Form-1
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
1. Basic Informations
Project Name Revision of Commercial Building Project Company/Organisation Name M/S VALUE BUILDCON PVT LTD
Registered Address A 13A Green Park Main Road 3rd floor New Delhi Delhi 110016 Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant BB Sahu
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address A 13A green park Main Road 3rd Floor New Delhi,,Vasant Vihar,South West,Delhi-110016
(d)Pin code 110016
(e)E-mail valuebuildcon2021@gmail.com
(f)Telephone No. 120-4044660
(g)Fax No.
Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . NIL
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(a) Building and Construction projects
(b)Minor Project/Activity8(a) Building and Construction projects
(c)Category B2
(d)Proposal Number SIA/HR/MIS/233526/2021
(e)Master Proposal Number(Single Window) SW/233524/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type(New/Expansion/Modernization) Fresh EC
4.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaGurgaonGurgaonVillage Gurguram, Sector-104,
5.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(c)Reason -1
(d)Supporting Document NILL
Project Profile
Location of the project Village-Gurugram, Sector-104, Gurugram, Haryana
Town / Village
(Name of more than one town may be entered by separating with)
gurugram Plot/Survey/Khasra No.
(Name of more than one town may be entered by separating with)
7702/22,7704/222,7701/221
State Haryana District Gurgaon
Tehshil Gurgaon Pincode 122006
Nearest railway station Gurugram Railway Station Distance from the project site 1.2
Nearest airport Indira Gandhi International Airport Distance from the project site 9.4
Nearest Town/City/District Headquarters Tikampur Village Distance from the project site 3.2
Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) Gurugram Municipal corporation, Address C-1, Info City Sector-34,Gurugram. Toll Free Number: 18001801817 Upload GPS file Copy of Kml File     
Uploaded GPS file
Shape of the project land Block (Polygon) Site alternative under consideration(If any) Uploaded Site alternative under consideration
Brief summary of project Uploaded Brief summary of project
Does your project location falls under out of any following areas None of above Areas
Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) 42698.682 Existing Built Up Area(In Meter /Sqr) 0
Does it attract any of the general conditions given below? No
Does it attract the specific condition given below? No
Interlinked Projects No
Whether separate application of interlinked projects has been submitted? Date of Submission
Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? No
Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? No
Whether the proposal involves approval/clearance under the C.R.Z notification,2011? No
Whether there is any Government Order/Policy relevent/relating to the site? No
Forest land involved(hectares) 0
Is there any litigation pending against the project? No


Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
S.No Information/Checklist confirmation Yes/No Details there of (with approximate quantities/rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) No The development is in accordance with Master Plan and there will be no change in land use.
1.2 Clearance of existing land, vegetation and buildings? Yes The project does not involve clearance of existing land, vegetation/building.
1.3 Creation of new land uses? No The development is in accordance with Master Plan and there will be no change in land use.
1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Soil investigation has been done during the study.
1.5 Construction works? Yes All construction activities will be confined within the project premises; there will be no physical changes outside the project boundary.
1.6 Demolition works? No Project site is vacant land. Demolition is not required.
1.7 Temporary sites used for construction works or housing of construction workers? Yes All the construction activity including stocking of raw materials will be confined within the project site only. No temporary labor hutments are proposed. Local labors from nearby area will be hired. Sanitation facilities will be developed at site.
1.8 Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations Yes Excavation will be carried out for foundation of buildings. The excavated soil will be used in backfilling and other area development activities. (Total Excavated Soil 22,787.415m3)
1.9 Underground works including mining or tunneling? Yes Underground works includes excavation of earth for the foundation of the building only.
1.10 Reclamation works? No No reclamation work required.
1.11 Dredging? No No dredging required.
1.12 Offshore structures? No No offshore structures required.
1.13 Production and manufacturing processes? No No production or manufacturing process involved as the project is a warehouse project.
