|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. ABHINAV MULTICHEM PVT. LTD. | (b)Name of the Company / Organisation | ABHINAV MULTICHEM PVT. LTD | (c)Registered Address | Plot no. 1006, Naroda industrial estate, Ahmedabad,,Ahmedabad,Gujarat-382330 | (d)Legal Status of the Company | Private | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sahil Yogeshbhai Agrawal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Plot no. 1006, Naroda industrial estate, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-382330 | (d)Pin code | 382330 | (e)E-mail | amcpl13@gmail.com | (f)Telephone No. | 0- | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a)Major Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| (b)Minor Project/Activity | NIL | (c)Category | B1 | (d)Proposal Number | SIA/GJ/IND2/66920/2021 | (e)Master Proposal Number(Single Window) | SW/226347/2021 | (f)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (g)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1006 | (b)Pincode | 382330 | (c)Bounded Latitudes (North) | | From | | Degree | 23 | Minutes | 5 | Second | 55.77 | From | | Degree | 23 | Minutes | 5 | Second | 56.38 | (d)Bounded Longitudes (East) | | From | | Degree | 72 | Minutes | 40 | Second | 43.50 | From | | Degree | 72 | Minutes | 40 | Second | 46.55 | (e)Survey of India Topo Sheet No. | 000 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 45 | (h)Uploaded (kml) File | Copy of Kml File ![](../images/download.png) | (i)Distance of Nearest HFL from the project boundary within the study area | 55 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Ahmedabad | Ahmedabad City | Naroda Industrial Estate | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/GJ/15602/2021 | (b)Date of Apply of TOR | 02 Feb 2021 | (c)Date of Issue of TOR / Standard ToR | 05 Feb 2021 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Project is within GIDC. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Spray Dryer | 1500 LPH | | (2.) | Vessel | 5 KL | 5 Nos. | (3.) | Vessel | 10 KL | 3 Nos. | (4.) | Vessel | 2 KL | 3 Nos. | (5.) | Boiler | 1 TPH | 1 No. | (6.) | Hot air Generator | 12 Lac Kcal/hr | 1 No. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Reactive Dyes( Black, Red, Orange, Golden Yellow, Blue, Violet, magenta) | 1080 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in crores) | 3.0 | (b) Funds Allocated for Environment Management (Capital) (in crores) | 0.5815 | (c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) | 0.06 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) | 0.924 | (e) Funds Allocated for Environment Management Capital(%) | 19.38 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1847.25 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 1847.25 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 5 Sulfo Anthranilic Acid | 50 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (2.) | SBC | 78.8 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (3.) | Para Anisidine | 28.4 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (4.) | NaHCO3 | 108 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (5.) | Sulfo Vs | 102.4 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (6.) | 4B Acid | 25.2 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (7.) | K Acid | 85.5 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (8.) | MPDSA | 45.9 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (9.) | ACETIC ANHYDRATE | 70.9 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (10.) | Copper sulfate | 67.5 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (11.) | Cynuric Chloride | 45 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (12.) | HCL | 45 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (13.) | Hydrogen Peroxide | 67.5 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (14.) | J Acid | 43.9 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (15.) | MUA | 33.8 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (16.) | N Methyl Aniline | 14.6 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (17.) | Salt | 270 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (18.) | Soda Ash | 56.3 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (19.) | Sodium Nitrate | 7.9 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (20.) | STA | 55.1 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (21.) | Sulfo Pyridine | 66.6 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (22.) | 4 ADAPSA | 427.5 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (23.) | Caustic Flakes | 33.8 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (24.) | H acid | 101.3 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | (25.) | Sulfamic Acid | 0.2 | Tons per Annum | | Open Market | Road,Rail | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Nov 2020 To 31 Jan 2021 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.52 | 39.76 | 88.62 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 61.43 | 30.89 | 60.74 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 20.42 | 10.25 | 19.86 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 28.74 | 20.32 | 27.51 | 80 | |
14.2. No. of Ground Water Monitoring Locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 483 | 354 | 600 | 600 | (2.) | Fluoride | | | mg/l | | 1.16 | 0.73 | 1.5 | 1.5 | (3.) | Chlorides | | | mg/l | | 455 | 338 | 1000 | 1000 | (4.) | pH | | | NA | | 7.94 | 7.14 | 6.5 | 8.5 | (5.) | TDS | | | mg/l | | 1473 | 1128 | 2000 | 2000 | (6.) | TSS | | | mg/l | | 0.30 | 0.1 | 0.2 | 0.5 | |
14.3. No. of Surface Water Monitoring Locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.12 | 7.64 | D | (2.) | DO | | mg/l | | 6.2 | 5.4 | D | (3.) | COD | | mg/l | | 35 | 10 | D | (4.) | BOD | | mg/l | | 8.5 | 4 | D | |
