Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? Yes
Type of Violation Started the work onsite without prior EC under EIA notification,2006.
Details of Violation In the light of declaration of the Honorable Supreme Court Judgment, the Committee observed, while considering our case, that a violation has been committed, as the production in the preceding year i.e. 2006-07 to 2008-2009 was 34221.00 tonne and referred the matter to the violation committee for appraisal.
Upload document of Damage Assessment Report
Upload document of Remediation Plan and Natural & Community augmentation plan
Upload TOR Letter(if issued earlier)
Upload EC Letter(if issued earlier)
Details of Project:
(a)Name of the project(s) Kotra Sandstone (Building Stone) Mine
(b)Name of the Company / Organisation KOTRA SANDSTONE (BUILDING STONE)MINE
(c)Registered Address Near Village- Kotra, Tehsil-Jhalrapatan, District-Jhalawar,Kota,Rajasthan-326517
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant DARA SINGH SINGH
(b)Designation (Owner/ Partner/ CEO) Projectproponent
(c)Address Near Village- Kotra, Tehsil-Jhalrapatan, District-Jhalawar,Kota,Rajasthan-326517
(d)Pin code 326517
(e)E-mail kotramines123@gmail.com
(f)Telephone No. 11-27344493
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/MIN/68311/2017
(e)Master Proposal Number(Single Window) SW/233671/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. M L No 37/1991
(b)Pincode 326001
(c)Bounded Latitudes (North)
From
Degree 24
Minutes 39
Second 14.88
From
Degree 24
Minutes 39
Second 00.26
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 7
Second 30.74
From
Degree 76
Minutes 6
Second 57.49
(e)Survey of India Topo Sheet No. 54 D/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 342
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.90
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanJhalawarJhalrapatanKotra
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 8672
(b)Date of Apply of TOR 28 Nov 2017
(c)Date of Issue of TOR / Standard ToR 18 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Mar 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 Apr 2021
Distance of Public Hearing Venue from the Proposed Project :0.500
At mine site, near village Kotra, Tehsil Jhalrapatan, District Jhalawar
State :Rajasthan
District :Jhalawar
Tehsil :Jhalrapatan
Village :Kotra
34Priority will be given to local people during employment. Plantation will be carried outDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Mining Activities35555TPA of Sandstone Building Stone
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Area 19.4752 Ha35555Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.5
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.0319
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0832
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.015
(e) Funds Allocated for Environment Management Capital(%) 6.38
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 60
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 60
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel Fuel60OthersKLYOpen marketRoad26.74 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2022 To 31 May 2022
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube71.0058.9070.95100
(2.)NOxMicro Gram per Meter Cube17.8012.2017.7080
(3.)OthersCOMicro Gram per Meter Cube0.50.50.54
(4.)PM2.5Micro Gram per Meter Cube30.2023.9030.2060
(5.)SO2Micro Gram per Meter Cube12.209.7012.2080
    14.2.     No. of Ground Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l7.507.056.58.5
(2.)Chloridesmg/l210252501000
(3.)Fluoridemg/l1.50.71.001.50
(4.)TSSmg/l5.05.000
(5.)TDSmg/l7803435002000
(6.)Heavy MetalsFemg/l0.220.10.30.3
(7.)Total Hardnessmg/l560120200600
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.68.05A
(2.)DOmg/l6.05.0A
(3.)CODmg/l22.69.04A
(4.)BODmg/l7.02.2A
    14.4.     No. of Ambient Noise Monitoring Locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.250.875
(2.)Leq(Night)A-weighted decibels(dB(A))43.241.070
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Othersmg/kg5.19352.7097
(2.)P(Phosphorus)Otherskg/ha17.9211.20
(3.)K(Potassium)Otherskg/ha761.6250.88
(4.)Electric ConductivityOthersppm490260
(5.)pH8.07.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 42 To 47
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 37 To 42
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface3.00.5 Not Appliacble PipelineOpen Well123615 Sep 20213.00
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic0.50.5Septic TankReuse within the Plant & Recycling0.50
16.1.
(a)Total Waste Water Generation 0.5
(b)Total Discharged Water 0
(c)Total Reused Water 0.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NoneFly Ash0Tons0.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube30.200.50.2730.4760
(2.)SO2Microgram per Meter Cube12.200.50.1412.3480
(3.)PM10Microgram per Meter Cube70.100.50.3970.49100
(4.)NOxMicrogram per Meter Cube17.800.50.1217.9280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source None
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0
(c)Government Land 19.4752
(d)Revenue Land 0
(e)Other Land 0
    Total Land 19.68
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 19.4752
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : None 0
    Total 19.4752
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Water Reservoir3.3264Excavated portion
(2.)Green belt1.64Plantation purpose
(3.)OthersBackfilled2.1264Backfilled
Total 7.0928
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone within 10 km00
(2.)NPANone within 10 km00
(3.)ESAsNone within 10 km00
(4.)WLSMukandhara National Park2.65National Park
(5.)CorridorsNone within 10 km00
(6.)Wildlife CorridorsNone within 10 km00
(7.)ESZsNone within 10 km00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone within 10 km00
(2.)Defence InstallationsNone within 10 km00
(3.)ForestMukandhara National Park2.65National Park
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 19.4752
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Lakshmipura Pond
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.02
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 29
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 28
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 6.4270
(b)Percentage of Total Project Area 32.66
(c)No. of Plants to be Planted 6400
(d)Funds Allocated for Plantation 1403750
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
(2.)EnvironmentalPlantation will be carried out
(3.)FinancialRevenue Generation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)SandstoneMinor
2.