1.14 Facilities for storage of goods or materials? Yes Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents? Yes Solid Waste: The solid waste generated from the project will be in the form of: Construction Waste: Left over cement and mortars, cement concrete blocks, aggregate, sand and other inorganic material will be recycled and reused as Granular Sub Base (GSB) layer of pavement. Earth rendered surplus from the excavation will be utilized in the embankment works. Operational Phase: The solid waste generated from project will be mainly domestic in nature and the quantity of the waste will be 148
1.16 Facilities for long term housing of operational workers? No Local laborers will be hired from nearby areas during construction phase. So, there will be no need to create permanent facilities for long-term housing of operational workers
1.17 New road, rail or sea traffic during construction or operation? No The Nearest Highway is SH-15A which is 3.5 km (SW), NH-48 is 5 km towards SSE direction, MDR-136 which is 7.8 km (W), MDR-137 which is 9.4 km (E), NH-148A which is 7.5 km (E), NH-248A which is 6 km (SE), Western Peripheral Expressway which is 14.2 km (W), & Dwarka Expressway is 0.15 km towards W direction away from project site. The nearest railway station being Gurugram Railway Station is about 1.2 km (E) away from the project site. The nearest Airport is Indira Gandhi International Airport at
1.18 New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? No The Nearest Highway is SH-15A which is 3.5 km (SW), NH-48 is 5 km towards SSE direction, MDR-136 which is 7.8 km (W), MDR-137 which is 9.4 km (E), NH-148A which is 7.5 km (E), NH-248A which is 6 km (SE), Western Peripheral Expressway which is 14.2 km (W), & Dwarka Expressway is 0.15 km towards W direction away from project site. The nearest railway station being Gurugram Railway Station is about 1.2 km (E) away from the project site. The nearest Airport is Indira Gandhi International Airport at
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? No The project site is well connected through NH-48, SH-15A, MDR-136, MDR-137, NH-148A, NH-248A, Western Peripheral Expressway and Dwarka Expressway which has low traffic density; there will be no need for diversion or closure of existing traffic routes.
1.20 New or diverted transmission lines or pipelines? No There will not be any new/diverted transmission lines or pipelines around the project.
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? No No impoundment, damming, culver ting, realignment or other changes to the hydrology of surface watercourses is proposed.
1.22 Stream crossings? No There are no streams running across the site.
1.23 Abstraction or transfers of water from ground or surface waters? Yes The water supply will be through private water tankers during construction phase. About 140 KLD of fresh water will be required during operation phase of the project.
1.24 Changes in water bodies or the land surface affecting drainage or run-off? Yes Runoff will increase due to increased paved surface. However, increased runoff will be managed by well-designed Rainwater Harvesting System and storm water management plan.
1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes During the construction phase, about 15-20 trucks are estimated per week. Adequate parking space nearby the project site for loading and unloading of materials will be provided. Adequate provision will be made for car/vehicle parking at the project site. There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow smooth movement at the site. The proposed parking area will be 539 cars
1.26 Long-term dismantling or decommissioning or restoration works? No No Long term dismantling or decommissioning or restoration works will be involved.
1.27 Ongoing activity during decommissioning which could have an impact on the environment? No None
1.28 Influx of people to an area in either temporarily or permanently? No Local laborers from nearby area will be employed during the construction phase. In the operation phase, most of the expected occupants will be from the surrounding areas. Hence, the project will lead to a redistribution of occupants within the city. Thus, no significant influx of people is envisaged
1.29 Introduction of alien species? No The landscaping will be carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions like Alstonia Scholaris etc.
1.30 Loss of native species or genetic diversity? No There will be no significant impact on the native species or genetic diversity.
1.31 Any other actions? No Not Applicable.
2 Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha) No The development is in accordance with Master Plan and there will be no change in land use.
2.2 Water (expected source & competing users) unit: KLD Yes During construction phase, sewage will be treated and disposed through septic tanks with soak pits. The waste water in operation phase will be treated up to tertiary level in a STP of 275 KLD capacity and the treated sewage will be reused for toilet flushing and horticulture. The rest of the treated water will be discharged into the sewer line. Dewatered/dried sludge generated from the STP plant will be used as manure for green belt development.
2.3 Minerals (MT) Yes Minerals such as sand and aggregates will be required during the construction phase.
2.4 Construction material – stone, aggregates, sand / soil (expected source – MT) Yes All materials for construction will be arranged through select suppliers.
2.5 Forests and timber (source – MT) Yes All material and timber will be provided by selected suppliers. However steel frames etc shall be used to minimize the use of timber.
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) Yes The power supply will be supplied by Dakshin Haryana Bijli Vitran Nigam (DHBVN). The total maximum demand is estimated as 2469 kVA. There will be provision of 4 no. of DG sets of total capacity 3520 kVA (2x 1010 +2x 750) [EC accorded + Revision] for power back up in the Revision of Commercial Colony Project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion.
