Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of distillery from 30 KLPD to 60 KLPD by Vishwasrao Naik Sahakari Sakhar Karkhana Ltd., Sangli
(b)Name of the Company / Organisation VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD
(c)Registered Address Yashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli,,Sangli,Maharashtra-415408
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Ramchandra Shivajirao Patil
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address Yashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli,Sangli,Maharashtra-415408
(d)Pin code 415408
(e)E-mail rama.patil12@gmail.com
(f)Telephone No. 2345-272138
(g)Fax No. 231006
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(g) Distilleries
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/IND2/68526/2017
(e)Master Proposal Number(Single Window) SW/234771/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S. No. 182, 224, 223, 175, 189, 183, 162; A/P: Yas
(b)Pincode 415408
(c)Bounded Latitudes (North)
From
Degree 16
Minutes 56
Second 11
From
Degree 16
Minutes 56
Second 30
(d)Bounded Longitudes (East)
From
Degree 74
Minutes 4
Second 55
From
Degree 74
Minutes 5
Second 21
(e)Survey of India Topo Sheet No. 47K4, 47L1, 47H13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 560
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 560
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSangliShiralaYashwantnagar, Chikhali
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/401/2017-IA-II (I)
(b)Date of Apply of EC 30 Aug 2017
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Aug 2020
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Sep 2020
Distance of Public Hearing Venue from the Proposed Project :0.1
Industrial site of Vishwasrao Naik SSKL
State :Maharashtra
District :Sangli
Tehsil :Shirala
Village :Yashwantnagar, Chikhali
76No major issues raised by locals, supported expansion projectOthers
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By CPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on NIL
(iii)Letter No. 5-34/2003/ENV 3319
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Fusel Oil0.050.050.1OthersT/DRoad
(2.)CO2232346OthersT/DRoad
(3.)Sugar5620562OthersT/DRoad
(4.)Pressmud1800180OthersT/DRoad
(5.)Absolute Alcohol20020Kilo Litre per Day(KLD)Road
(6.)RS/ENA303060Kilo Litre per Day(KLD)Road
(7.)Pharmaceutical Grade Alcohol06060Kilo Litre per Day(KLD)Road
(8.)Compost35035OthersT/DRoad
(9.)Bagasse135001350OthersT/DConveyor Belt
(10.)Molasses1800180OthersT/DRoad
(11.)Electricity15015Mega Watt(MW)Road,OthersGrid
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Cogeneration Plant15 MW015 MWExisting 15 MW Cogen plant
(2.)Molasses Distillery30 KLPD30 KLPD60 KLPDExpansion of distillery from 30 KLPD to 60 KLPD
(3.)Sugar Factory4500 TCD04500 TCDExisting 4500 TCD sugar factory
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Feb 2022
(iv)Valid Upto 22 Aug 2022
(v)File No. CR 2202000283
(vi)Application No. 0000119064
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 42.88
(b) Funds Allocated for Environment Management (Capital) (in crores) 8.5
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.56
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2.15
(e) Funds Allocated for Environment Management Capital(%) 19.82
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 111
(b)Existing quantity of raw material/fuel 111
(c)Total quantity of raw material/fuel 222
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses – C type OR B type222OthersT/DOwn sugar factory/ outside purchaseRoad30 Open MarketCopy of Linkage
(2.)Lime8OthersT/Doutside purchaseRoad20 Open MarketCopy of Linkage
(3.)YEAST0.2OthersT/Doutside purchaseRoad10 Open MarketCopy of Linkage
(4.)De-foaming Oil7OthersT/Doutside purchaseRoad15 Open MarketCopy of Linkage
(5.)Sugar cane4500OthersT/DNearby farmsRoad30 Open MarketCopy of Linkage
(6.)Sulfur2.5OthersT/Doutside purchaseRoad15 Open MarketCopy of Linkage
(7.)baggasse1020OthersT/DOwn sugar factoryConveyor Belt0.5 CaptiveCopy of Linkage
(8.)Urea2.5OthersT/Doutside purchaseRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2019 To 31 Dec 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube70.345.269.8100
(2.)PM2.5Micro Gram per Meter Cube28.410.128.360
(3.)SO2Micro Gram per Meter Cube31.413.831.1280
(4.)NOxMicro Gram per Meter Cube37.518.337.480
(5.)OthersCOMili Gram per Meter Cube0.080.010.084
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l6.756.75100100
(2.)TDSmg/l399.62174.8500500
(3.)Total Hardnessmg/l188.84105.1200600
(4.)Heavy MetalsZincmg/l1.550.13515
(5.)pHNA7.777.146.58.5
(6.)Chloridesmg/l65.9831.472501000
(7.)Fluoridemg/l0.180.0411.5
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l35.09.45E
(2.)DOmg/l3.50.55E
(3.)pHNA7.837.55A
(4.)CODmg/l97.8625.69E
(5.)OthersTotal coliformOthersNo./100 ml522102D
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))66.250.975
(2.)Leq(Night)A-weighted decibels(dB(A))56.540.570
    14.5.     No. of Soil Sample Monitored Locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare525.6416.57
(2.)pH7.927.63
(3.)P(Phosphorus)Kilogram per hectare359.2306.5
(4.)K(Potassium)Kilogram per hectare459.2265.19
(5.)Electric ConductivityMillisiemens per Centimetre171.4138.7
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.35 To 16.45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.2 To 11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4145.5Copy of Permission LetterPipelineBarrage4748/202130 Aug 2021604
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Effluent- Sugar & Cogen Plant298600Treated in existing ETP having primary, secondary & tertiary treatment units & used for green belt development in own premisesGreen Belt Renewal Plant298
(2.)Domestic Effluent- Sugar, Cogen & Distillery Unit2440Treated in proposed STPOthersfor flushing & gardening240
(3.)Raw Spentwash (Distillery)480500Concentrated in MEE & forwarded for compostingOthersGiven as manure4800
(4.)Other Effluent- Distillery469600Treated in proposed CPUReuse within the Plant & Recycling469
16.1.
