Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Prakash Industries Ltd. [Rolling Mill Division Unit # 1]
(b)Name of the Company / Organisation Prakash Industries Limited
(c)Registered Address 15 Km Stone ,Delhi Road , Hissar Haryana,15 Km Stone ,Delhi Road , Hissar Haryana,Bilaspur,Haryana-495006
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Ashok Kumar Chaturvedi
(b)Designation (Owner/ Partner/ CEO) Director ( Corporate Affairs)
(c)Address
(d)Pin code 495006
(e)E-mail akc@prakash.com
(f)Telephone No. 775-2258480
(g)Fax No. 2258612
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/CG/IND/29823/2018
(e)Master Proposal Number(Single Window) SW/229407/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 1
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 130/1, 131/2, 132/2 etc.
(b)Pincode 492009
(c)Bounded Latitudes (North)
From
Degree 21
Minutes 16
Second 7.68
From
Degree 21
Minutes 16
Second 31.85
(d)Bounded Longitudes (East)
From
Degree 81
Minutes 36
Second 14.60
From
Degree 81
Minutes 36
Second 22.51
(e)Survey of India Topo Sheet No. 64 G/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 282
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 5.8
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhRaipurRaipurGogaon
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number OL/TOR/IND/RAIPUR/752
(b)Date of Apply of EC 12 Nov 2018
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Jun 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Jul 2021
Distance of Public Hearing Venue from the Proposed Project :2.0
Pre-Secondary Government School, Sondongari
State :Chhattisgarh
District :Raipur
Tehsil :Raipur
Village :Gogaon
57Employment, Plantation, RWH, Increase the height of school boundary wall, Deepening of ponds, Seating arrangement in cremation ground, Social developmental activitiesOthersAdditional District Magistrate & Upper Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 5680/HO/Tech./CECB/2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Upgradation of existing Rolling Mill # 11.51.02.5OthersLTPARoad
(2.)Upgradation of existing Rolling Mill # 21.80.72.5OthersLTPARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Upgradation of existing Rolling Mill # 11.5 LTPA1.0 LTPA2.5 LTPA
(2.)Upgradation of existing Rolling Mill # 21.8 LTPA0.7 LTPA2.5 LTPA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Mar 2019
(iv)Valid Upto 31 Mar 2022
(v)File No. 7179/TS/CECB/2019
(vi)Application No. 2135977
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 7.0
(b) Funds Allocated for Environment Management (Capital) (in crores) 0
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.07
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.20
(e) Funds Allocated for Environment Management Capital(%) 0.00
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1.853
(b)Existing quantity of raw material/fuel 3.597
(c)Total quantity of raw material/fuel 5.45
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Billets1.853Tons per AnnumPIL ChampaRoad200 Othersfrom PIL ChampaCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube15.88.215.880
(2.)NOxMicro Gram per Meter Cube31.215.431.280
(3.)OthersCOMicro Gram per Meter Cube155896515582000
(4.)PM10Micro Gram per Meter Cube83.156.783.1100
(5.)PM2.5Micro Gram per Meter Cube47.432.647.460
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.07.46.58.5
(2.)TSSmg/l0.50.241.53.0
(3.)Total Hardnessmg/l245164300600
(4.)Fluoridemg/l0.650.321.01.5
(5.)Heavy MetalsIronmg/l0.30.0230.31.0
(6.)Chloridesmg/l168952501000
(7.)TDSmg/l3812185002000
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.07.5A
(2.)DOmg/l6.84.0A
(3.)CODmg/l20.65.8A
(4.)OthersTDSmg/l801268A
(5.)BODmg/l5.51.8A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))704875
(2.)Leq(Night)A-weighted decibels(dB(A))583670
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.66.9
(2.)N(Nitrogen)Kilogram per hectare375129
(3.)K(Potassium)Kilogram per hectare371175
(4.)Electric ConductivityMillisiemens per Centimetre188144
(5.)P(Phosphorus)Kilogram per hectare7245
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.75 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.56 To 7.86
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA/NOC/IND/REN/1/2021/6042
(f)Date of Issue 30 Mar 2020
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater260Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/REN/1/2021/604230 Mar 202026
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)sanitary wastewater000OthersNA00
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mill ScaleIndustrial Waste3400Tons200RoadOtherssent to champa plant
(2.)End cuttingIndustrial Waste10200Tons200RoadOtherssent to champa plant
(3.)Miss RollsIndustrial Waste1700Tons200RoadOtherssent to champa plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube31.252511.542.780
(2.)PM2.5Microgram per Meter Cube47.45251.0348.4360
(3.)PM10Microgram per Meter Cube83.15251.7284.82100
(4.)SO2Microgram per Meter Cube15.85254.019.880
(5.)Others(Specify)COMicrogram per Meter Cube15585254.61562.62000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Stack to gasifier & Mill 2Coal352.0SO25.8
(2.)Stack to gasifier & Mill 1Coal352.2PM101.2
(3.)Stack to gasifier & Mill 2Coal352.0PM101.0
(4.)Stack to gasifier & Mill 2Coal352.0NOx6.8
(5.)Stack to gasifier & Mill 1Coal352.2SO25.8
(6.)Stack to gasifier & Mill 1Coal352.2NOx8.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 11000
(b)Source Chhatisgarh State Electricity Board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 13.78
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 13.78
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 178.356
(b)Waste/Barren Land 16.366
(c)Grazing/ Community Land 34.736
(d)Surface Water Bodies 19.706
(e)Settlements 53.106
(f)Industrial 24.048
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : land for plotting & Stone quary 7.682
    Total 334
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant3.84
(2.)Green belt4.65
(3.)Built Up Area2.63Storage area
(4.)Water Reservoir0.22
(5.)OthersInternal roads & Misc.2.44Internal roads & Misc.
Total 13.78
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0Nil within 10 Kms. radius
(2.)Wildlife CorridorsNA0Nil within 10 Kms. radius
(3.)WLSNA0Nil within 10 Kms. radius
(4.)NPANA0Nil within 10 Kms. radius
(5.)ESAsNA0Nil within 10 Kms. radius
(6.)ESZsNA0Nil within 10 Kms. radius
(7.)Critically Polluted AreaRaipur3.0Raipur
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0Nil within 10 Kms. radius
(2.)ForestNA0Nil within 10 Kms. radius
(3.)Archaeological SitesNA0Nil within 10 Kms. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 13.78
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total lland in possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Stream passing on SW corner of the plant
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kharun River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 5.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt4.6504
(2.)Percentage of Total Project Area33033
(3.)No. of Plants625010007250
(4.)Funds Allocated20000050000250000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialsocio economic status of people will improve
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0149
(ii)Name of the EIA Consultant Pioneer Enviro Laboratories and Consultants Pvt Lt
(iii)Address nd Floor, A-Z Elite, Plot No. 197, Kavuri Hills, Guttala Begumpet Village, Madhapur, Hyderabad, Telangana - 500081
(iv)Mobile No. 9440677333
(v)Landline No. 0402311427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAshok Kumar Chaturvedi
DesignationDirector ( Corporate Affairs)
Name of Company (Applicant Name should not be given here)Prakash Industries Limited
Address15 Km Stone ,Delhi Road , Hissar Haryana
Print