Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Scientific Land Fill Site (Integrated Solid Waste Management (ISWM) Project)
(b)Name of the Company / Organisation NAGAR NIGAM RISHIKESH
(c)Registered Address Nagar nigam Rishikesh Haridwar Road Rishikesh,Dehradun,Uttarakhand-249201
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant NARENDRA SINGH QUIRIYAL
(b)Designation (Owner/ Partner/ CEO) NAGAR AYUKT
(c)Address Nagar nigam Rishikesh Haridwar Road Rishikesh,Dehradun,Uttarakhand-249201
(d)Pin code 249201
(e)E-mail rishilandfill@gmail.com
(f)Telephone No. 135-2431472
(g)Fax No. 2431227
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UK/MIS/68694/2020
(e)Master Proposal Number(Single Window) SW/235613/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Lalpani Beat No.1
(b)Pincode 249201
(c)Bounded Latitudes (North)
From
Degree 30
Minutes 6
Second 14.8
From
Degree 78
Minutes 14
Second 56.42
(d)Bounded Longitudes (East)
From
Degree 30
Minutes 5
Second 6.82
From
Degree 78
Minutes 14
Second 57.85
(e)Survey of India Topo Sheet No. 53J8, J4, 53 K1, K5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 371
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 3.9
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandDehradunRishikeshLal Pani Beet No. 1
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 166/SEAC
(c)Date of Apply of TOR 17 Jan 2020
(d)Date of Issue of TOR / Standard ToR 23 Jun 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Jan 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :15 Mar 2021
Distance of Public Hearing Venue from the Proposed Project :0
Lalpani Beet No.1 , Rishikesh Dehradun
State :Uttarakhand
District :Dehradun
Tehsil :Rishikesh
Village :Lalpani Beet No. 1
250Queries regarding pollution from the project and its control measures, employment generation etc. were raised.District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)RDF, Composting & Secured Landfill , Total land area 10 haMechanical composting
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)secure landfill240OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 22
(b) Funds Allocated for Environment Management (Capital) (in crores) 9.95
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 1.0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0962
(e) Funds Allocated for Environment Management Capital(%) 45.23
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)As per table attached0OthersTLocalRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube9.05.08.980
(2.)PM10Micro Gram per Meter Cube844583100
(3.)NOxMicro Gram per Meter Cube18.49.817.180
(4.)OthersCH4Mili Gram per Meter Cube1.71.01.7NA
(5.)PM2.5Micro Gram per Meter Cube42204160
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l7844200600
(2.)pHNA7.707.056.58.5
(3.)TSSmg/l2200
(4.)TDSmg/l1761205002000
(5.)Chloridesmg/l41292501000
(6.)Fluoridemg/l0.20.11.01.5
    14.3.     No. of Surface Water Monitoring Locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l5.25.1C
(2.)pHNA7.487.46C
(3.)DOmg/l9.39.1C
(4.)BODmg/l1.51.4C
    14.4.     No. of Ambient Noise Monitoring Locations : 5
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))43.340.245
(2.)Leq(Day)A-weighted decibels(dB(A))52.548.755
    14.5.     No. of Soil Sample Monitored Locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare24.615.8
(2.)K(Potassium)Kilogram per hectare126.596.4
(3.)Electric ConductivityOthersµmhos/cm378.4325.8
(4.)N(Nitrogen)Kilogram per hectare296.5274.2
(5.)pH7.857.44
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 15
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMuncipal Supply water200Copy of Permission LetterPipelineOthersPipeline Supply2070/SWM/2021-2227 Oct 202120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Total waste water8.8100sent to Leachate treatment PlantGreen Belt Renewal Plant8.8
(2.)Leachate45100Leachate treatment PlantReuse within the Plant & Recycling45
16.1.
(a)Total Waste Water Generation 53.8
(b)Total Discharged Water 0
(c)Total Reused Water 53.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste240Tons10RoadOtherscomposting and SLF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube840.20.002384.0023100
(2.)SO2Microgram per Meter Cube9.00.20.02049.020480
(3.)PM2.5Microgram per Meter Cube400.20.002140.002160
(4.)NOxMicrogram per Meter Cube19.60.20.01119.61180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGDeisal40.1PM10,SO2,NOx-
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source State Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land 10
(b)Private Land 0
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 10
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 10
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt1.05
(2.)Area for Solid Waste Management2.50
(3.)Main Plant0.96
(4.)OthersPrking, Open area, road etc5.49
Total 10
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSRajaji National Park3.0East Direction
(2.)ESZsRajaji National Park3.0Located in east direction
(3.)ESAsnone0None within study area
(4.)Wildlife CorridorsElephant corridor motichur5southest direction
(5.)Critically Polluted AreaNone0None within study area
(6.)NPARajaji National Park3.0eats of the site
(7.)CorridorsElephant corridor motichur5southest direction
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestthere are many forest in study area0.9nearest is located about 0.9 km
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status In-Principle(Stage-I) Approval Obtained
(i)MoEFCC file number FP/UK/Others/39678/2019
(ii)Date of In-Principle (Stage-I) approval 24 Sep 2020
(iii)Area diverted 10
(iv)Uploaded FC Letter Copy of FC Letter
(b)Legal Status of Forest Land Select
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 154
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10
(b)Land yet to be acquired(Ha) 10
(c)Status of Land acquisition if not acquired under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Gazella bennettii, Panthera pardus and Elephus maximus indicus.
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ganga River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 3.94
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 80
(d)Temporary Employment- During Operation 70
(e)No. of working days 330
(f)Total Manpower 190
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.05
(b)Percentage of Total Project Area 10.50
(c)No. of Plants to be Planted 1200
(d)Funds Allocated for Plantation 1700000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental8.2. Compliance to the Municipal Solid Waste (Handling and Management) Rules, 2000 and further amendments thereof; with respect to biological processing and maximum recycling
(2.)Social? Economic Benefits to Local Municipality
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 10
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 10000
(e)Total built up area (sqm) 35500
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
    Capacity 0
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 17284
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0197
(ii)Name of the EIA Consultant EQMS India Pvt. Ltd.
(iii)Address 305, 3rd Floor, Plot No. 16, Rishabh Towers, Community Centre, Karkardooma, Delhi – 110 092
(iv)Mobile No. 9810297612
(v)Landline No. 0114227008
(vi)Email Id skj@eqmsglobal.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 23 Nov 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNARENDRA SINGH QUIRIYAL
DesignationNAGAR AYUKT
Name of Company (Applicant Name should not be given here)NAGAR NIGAM RISHIKESH
AddressNagar nigam Rishikesh Haridwar Road Rishikesh