Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. ABHINAV MULTICHEM PVT. LTD.
(b)Name of the Company / Organisation ABHINAV MULTICHEM PVT. LTD
(c)Registered Address Plot no. 1006, Naroda industrial estate, Ahmedabad,,Ahmedabad,Gujarat-382330
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Sahil Yogeshbhai Agrawal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot no. 1006, Naroda industrial estate, Ahmedabad,,Ahmedabad City,Ahmedabad,Gujarat-382330
(d)Pin code 382330
(e)E-mail amcpl13@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/66920/2021
(e)Master Proposal Number(Single Window) SW/226347/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1006
(b)Pincode 382330
(c)Bounded Latitudes (North)
From
Degree 23
Minutes 5
Second 55.77
From
Degree 23
Minutes 5
Second 56.38
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 40
Second 43.50
From
Degree 72
Minutes 40
Second 46.55
(e)Survey of India Topo Sheet No. 000
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 45
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 55
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAhmedabadAhmedabad CityNaroda Industrial Estate
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/15602/2021
(b)Date of Apply of TOR 02 Feb 2021
(c)Date of Issue of TOR / Standard ToR 05 Feb 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is within GIDC.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Spray Dryer1500 LPH
(2.)Vessel5 KL5 Nos.
(3.)Vessel10 KL3 Nos.
(4.)Vessel2 KL3 Nos.
(5.)Boiler1 TPH1 No.
(6.)Hot air Generator12 Lac Kcal/hr1 No.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Reactive Dyes( Black, Red, Orange, Golden Yellow, Blue, Violet, magenta)1080Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 3.0
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.5815
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.924
(e) Funds Allocated for Environment Management Capital(%) 19.38
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1847.25
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1847.25
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)5 Sulfo Anthranilic Acid50Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(2.)SBC78.8Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(3.)Para Anisidine28.4Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(4.)NaHCO3108Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(5.)Sulfo Vs102.4Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(6.)4B Acid25.2Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(7.)K Acid85.5Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(8.)MPDSA45.9Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(9.)ACETIC ANHYDRATE70.9Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(10.)Copper sulfate67.5Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(11.)Cynuric Chloride45Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(12.)HCL45Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(13.)Hydrogen Peroxide67.5Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(14.)J Acid43.9Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(15.)MUA33.8Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(16.)N Methyl Aniline14.6Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(17.)Salt270Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(18.)Soda Ash56.3Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(19.)Sodium Nitrate7.9Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(20.)STA55.1Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(21.)Sulfo Pyridine66.6Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(22.)4 ADAPSA427.5Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(23.)Caustic Flakes33.8Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(24.)H acid101.3Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
(25.)Sulfamic Acid0.2Tons per AnnumOpen MarketRoad,Rail50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2020 To 31 Jan 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.5239.7688.62100
(2.)PM2.5Micro Gram per Meter Cube61.4330.8960.7460
(3.)SO2Micro Gram per Meter Cube20.4210.2519.8680
(4.)NOxMicro Gram per Meter Cube28.7420.3227.5180
    14.2.     No. of Ground Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l483354600600
(2.)Fluoridemg/l1.160.731.51.5
(3.)Chloridesmg/l45533810001000
(4.)pHNA7.947.146.58.5
(5.)TDSmg/l1473112820002000
(6.)TSSmg/l0.300.10.20.5
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.127.64D
(2.)DOmg/l6.25.4D
(3.)CODmg/l3510D
(4.)BODmg/l8.54D
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))73.548.575
(2.)Leq(Night)A-weighted decibels(dB(A))66.250.570
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram70.8061.7
(2.)P(Phosphorus)Milligram per Kilogram25.418.2
(3.)Electric ConductivityCentimeter per Second14101204
(4.)K(Potassium)Milligram per Kilogram6352
(5.)pH8.077.46
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 7 To 9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water232Copy of Permission LetterPipelineOthersGIDC Water Supply00011 May 202125
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Projects - 22.05P,S,TOthersDisposed through in house Spray dryer02.0
16.1.
(a)Total Waste Water Generation 2
(b)Total Discharged Water 2
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spray Dryer SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Container Empty Bags with linerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons20RoadAuthorized Recyclers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.2Tons20RoadOthersReuse within premises
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15Tons20RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube55.760.750.265660
(2.)SO2Microgram per Meter Cube18.510.750.1718.6880
(3.)PM10Microgram per Meter Cube85.70.750.385.9100
(4.)NOxMicrogram per Meter Cube29.740.7529.860.7580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (1TPH)PNG (600 SCM/Day)300.2
(2.)Hot Air generator 12 lac Kcal/HrPNG300.2
(3.)Spray Dryer- 1500 LPHNA300.2PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 450
(b)Source Uttar Gujarat Vij Company Limited
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 0.1000
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 00
    Total Land 0.1000
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 0.1000
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : NA 00
    Total 0.1
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.1000NA
Total 0.1
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA50Not in study Area
(2.)ESAsNA50Not in study Area
(3.)Wildlife CorridorsNA50Not in study Area
(4.)ESZsNA50Not in study Area
(5.)Critically Polluted AreaNA50Not in study Area
(6.)NPANA50Not in study Area
(7.)CorridorsNA50Not in study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA30Not in study Area
(2.)Defence InstallationsGandhinagar30Not in study Area
(3.)ForestNA30Not in study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.1000
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired GIDC land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 10
(e)No. of working days 300
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.0200
(b)Percentage of Total Project Area 20.00
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 115000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThis Proposed project is adequate to the environment.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 20606 of 2017
(ii)Name of the EIA Consultant Satva Environ Consultancy
(iii)Address 14, 15 Gopal Patel Estate, First floor, Opp- Baroda Express Highway CTM, Ahmedabad
(iv)Mobile No. 9426347013
(v)Landline No. 0792585321
(vi)Email Id satvaenviron@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Oct 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)05/10/2021Submit a certificate of no plagiarism by running a plagiarism test in a suitable software and submit the requisite report along with EIA/EMP report as per the MoEF&CC’s OM F. No. 22-17/2020-IA.III dated 07.07.2020. 2. submit existing plant CCA in name of proposed unit instead of sunflex chemical. 3. submit SEAC B1 project prescribed SEAC format and baseline data format for P-s data as per prescribed by SEAC along with legal action in last three year and its compliance, public complaint against unit and legal court case status.
(2.)15/12/2021The correction have been made as per the instruction received
(3.)20/12/2021Pl. submit valid CCA in name of proposed expansion project for existing plant.
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSahil Yogeshbhai Agrawal
DesignationDirector
Name of Company (Applicant Name should not be given here)ABHINAV MULTICHEM PVT. LTD
AddressPlot no. 1006, Naroda industrial estate, Ahmedabad