Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in EC for Residential cum Commercial Project
(b)Name of the Company / Organisation M/S ESQUE FINMARK PVT. LTD.
(c)Registered Address Hira Bhavan, 112/122, Rajaram Mohan Roy Road, Prathana Samaj, Mumbai,,Mumbai City,Maharashtra-400004
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Piyush Thakkar
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address Hira Bhavan, 112/122, Rajaram Mohan Roy Road, Prathana Samaj, Mumbai,,Mumbai,Mumbai City,Maharashtra-400004
(d)Pin code 400004
(e)E-mail esquefinmark01@gmail.com
(f)Telephone No. 22-21716389
(g)Fax No. 21716389
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/MIS/69681/2019
(e)Master Proposal Number(Single Window) SW/241940/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. C.S. No. 5/124, 6/124, 7/124, 8/124, 9/124, 10/124
(b)Pincode 400033
(c)Bounded Latitudes (North)
From
Degree 18
Minutes 58
Second 00
From
Degree 18
Minutes 59
Second 00
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 50
Second 00
From
Degree 72
Minutes 51
Second 00
(e)Survey of India Topo Sheet No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 13
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraMumbai CityMumbaiParel Divison, Kalachowky
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SIA/MH/NCP/49191/2019
(b)Date of Apply of EC 31 Dec 2019
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Not Applicable for building construction project
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. -
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)FSI Area m261180.391912.0663092.45Othersm2OthersNA
(2.)Total Construction Area m2147700.017977.17155677.18000000002Othersm2OthersNA
(3.)Plot Area14148.16014148.16Othersm2OthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Reservation Bldg. (Dispensary)St (pt) + 4 FloorsRemovedRemovedRemoved
(2.)Sale building (Wing A)3B+G/S+1-4P+5th P/St+68 flrs3B+G/S+1-4P+5th P/St+6- 63 Res +SF3B+G/S+1-4P+5th P/St+6- 63 Res +SFReduction of 5 Floors and addition of on 1 service floor.
(3.)Sale building (Wing B)3B+G/S+1-4P+5th P/St+68 flrs3B+G/S+1-4P+5th P/St+6- 64 Res +SF3B+G/S+1-4P+5th P/St+6- 64 Res +SFReduction of 4 Floors and addition of on 1 service floor.
(4.)Wing C (Rehab & Sale component)Newly proposed1B+ Stilt/ Gr.(part)+ 23 upper floors1B+ Stilt/ Gr.(part)+ 23 upper floorsNewly Proposed.
(5.)Public parking lot (PPL)3B + Gr + P1 + P23 Basement + ground + Podium (P1) part floors3 Basement + ground + Podium (P1) part floorsChange in Area. Reduction of 1 Floor.
(6.)Rehab BuildingB+ Gr.+ 23rd upper floorComp(Rehab):B+G+22 floors;(Sale):B+G+22 floorsComp(Rehab):B+G+22 floors;(Sale):B+G+22 floors-
(7.)Wing D (Community hall)Newly proposedGround FloorGround FloorNewly Proposed.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 31 May 2017
(iv)Valid Upto 31 May 2018
(v)File No. 0000016859/CO/CC-1705001161
(vi)Application No. 0000016859
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 383
(b) Funds Allocated for Environment Management (Capital) (in crores) 2.7
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.52
(e) Funds Allocated for Environment Management Capital(%) 0.70
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Construction Project155677.18Othersm2This is building construction projectRoad15 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube28212880
(2.)PM10Micro Gram per Meter Cube12886122100
(3.)PM2.5Micro Gram per Meter Cube5925.5656.560
(4.)NOxMicro Gram per Meter Cube36263580
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l1721725002000
(2.)Total Hardnessmg/l185185300600
(3.)Fluoridemg/l0.050.0511.5
(4.)Heavy MetalsIronmg/l0.100.100.31
(5.)TSSmg/l12.412.400
(6.)Chloridesmg/l1121122501000
(7.)pHNA7.67.66.58.5
    14.3.     No. of Surface Water Monitoring Locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODNA00D
(2.)pHNA00D
(3.)DONA00D
(4.)BODNA00D
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))575250-55
(2.)Leq(Night)A-weighted decibels(dB(A))444140-45
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.96.9
(2.)P(Phosphorus)Milligram per Kilogram8.258.25
(3.)K(Potassium)Milligram per Kilogram274274
(4.)Electric ConductivityMillisiemens per Centimetre1.431.43
(5.)N(Nitrogen)Milligram per Kilogram8.258.25
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 2.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Water Supply (MCGM)4840Copy of Permission LetterPipelineOthersMunicipal Water Supply (MCGM)Applied18 Jul 2019484
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Residential Buildings452455STPDischarge into Surface Water Body,Reuse within the Plant & Recycling300152
16.1.
(a)Total Waste Water Generation 452
(b)Total Discharged Water 152
(c)Total Reused Water 300
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non-Biodegradable Waste (718 Kg/d)Municipal Solid Waste262Tons5RoadAuthorized Recyclers
(2.)Biodegradable Waste (1078 Kg/d)Municipal Solid Waste393Tons0OthersOnsite treatmentOthersMechanical Composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.80.5575.8100
(2.)SO2Microgram per Meter Cube20.30.5525.380
(3.)PM2.5Microgram per Meter Cube31.60.5435.660
(4.)NOxMicrogram per Meter Cube360.544080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (3280 kVA)HSD6.50.2SO27.0 ug/m3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5070
(b)Source BEST
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3280
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 1.41
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 1.41
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 1.41
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : - 0
    Total 1.41
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area1.414BUA: 155677.18 m2
Total 1.414
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo Critical polluted area within 10 km0NA
(2.)WLSNA0NA
(3.)ESZsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)NPANA0NA
(6.)ESAsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSanjay Gandhi National Park17-
(2.)Archaeological SitesNA0-
(3.)Defence InstallationsNA0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.41
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is in possession of PP
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 75
(d)Temporary Employment- During Operation 75
(e)No. of working days 300
(f)Total Manpower 500
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4918.23115.775033
(2.)Percentage of Total Project Area34135
(3.)No. of Plants2090209
(4.)Funds Allocated42042
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe project is newly raised therefore; At the time of development plantation will be carried out. The various Environmental facilities and infrastructure planned in the project. This includes solid wa
(2.)SocialWe will generate opportunities & Infrastructure which will be utilized by Locals.
(3.)FinancialThe proposed project would have beneficial impacts through provision of direct and indirect employment opportunities. At the time of construction and operational phases, there would be requirement for
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 213.25
(b)Total No. of Flats to be Build 707
(c)No. of Buildings 6
(d)Total plot area (sqm) 14148.16
(e)Total built up area (sqm) 155677.18
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 3
    Capacity 100
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4W- 984 MCGM Parking- 355 (293 Cars+ 62 HMV )
5.
Energy Saving Measures:
(a)Source/Mode LED Lamps, Solar Hot water system
(b)Percentage 23.3
(c)Quantity 365550
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Internal SWD will be connected to municipal SWD
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/17/00427
(ii)Name of the EIA Consultant Mahabal Enviro Engineers Pvt. Ltd.
(iii)Address Plot No F-7, Road No. 21, Wagle Estate, Thane (W)
(iv)Mobile No. 9323058368
(v)Landline No. 21716389
(vi)Email Id dap_24@hotmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPiyush Thakkar
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)M/S ESQUE FINMARK PVT. LTD.
AddressHira Bhavan, 112/122, Rajaram Mohan Roy Road, Prathana Samaj, Mumbai
Print