(a)Total Waste Water Generation 1271
(b)Total Discharged Water 0
(c)Total Reused Water 1271
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)CPU SludgeIndustrial Waste144Tons0.5RoadOthersuse as manure
(2.)ETP SludgeIndustrial Waste66Tons0.5RoadOthersuse as manure
(3.)Bagasse Ash (Cogen)Bottom Ash3600Tons0.3RoadOthersuse as manure
(4.)Yeast SludgeIndustrial Waste2700Tons0.5RoadOthersuse as manure/ filler material for composting
(5.)Bagasse Ash (Distillery)Bottom Ash1620Tons0.3RoadOthersuse as manure/ brick manufacturing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube18.414.50.0518.4660
(2.)NOxMicrogram per Meter Cube26.944.60.127.080
(3.)PM10Microgram per Meter Cube57.124.60.157.22100
(4.)SO2Microgram per Meter Cube23.554.6124.5580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Proposed 22 TPH BoilerBagasse 210 T/D501.2PM10Less than 115 mg/Nm3
(2.)Existing 80 TPH Cogen BoilerBagasse 810 MT/D761.8PM10Less than 115 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6400
(b)Source own 15 MW Cogen plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG set of 700 & 300 KVA
(e)Stack Height (in m) 2
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 52.52
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 52.52
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 11933.6
(b)Waste/Barren Land 2516.96
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 580.93
(e)Settlements 2124.08
(f)Industrial 0
(g)Forest 4204
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Fallow+Scrub 10055.93
    Total 31415.5
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area6.43Existing+Proposed
(2.)Green belt22.4Existing Green belt
(3.)OthersRoad+Parking+Open Area23.6Road+Parking+Open Area
Total 52.43
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0There is no presence of WLS in 10Km radius of Project
(2.)ESAsNot Applicable0There is no presence of ESAs in 10Km radius of Project
(3.)CorridorsNot Applicable0There is no presence of Corridors in 10 Km radius of Project
(4.)Wildlife CorridorsNot Applicable0There is no presence of Wildlife Corridors in 10 Km radius of Project
(5.)Critically Polluted AreaNot Applicable0There is no presence of CPA's in 10 Km radius of Project
(6.)NPANot Applicable0There is no presence of NPA's in 10Km radius of Project
(7.)ESZsNot Applicable0There is no presence of ESZ in 10Km radius of Project
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0There is no presence of defense installations in 10 Km radius of Project
(2.)ForestNot Applicable0There is no presence of forest land in 10 Km radius of Project
(3.)Archaeological SitesNot Applicable0There is no presence of notified archaeological sites in 10 Km radius of Project
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 52.52
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Completed
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Black Kite, Balck shouldered kite, Indian Monitor Lizard, Indian Peafowl, India Guar, Leopard, Short Shell Turtles
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made Rs. 50 Lac
(iii)Period of Implementation Period of 2022-2025
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Warana River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 8
(d)Temporary Employment- During Operation 2
(e)No. of working days 270
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2240000224000
(2.)Percentage of Total Project Area42042
(3.)No. of Plants747207472
(4.)Funds Allocated600000006000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalEmission of SPM, SO2 is the main criteria for consideration of green belt development. Plantation under green belt is provided to abate effects of the above emissions. Moreover, there will also be co
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0135
(ii)Name of the EIA Consultant Equinox Environments India Pvt. Ltd.
(iii)Address F-11, Namdev Nest, 1160 B, E, Sykes Extension, Opposite Kamla College, Kolhapur 416001
(iv)Mobile No. 9657865122
(v)Landline No. 0231253123
(vi)Email Id projects@equinoxenvi.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Apr 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)30/07/2022please submit compliance as per minutes
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamchandra Shivajirao Patil
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)VISHWASRAO NAIK SAHAKARI SAKHAR KARKHANA LTD
AddressYashwantnagar,A/p.Chikhali,Tal.Shirala, Dist.Sangli