2.7 Any other natural resources (use appropriate standard units) No Not Applicable
3 Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies Yes We will store non-hazardous materials/products in our proposed project. Diesel for DG sets will be stored in drums in earmarked locations. It shall also be handled as per The Manufacture, Storage and Import of Hazardous Chemical Rules, 1989 and Material Safety Data Sheet.
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) No Suitable drainage and waste management measures (with frequent spray of insecticides etc.) will be adopted in both the construction and operational phase such that there will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors.
3.3 Affect the welfare of people e.g. by changing living conditions? Yes Socio-economic standard of people will improve due to increased employment opportunities provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area.
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. No Impacts of this type are not expected.
3.5 Any other causes No Not Applicable
4 Production of solid wastes during construction or operation or decommissioning (MT/month)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes No No such spoil, overburden or mine wastes will be generated.
4.2 Municipal waste (domestic and or commercial wastes) Yes The total municipal (domestic) solid waste to be generated is approx. 1480kg/day. Biodegradable waste (@ 30%): 444 kg/day (Waste vegetables and foods etc.) Recyclable waste (@ 60%): 888 kg/day (Papers, cartons, thermocol, plastics, glass etc.) Inert waste (@ 10%) 148 kg/day Total 1480 kg/day
4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes The hazardous wastes along with other wastes in the project will be used oil from DG sets, which is classified as per The Hazardous Waste Category 5.1 as per The Hazardous Wastes (Management & Handling) Rules, 2008. Used oil from DG sets will be stored in HDPE drums in isolated covered facility. This used oil will be sold to authorized recyclers. Suitable care will be taken so that spills/leaks of used oil from storage are avoided.
4.4 Other industrial process wastes No Not applicable
4.5 Surplus product No Not applicable
4.6 Sewage sludge or other sludge from effluent treatment Yes 29.62kg/day of Sludge generated from the STP plant will be dried and later will be used as manure for green belt development.
4.7 Construction or demolition wastes Yes The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc. Recyclable waste construction materials will be sold to recyclers. Unusable and excess construction debris will be disposed at designated places in tune with the local norms.
4.8 Redundant machinery or equipment No Redundant machinery will not be generated.
4.9 Contaminated soils or other materials No Contaminated soils or other materials will not be generated.
4.10 Agricultural wastes Yes Landscape wastes of 0.13kg/acre/day will be generated.
4.11 Other solid wastes No Not Applicable
5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources Yes The project does not envisage any major air pollution sources except operation of DG sets during power failure and vehicular traffic.
5.2 Emissions from production processes No No production processes involved. Hence, there will be no such emissions.
5.3 Emissions from materials handling including storage or transport Yes Small quantities of fugitive emissions are envisaged during transport and handling of construction materials. Such emissions will be temporary and controlled by the use of sprinkling and other viable techniques like covering of loose material.
5.4 Emissions from construction activities including plant and equipment Yes This will be restricted to the construction phase and the construction site only.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Dust is anticipated during loading and unloading of construction material and excavation of upper earth surface. These will however be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission.
5.6 Emissions from incineration of waste No No incineration of wastes is proposed.
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) No Open burning of biomass/other material will be prohibited on site.
5.8 Emissions from any other sources No Not Applicable
6 Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes Source of noise in the operational phase will be from backup DG sets (which will be in operation only during power failure) and pumps & motors. All the machinery will be of highest standard of reputed make and will comply with standard i.e. The maximum permissible sound pressure level for diesel generator with rated capacity up to 1,000 KVA, manufactured on or after 1st January 2005, shall be 75 dB (A) at 1 meter from the enclosure surface as per E (P) Act, GSR 371 (E) and its amendments. Theref
6.2 From industrial or similar processes No No industrial processes will be carried out in the project
6.3 From construction or demolition Yes Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: Concreting, mixing & operation of DG sets. Construction plant and heavy vehicle movement.
6.4 From blasting or piling No No blasting or mechanized piling will be done.
6.5 From construction or operational traffic Yes Some noise will be generated from vehicular movement in the construction and operational phase but that will be mitigated with green belt.
6.6 From lighting or cooling systems No No significant noise impact will result from lighting or cooling systems.
6.7 From any other sources No Not Applicable
7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials No The used oil from DG sets will be carefully stored in HDPE drums at isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous Wastes (Management & Handling) Rules, 2016.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) No There will be no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage will be carried out in a STP of capacity 275 KLD, proposed within the project premises. Treated sewage will be re-used for flushing; landscaping and rest will be discharged to sewer line. External facility will be provided to discharge the excess treated water as per The Water (Prevention and Control of Pollution) Act, 1974.
