Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Cement Grinding Unit of 1200 TPD of M/s Chunar Churk Cement Ltd.proposed at Plot No. : B-10, Ramnagar Industrial Area- I, Village: Patana, Tehsil:Mughal Sarai, District: Chandauli State: U.P.
(b)Name of the Company / Organisation M/s CHUNAR CHURK CEMENT LTD.
(c)Registered Address plot b 10 ramnagar industrial area-I chandauli, UP,,Chandauli,Chhattisgarh-221008
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant pankaj singh
(b)Designation (Owner/ Partner/ CEO) director
(c)Address plot b 10 ramnagar industrial area -1 chandauli UP,,Chandauli,Chandauli,Uttar Pradesh-221008
(d)Pin code 221008
(e)E-mail chunarcement10@gmail.com
(f)Telephone No. 0-
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(b) Cement plants
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UP/IND/55067/2020
(e)Master Proposal Number(Single Window) SW/241626/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. B-10,RamnagarIndustrialArea-I,Village-Pat
(b)Pincode 232101
(c)Bounded Latitudes (North)
From
Degree 25
Minutes 14
Second 49.90
From
Degree 25
Minutes 14
Second 50.72
(d)Bounded Longitudes (East)
From
Degree 83
Minutes 4
Second 4.78
From
Degree 83
Minutes 4
Second 4.78
(e)Survey of India Topo Sheet No. 63O/4,63O/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 79
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4.0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshChandauliChandaulipatana
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 5740
(b)Date of Apply of TOR 25 Jul 2020
(c)Date of Issue of TOR / Standard ToR 30 Jul 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Jul 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :0.1
Plot No. B-10,RamnagarIndustrialArea-I,Village-Patana,Tehsil-Mughalsarai,District-Chandauli
State :Uttar Pradesh
District :Chandauli
Tehsil :Chandauli
Village :Patana
45employment generateOthers
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Cement Grinding Unit432000
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement432000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Nov 2021
(iv)Valid Upto 07 Nov 2021
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 34.54
(b) Funds Allocated for Environment Management (Capital) (in crores) 1.61
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.69
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.16
(e) Funds Allocated for Environment Management Capital(%) 4.66
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 360000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 360000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Clinker234000Tons per AnnumRajasthanRoad700 Open MarketCopy of Linkage
(2.)Gypsum18000Tons per AnnumRajasthanRoad700 Open MarketCopy of Linkage
(3.)fly ash108000Tons per AnnumRenukootRoad200 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 30 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube117.3810.2313.0312.45
(2.)NOxMicro Gram per Meter Cube29.3919.1523.3621.92
(3.)PM2.5Micro Gram per Meter Cube67.1337.1444.1442.43
(4.)SO2Micro Gram per Meter Cube15.9110.2313.0312.45
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l171.2215.652501000
(2.)TSSmg/l15600
(3.)TDSmg/l11974225002000
(4.)Total Hardnessmg/l424244200600
(5.)Fluoridemg/l1.700.6210
(6.)Heavy MetalsFemg/l0.660.111.00
(7.)pHNA7.407.236.58.5
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l3.33.1A
(2.)CODmg/l40.032.0A
(3.)DOmg/l7.87.6A
(4.)pHNA8.298.24A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))47.639.070
(2.)Leq(Day)A-weighted decibels(dB(A))68.150.275
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.657.29
(2.)P(Phosphorus)Milligram per Kilogram72.1253.29
(3.)Electric ConductivityMillisiemens per Centimetre0.31850.2434
(4.)K(Potassium)Milligram per Kilogram280.58111.20
(5.)N(Nitrogen)Percent0.1110.058
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 28
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2002Copy of Permission LetterPipelineOthersBorewell022 Feb 2021200
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Waste Water100150ETPReuse within the Plant & Recycling100
(2.)Domestic waste water1550STPGreen Belt Renewal Plant15
(3.)Industrial Waste Water100150ETPReuse within the Plant & Recycling100
16.1.
(a)Total Waste Water Generation 215
(b)Total Discharged Water 0
(c)Total Reused Water 215
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Kilolitre200RoadAuthorized Recyclers
(2.)Fly AshFly Ash8000Tons0Othersused for manufacturing of PPCCo-Processing
(3.)Bottom ashBottom Ash100Tons0Othersused for manufacturing of BrickCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube67.130.55.3972.5260
(2.)PM10Microgram per Meter Cube117.380.511.240.5128.62
(3.)NOxMicrogram per Meter Cube29.390.515.2744.6680
(4.)Others(Specify)COMicrogram per Meter Cube0.810.50.31.114.0
(5.)SO2Microgram per Meter Cube15.910.53.3819.2980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)00000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source UPPCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 77 KVA
(e)Stack Height (in m) 0.77
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land .63
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.63
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 18648.27
(b)Waste/Barren Land 261.18
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 732.87
(e)Settlements 11466.09
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Sand 757.98
    Total 31866.39
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.2166
(2.)Green belt0.3269
(3.)Built Up Area0.06157
(4.)OthersRoad0.02082
Total 0.62589
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0None
(2.)ESAsNA0None
(3.)Wildlife CorridorsNA0None
(4.)Critically Polluted AreaNA0None
(5.)WLSNA0None
(6.)ESZsNA0None
(7.)CorridorsNA0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0None
(2.)Archaeological SitesNA0None
(3.)Defence InstallationsNA0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 150
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 100
(e)No. of working days 360
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.3269
(b)Percentage of Total Project Area 51.89
(c)No. of Plants to be Planted 630
(d)Funds Allocated for Plantation 534000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialEmployment Upload
(2.)Environmentalgreen belt will develop
(3.)SocialCSR generate
(4.)SocialCSR generate
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0120
(ii)Name of the EIA Consultant Paramarsh Servicing Environment and Development
(iii)Address M.S.-1/10, Sector A, Sitapur Road Yojna (Near St. Antony School, Ram Ram Bank Chauraha) Aliganj, Lucknow-226024, U.P..
(iv)Mobile No. 7398041242
(v)Landline No. 0522
(vi)Email Id paramarsh.env@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 13 Jan 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantpankaj singh
Designationdirector
Name of Company (Applicant Name should not be given here)M/s CHUNAR CHURK CEMENT LTD.
Addressplot b 10 ramnagar industrial area-I chandauli, UP
Print