Mine Capacity in ROM (Run of Mine) 50790
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 5459
(b)Date of Approval 09 Dec 2022
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department State
(e)Approved Mining Lease Area 19.4752
(f)Approved Capacity 35555
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1431360
(b)Mineable Reserves (Million Ton) 1431360
(c)Extractable Reserves(Million Ton) 1431360
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 1 : 0.70
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 1.16
(i)Mining Method Opencast
(j)Life of Mine (Years) 40
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 19.4752
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Existing mining lease
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 39.01
(iii)Validity of the lease deed From : 10 Sep 1979 To : 09 Sep 2031
(iv)Date of Execution of Mining Lese 28 Jul 2017
(v)Reference Number 1327
(d)Whether Lease Deed Renewed ? Yes
     8.1.    Earlier Renewals:
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
(1.)Renewal 28 Jul 2017 From : 10 Sep 1979 To : 09 Sep 2031 Copy of Earlier Lease1327 19.68 0
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 19.4752
(b)Depth (in meter) 15
(c)Volume (in Million Cubic meter) 1431360
12.
Details of Quarry:
(a)Final Void of 5.4528 (hectare) at a Depth of 19 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 19.4752
13.
Details of Transportation:
(a)In Pit/Underground to Surface Excavator
(b)Surface to Siding/Loading JCB
(c)Transportation / Conveyor Details Road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)GRAZING LAND000
(4.)OTHERS(Specify)Diversified Forest Land19.47520.19.4752
(5.)FOREST LAND000
(6.)SETTLEMENTS000
(7.)SURFACE WATER BODIES000
TOTAL19.4752019.4752
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY2.12643.32640.00005.4528
(2.)INTERNAL OB DUMPS0.000.000.000
(3.)ROADS0.000.000.320.32
(4.)VIRGIN AREA0.000.007.27547.2754
(5.)TOP SOIL STORAGE0.000.000.000
(6.)GREEN BELT1.64000.000.001.64
(7.)EXTERNAL OB DUMPS0.000.000.000
(8.)BUILT UP AREA (COLONY/OFFICE)0.000.000.000
(9.)OtherAfforestation4.78700.000.004.787
TOTAL8.55343.32647.5954019.4752
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 19.4752
(d)Safety Zone(in hectare) 1.640
(e)Final Void of 5.4528 (hectare) at a Depth of 19 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0.00
(h)Total afforestation plant (in hectare) 6.494
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/SA 101
(ii)Name of the EIA Consultant Apex Mintech Consultants
(iii)Address 3 Dhebar Colony Near ITI Pratapnagar Udaipur
(iv)Mobile No. 9829161803
(v)Landline No. 0000000000
(vi)Email Id apex.mintech.udr@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 16 Apr 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)21/12/20211.Copy of Form-1 duly signed by pp and consultant is not submitted. 2.The mine is in cluster and therefore EMP should be submitted for whole cluster. 3.Affidavit regarding violation of EIA notification and regarding correctness of submitted data & documents by consultant as well as by PP is not submitted 4.Copy of approved mining plan is not submitted. 5.Submit Certificate from concerned Deputy Conservator of Forest for proposed area not falling within 10 kms of boundary of wildlife Sanctuary/NP/ conservation reserve. 6.Cluster certificate is not submitted duly certified by ME/AME in prescribed format. 7.submit 15 km GT sheet 8.The mine is in cluster and therefore EIA/EMP should be submitted for whole cluster. 9.Copy of accreditation Certificate is not submitted. 10.District survey report as per MOEF notification is not submitted. 11.copy of Public hearing not submitted.
(2.)21/01/2023The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)24/05/2023the Committee asked PP to submit the required documents within a period of 45 days failing which the project shall be recommended to SEIAA for closure and delistment: 1. Revised Remediation Plan, Natural Resource Augmentation Plan, Community Resource Augmentation Plan and plan for up gradation of environment against Economic benefit derived due to violation of the EIA notification and penalty to be deposited with the RSPCB as per the Provisions of the EIA Notification, 2006 andADS Letter
(2.)16/06/2023Correction has been made as per insturction receivedADS Letter
(3.)18/04/20245.117ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDARA SINGH SINGH
DesignationProjectproponent
Name of Company (Applicant Name should not be given here)KOTRA SANDSTONE (BUILDING STONE)MINE
AddressNear Village- Kotra, Tehsil-Jhalrapatan, District-Jhalawar