7.3 By deposition of pollutants emitted to air into the land or into water No The DG Set will be provided with stack of adequate height. Hence dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location.
7.4 From any other sources No Not Applicable
7.5 Is there a risk of long term build up of pollutants in the environment from these sources? No Not Applicable
8 Risk of accidents during construction or operation of the Project, which could affect human health or the environment
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes To deal with any fire related accident, firefighting facility of single handed hydrant valve, long hose reel, and portable fire extinguisher shall be provided.
8.2 From any other causes No Not Applicable
8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The project falls under seismic active Zone IV indicating high damage risk zone. The buildings will be designed as earthquake resistant and comply with the required IS specifications.
9 Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
S.No Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
  • Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
  • housing development
  • extractive industries
  • supply industries
  • Other
Yes Appropriate infrastructure like roads, power supply, waste management and waste water treatment will be developed within the project site. Development of the area will be as per Gurugram Master Plan 2030. Commercial Colony Project will take place. Not Applicable
9.2 Lead to after-use of the site, which could have an impact on the environment No Not Anticipated
9.3 Set a precedent for later developments Yes The project will provide good infrastructure and better life style and will set an example for later developments in the areas.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects No Not Applicable
(III) Environmental Sensitivity
S.No Areas Name/Identity Aerial distance (within 15km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for  their ecological, landscape, cultural or other related value
Yes Sultanpur National Park:9.35 km (W) from the project site
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Yes Rajokri PF:12.5 km (ENE) from the project site
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Yes Sultanpur National Park:9.35 km (W) from the project site Rajokri PF:12.5 km (ENE) from the project site
4 Inland, coastal, marine or underground waters Yes Pre-monsoon depth to water level = 1.53 m to 19.25 m bgl. Post-monsoon depth to water level= 0.43 m to 18.3 m bgl.
5 State, National boundaries Yes 3.8 km (NE) away from the project site
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas Yes SH-15A:3.5 km (SW) away from the project site NH-48:5 km (SSE) away from the project site MDR-136: 7.8 km (W) away from the project site MDR-137: 9.4 km (E) away from the project site NH-148A: 7.5 km (E) away from the project site NH-248A: 6 km (SE) away from the project site Western Peripheral Expressway: 14.2 km (W) away from the project site Dwarka Expressway:0.15 km (W) away from the project site
7 Defence installations No --
8 Densely populated or built-up area Yes Tikampur Village : 3.2 km (NW) away from the project site
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) Yes Tikampur Village:3.2 km (NW) away from the project site Kali Mata Mandir:0.1 km (SW)from the project site Balaji Temple:0.5 km (N) from the project site Tomar Hospital: 0.3 km (N) from the project site Daulatabad PHC: 0.5 km (WNW) from the project site Shanti Niketan Public School: 0.3 km (SSW) from the project site
10 Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) Yes Pre-monsoon depth to water level = 1.53 m to 19.25 m bgl. Post-monsoon depth to water level= 0.43 m to 18.3 m bgl.
11 Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) No --
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects Yes Earthquakes:The site falls under the zone IV as per the Seismic Zone Map of India and is thus prone High damage risk zone. Adequate measures will be taken during the construction of the project.
Document to be attached
1. Upload a copy of PFR Uploaded a copy of PFR.
2. Upload a copy of EMP Uploaded a copy of EMP.
3. Upload Scanned copy of covering letter. Uploaded Scanned copy of covering letter..
4. Upload Additional attached if any(Single PDF) Uploaded Additional attached if any(Single PDF).
5. Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)28/10/2021Kindly submit/upload the complete information/documents in accordance with the Check-list on point to point basis against each Item alongwith Scrutiny Fee according to the Project Cost of your Project in favour of Member Secretary, SEIAA, Haryana in the shape of Bank demand draft payable at Panchkula and the copy of the same may be uploaded; so that further action in the matter may be taken up accordingly.
(2.)20/11/2021The correction have been made as per the instruction received
(3.)25/11/2021To upload the complete information (point wise) as required as per attached Check-list and receipt copies against six monthly compliance reports to SEIAA for the last two years alongwith copy of Scrutiny Fee of your project.EDS Letter
(4.)31/03/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBB Sahu
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)M/S VALUE BUILDCON PVT LTD
AddressA 13A Green Park Main Road 3rd floor New Delhi
Print