milligram per Kilogram307.30138.77
(3.)Electric ConductivityMillisiemens per Centimetre874.6412.8
(4.)P(Phosphorus)Milligram per Kilogram96.5352.10
(5.)N(Nitrogen)Percent0.0860.066
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.45 To 4.49
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.39 To 3.19
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2500Copy of Permission LetterPipelineTube WellBRLY0122NIN006416 Mar 2022150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water0.50.5Disposed through Soak PitOthersSoak Pit0.00.5
16.1.
(a)Total Waste Water Generation 0.5
(b)Total Discharged Water 0.5
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.01Tons120RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube00000
(2.)NOxMicrogram per Meter Cube00000
(3.)PM2.5Microgram per Meter Cube00000
(4.)SO2Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG StackHSD60.20SO213.95
(2.)DG StackHSD60.20PM1011.37
(3.)BoilerHSD200.30SO20.56
(4.)BoilerHSD200.30NOx1.31
(5.)BoilerHSD200.30PM100.11
(6.)DG SetHSD60.20NOx5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 312
(b)Source Uttar Pradesh Power Corporation Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 DG sets capacity 160 KVA and 240 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land 0.00
(b)Private Land 0.3560
(c)Government Land 0.00
(d)Revenue Land 0.00
(e)Other Land 0.00
    Total Land 0.3560
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 28342.55
(b)Waste/Barren Land 5.47
(c)Grazing/ Community Land 126.93
(d)Surface Water Bodies 22.83
(e)Settlements 1673.92
(f)Industrial 808.19
(g)Forest 290.40
(h)Mangroves 129.61
(i)Marine Area 0
(j)Others : Bareland 5.47
    Total 31405.370000000006
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.1350
(2.)OthersRoad, Parking, Open area0.0967
(3.)Green belt0.1250
Total 0.3567
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)Wildlife CorridorsNA00
(3.)WLSNA00
(4.)NPANA00
(5.)ESAsNA00
(6.)ESZsNA00
(7.)CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00000000000NA
(2.)Archaeological SitesNA100NA
(3.)Defence InstallationsNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is private land and already acquired by propo
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 70
(b)No. of Households 19817
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Ramganga River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Shankha Drain
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 2.70
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 4
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 1
(d)Temporary Employment- During Operation 1
(e)No. of working days 365
(f)Total Manpower 11
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt125001250
(2.)Percentage of Total Project Area35.110.1135
(3.)No. of Plants32032
(4.)Funds Allocated505
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• Adopt water conservation, air pollution control techniques and pollution abatement measures to protect existing environment and ecology.
(2.)FinancialProposed project will contribute to state and national economic growth to a measurable extent.
(3.)SocialIn existing plant, 8 Nos. of person are employed and after expansion of project approximately 6 Nos. of person will be employed directly during operation phase. • All local people shall be employed as
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/RA 0224
(ii)Name of the EIA Consultant Paramarsh Servicing Environment and Development, L
(iii)Address M.S.-1/10 Sector A, Sitapur Road Yojna, Ram Ram Bank Chauraha, Aliganj, Lucknow-226024
(iv)Mobile No. 9044905077
(v)Landline No. 0522243074
(vi)Email Id paramarsh.env@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 01 May 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter NA
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSushil Agarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)MANGLAM CHEMICALS PRIVATE LIMITED
AddressPlot No. R-3&4, Paraskhera Industrial Area, UPSIDC, Bareilly-243502