Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Soapstone Mining at Village- Lohakot, Tehsil- Didihat, District- Pithoragarh, Uttarakhand by M/s Lohakot Mines & Minerals
(b)Name of the Company / Organisation LOHAKOT MINES AND MINREALS
(c)Registered Address Village- Lohakot, Tahsil- Didihat, District- Pithoragarh, Uttarakhand,,Nainital,Uttarakhand-262551
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Kalawati Devi
(b)Designation (Owner/ Partner/ CEO) contractor
(c)Address Lohakot mines Minreals, Village- Bajwalpur, Rampur Road, Haldwani, Nainital, Uttarakhand,,Haldwani,Nainital,Uttarakhand-263139
(d)Pin code 263139
(e)E-mail lohakotmines@yahoo.com
(f)Telephone No. 9412-152105
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/UK/MIN/68901/2019
(e)Master Proposal Number(Single Window) SW/236818/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map enclosed along
(b)Pincode 262551
(c)Bounded Latitudes (North)
From
Degree 29
Minutes 41
Second 36
From
Degree 29
Minutes 41
Second 36
(d)Bounded Longitudes (East)
From
Degree 80
Minutes 12
Second 56
From
Degree 80
Minutes 12
Second 56
(e)Survey of India Topo Sheet No. 62-C/2, 62C/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1293
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 8
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandPithoragarhDidihatLohakot
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 120/SEAC
(b)Date of Apply of TOR 17 Sep 2019
(c)Date of Issue of TOR / Standard ToR 18 Nov 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Aug 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Sep 2021
Distance of Public Hearing Venue from the Proposed Project :0
Within the project premises
State :Uttarakhand
District :Pithoragarh
Tehsil :Didihat
Village :Lohakot
50Regarding the impact of mining on village and funds allocated for development of villagesOthersADC
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Soapstone Mining11311Maximum annual production
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Soapstone11311Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.30
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.077
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.20
(e) Funds Allocated for Environment Management Capital(%) 25.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Not Applicable0Tons per AnnumMostly from Local MarketRoad0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2020 To 31 May 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube41.6524.3333.4760
(2.)PM10Micro Gram per Meter Cube89.360.5778.10100
(3.)SO2Micro Gram per Meter Cube9.95.18.0580
(4.)NOxMicro Gram per Meter Cube31.512.622.0580
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l2722555002000
(2.)Total Hardnessmg/l184171.8300600
(3.)Fluoridemg/l0.980.21.01.5
(4.)Chloridesmg/l22142501000
(5.)TSSmg/l0000
(6.)Heavy MetalsFemg/l0.280.180.31
(7.)pHNA7.407.206.58.5
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.62.1E
(2.)pHNA7.747.68E
(3.)DOmg/l6.96.1E
(4.)CODmg/l87E
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))44.4639.4255
(2.)Leq(Night)A-weighted decibels(dB(A))42.6335.6645
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)00
(2.)K(Potassium)Milligram per Kilogram131.5116.2
(3.)pH7.567.16
(4.)Electric ConductivityMillisiemens per Centimetre333270
(5.)P(Phosphorus)00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.62 To 70
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.9 To 63
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface3.02Copy of Permission LetterPipelineOthersnatural spring1101 Nov 20213.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic wastewater1.51.5Soak PitOthersSoak pits1.50
16.1.