14.4. No. of Ambient Noise Monitoring Locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 73.5 | 48.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 66.2 | 50.5 | 70 | |
14.5. No. of Soil Sample Monitored Locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 70.80 | 61.7 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 25.4 | 18.2 | (3.) | Electric Conductivity | Centimeter per Second | | 1410 | 1204 | (4.) | K(Potassium) | Milligram per Kilogram | | 63 | 52 | (5.) | pH | | | 8.07 | 7.46 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 7 To 9 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water | 23 | 2 | Copy of Permission Letter | Pipeline | | Others | GIDC Water Supply | 000 | 11 May 2021 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial Projects - 2 | 2.0 | 5 | P,S,T | Others | Disposed through in house Spray dryer | 0 | 2.0 | |
|
16.1. | (a)Total Waste Water Generation | 2 | (b)Total Discharged Water | 2 | (c)Total Reused Water | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spray Dryer Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Tons | 20 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Discarded Container Empty Bags with liner | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Tons | 20 | Road | | Authorized Recyclers | | (3.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.2 | Tons | 20 | Road | | Others | Reuse within premises | (4.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 15 | Tons | 20 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 55.76 | 0.75 | 0.26 | 56 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 18.51 | 0.75 | 0.17 | 18.68 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 85.7 | 0.75 | 0.3 | 85.9 | 100 | (4.) | NOx | | Microgram per Meter Cube | 29.74 | 0.75 | 29.86 | 0.75 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler (1TPH) | PNG (600 SCM/Day) | 30 | 0.2 | | | | (2.) | Hot Air generator 12 lac Kcal/Hr | PNG | 30 | 0.2 | | | | (3.) | Spray Dryer- 1500 LPH | NA | 30 | 0.2 | PM10 | | 150 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 450 | (b)Source | Uttar Gujarat Vij Company Limited | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land | 00 | (b)Private Land | 0.1000 | (c)Government Land | 00 | (d)Revenue Land | 00 | (e)Other Land | 00 | Total Land | 0.1000 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area | 00 | (b)Waste/Barren Land | 00 | (c)Grazing/ Community Land | 00 | (d)Surface Water Bodies | 00 | (e)Settlements | 00 | (f)Industrial | 0.1000 | (g)Forest | 00 | (h)Mangroves | 00 | (i)Marine Area | 00 | (j)Others : NA | 00 | Total | 0.1 | |
|
22. Land Requirement for Various Activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement | Remarks |
---|
(1.) | Main Plant | | 0.1000 | NA | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 50 | Not in study Area | (2.) | ESAs | NA | 50 | Not in study Area | (3.) | Wildlife Corridors | NA | 50 | Not in study Area | (4.) | ESZs | NA | 50 | Not in study Area | (5.) | Critically Polluted Area | NA | 50 | Not in study Area | (6.) | NPA | NA | 50 | Not in study Area | (7.) | Corridors | NA | 50 | Not in study Area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 30 | Not in study Area | (2.) | Defence Installations | | Gandhinagar | 30 | Not in study Area | (3.) | Forest | | NA | 30 | Not in study Area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.1000 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | GIDC land | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in Rs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 10 | (b)Permanent Employment-During Operation | 5 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 300 | (f)Total Manpower | 30 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt (in hectare) | 0.0200 | (b)Percentage of Total Project Area | 20.00 | (c)No. of Plants to be Planted | 500 | (d)Funds Allocated for Plantation | 115000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | This Proposed project is adequate to the environment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 20606 of 2017 | (ii)Name of the EIA Consultant | Satva Environ Consultancy | (iii)Address | 14, 15 Gopal Patel Estate, First floor, Opp- Baroda Express Highway CTM, Ahmedabad | (iv)Mobile No. | 9426347013 | (v)Landline No. | 0792585321 | (vi)Email Id | satvaenviron@gmail.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 19 Oct 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Details Sought |
---|
S. No. | EDS Sought Date | EDS Sought | Letter |
---|
(1.) | 05/10/2021 | Submit a certificate of no plagiarism by running a plagiarism test in a suitable software and submit the requisite report along with EIA/EMP report as per the MoEF&CC’s OM F. No. 22-17/2020-IA.III dated 07.07.2020.
2. submit existing plant CCA in name of proposed unit instead of sunflex chemical.
3. submit SEAC B1 project prescribed SEAC format and baseline data format for P-s data as per prescribed by SEAC along with legal action in last three year and its compliance, public complaint against unit and legal court case status. | | (2.) | 15/12/2021 | The correction have been made as per the instruction received | | (3.) | 20/12/2021 | Pl. submit valid CCA in name of proposed expansion project for existing plant. | | |
Addtional Details Sought |
---|
S. No. | ADS Sought Date | ADS Sought | Letter |
---|
NO Record | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sahil Yogeshbhai Agrawal | Designation | Director | Name of Company (Applicant Name should not be given here) | ABHINAV MULTICHEM PVT. LTD | Address | Plot no. 1006, Naroda industrial estate, Ahmedabad |
|