(a)Total Waste Water Generation 1.5
(b)Total Discharged Water 0
(c)Total Reused Water 1.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)InterburdenOthersMining waste2425.76Tons0RoadOthersbackfilled
(2.)Top soilOthersMining waste226.72Tons0RoadOthersbackfilled
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube41.652243.6560
(2.)SO2Microgram per Meter Cube9.92514.980
(3.)PM10Microgram per Meter Cube89.329.098100
(4.)NOxMicrogram per Meter Cube31.52334.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source Not required
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) not required
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.720
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.720
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 3.72
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 3.72
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.768Mining area
(2.)LandFill0.025STORAGE FOR TOP SOIL
(3.)OB Dump Area0.040Interburden
(4.)Safety Zone0.015Retaining wall
(5.)Built Up Area0.030Road/Foot track
(6.)OthersRemaining area2.842Remaining area
Total 3.72
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0not available within 10 km radius of the project location
(2.)Critically Polluted AreaNA0not available within 10 km radius of the project location
(3.)WLSNA0not available within 10 km radius of the project location
(4.)NPANA0not available within 10 km radius of the project location
(5.)ESZsNA0not available within 10 km radius of the project location
(6.)CorridorsNA0not available within 10 km radius of the project location
(7.)Wildlife CorridorsNA0not available within 10 km radius of the project location
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0not available within 10 km radius of the project location
(2.)ForestOgla Jorasi Lodi Reserved forest3Reserved forest
(3.)Defence InstallationsNA0not available within 10 km radius of the project location
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.720
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Leopard and Asiatic Black Bear
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 6,50,000
(iii)Period of Implementation within 1 year of after grant of EC
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ramganga river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 8.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 34
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 240
(f)Total Manpower 34
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.372
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 3720
(d)Funds Allocated for Plantation 350000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe green belt development will help to improve the air environment and aesthetics of the area.
(2.)SocialDirect and Indirect employment generation
(3.)FinancialRevenue generation to state
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SoapstoneMinor
2.
Mine Capacity in ROM (Run of Mine) 11311
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 218-Mukhya Khanij-/Sch.-148/Bhu.Khani.E./2017-18
(b)Date of Approval 08 May 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Directorate
(e)Approved Mining Lease Area 3.720
(f)Approved Capacity 11311
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.185401
(b)Mineable Reserves (Million Ton) 0.011451
(c)Extractable Reserves(Million Ton) 0.011311
(d)Percent(%) of Extraction 98
(e)Grade of Coal /Ore /Mineral 0.98
(f)Stripping Ratio 1 : 1.6
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 20
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 3.720
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 26 Aug 2020
(iii)Validity of LOI 20
(iv)Reference No. of LOI 3960/77-5-2000-449/83
(c)Whether Lease Deed Executed ? No
(i)Reason thereof After grant of EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof After grant of EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 0.040
(iii)Height (in meter) 6
(iv)Quantity (in Million Cubic meter) 0.0068
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.000642
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.000642
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface 00
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS000
(2.)WASTE LAND000
(3.)SURFACE WATER BODIES0000
(4.)GRAZING LAND000
(5.)AGRICULTURE LAND3.72003.72
(6.)FOREST LAND000
TOTAL3.7203.72
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0.025000.025
(2.)EXTERNAL OB DUMPS0000
(3.)ROADS000.0300.03
(4.)BUILT UP AREA (COLONY/OFFICE)0000
(5.)VIRGIN AREA0000
(6.)GREEN BELT0.372000.372
(7.)EXCAVATION/QUARRY0.768000.768
(8.)INTERNAL OB DUMPS000.0400.04
TOTAL1.16500.0701.235
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0.065
(c)Quarry(in hectare) 0.768
(d)Safety Zone(in hectare) 0.030
(e)Final Void of 0 (hectare) at a Depth of 0 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 3720
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.372
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)5113111131111311113110
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA0211
(ii)Name of the EIA Consultant M/s Eco Laboratories and Consultants Pvt Ltd.
(iii)Address E 207, Phase VIII B, Sector 74, Industrial Area, SAS Nagar Mohali
(iv)Mobile No. 7533858409
(v)Landline No. 0172461622
(vi)Email Id info@ecoparyavaran.org
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 17 Dec 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKalawati Devi
Designationcontractor
Name of Company (Applicant Name should not be given here)LOHAKOT MINES AND MINREALS
AddressVillage- Lohakot, Tahsil- Didihat, District- Pithoragarh, Uttarakhand