| Form-1 | | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | | | 1. Basic Informations | | Project Name | Proposed Construction of Residential Quarters - Expansion at Chennai Airport at GLR No.386-6,386-2( Survey No.61/A - Part, 63/1 - Part, 63/2- Part, 64, 65/1, 65/2,Palvanthangal) GLR 395-1(Survey No. 69/1A, 69/1B, 69/1C,Nanganallur) GLR No. 387/23B, 387/23( Survey No.2 Meenambakkam),at Meenambakkam village, St. Thomas Mount-cum-Pallavaram Cantonment, Chennai District | Company/Organisation Name | AIRPORT AUTHORITY OF INDIA | | Registered Address | Residential Headquarters
Airport Authority of India
Meenambakkam Chennai Tamil Nadu 600016 | Legal Status of the Company | Central PSU |
| | 2. | | Address for the correspondence: | | (a)Name of the Applicant | PANICKER S G | | (b)Designation (Owner/ Partner/ CEO) | General Manager | | (c)Address | Airports Authority of India Operational Office,Southern Chennai Airport,Malad,Chennai,Tamil Nadu-600027 | | (d)Pin code | 600027 | | (e)E-mail | aaiproject2021@gmail.com | | (f)Telephone No. | 44-22561021 | | (g)Fax No. | | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 8(a) Building and Construction projects
| | (b)Minor Project/Activity | NIL | | (c)Category | B2 | | (d)Proposal Number | SIA/TN/MIS/224126/2021 | | (e)Master Proposal Number(Single Window) | SW/224125/2021 | | (f)EAC concerned (for category A Projects only) | INFRA-2 | | (g)Project Type(New/Expansion/Modernization) | Fresh EC |
|
| | 4. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Tamil Nadu | |
| | Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Tamil Nadu | Chennai | Mambalam Guindy | Meenambakkam | | | 5. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (c)Reason | -1 | | (d)Supporting Document | NILL | |
| | Location of the project | Meenambakkam Village,St.Thomas Mount-cum-Pallavaram Cantonment,Chennai | | | Town / Village (Name of more than one town may be entered by separating with) | Meenambakkam | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | GLR No.386-6,386-2( Survey No.61/A - Part, 63/1 - Part, 63/2- Part, 64, 65/1, 65/2,Palvanthangal) GLR 395-1(Survey No. 69/1A, 69/1B, 69/1C,Nanganallur | | State | Tamil Nadu | District | Chennai | | Tehshil | Mambalam Guindy | Pincode | 600016 | | Nearest railway station | Meenambakkam Railway Station | Distance from the project site | 0.07 | | Nearest airport | Chennai International Airport | Distance from the project site | 0.05 | | Nearest Town/City/District Headquarters | Site is Inside City | Distance from the project site | 0.01 | | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Office of the Cantonment Board, St. Thomas Mount cum Pallavaram
N Parade Rd, St.Thomas Mount, Tamil Nadu 600016. | Upload GPS file | Copy of Kml File  Uploaded GPS file | | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | | Brief summary of project | Uploaded Brief summary of project | | | | Does your project location falls under out of any following areas | None of above Areas | | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 120713.02 | Existing Built Up Area(In Meter /Sqr) | 19876 | | Does it attract any of the general conditions given below? | No | | | | Does it attract the specific condition given below? | No | | | | Interlinked Projects | No | | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | | Whether there is any Government Order/Policy relevent/relating to the site? | Yes | Upload Order/Policy | Uploaded Order/Policy | | Forest land involved(hectares) | nil | | | | Is there any litigation pending against the project? | No | | |
| 1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | There will not be any change in the land use, land cover or topography as the site is categorized as Primary Residential Land. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | The existing 35 Nos of building will be demolished and remaining 10 Nos buildings will be retained.
List of demolition building and its quantity of waste along with Site layout is attached as Annexure 3.
As per the advice of Department of Forest, some of the trees will be cut and most of the existing trees will be retained.
However maximum care taken to Transplants the Trees in vacant lands.
Moreover, we are going to plant 1350 trees/new plants in the landscape area will be mainta | | 1.3 | Creation of new land uses? | No | No creation of new land use, as the site involves only construction of residential Units. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil Testing has been done to find the suitability of soil for providing adequate foundations for the proposed structures and the copy of the report is given in Annexure 6. | | 1.5 | Construction works? | Yes | Construction of 704 Units utilizing latest Prefab technology will be done systematically with Green Building GRIHA Council (Green Rating for Integrated Habitat Assessment) and economy of materials. | | 1.6 | Demolition works? | Yes | The existing 35 Nos. of old building will be Demolished in the existing land area.
Demolished Certificate is attached as Annexure 4.
The demolition waste will be collected and disposed through MSTC (Metal Scrap Trade Corporation) as well guidelines issued by cantonment board and suitable agency will be deployed through MSTC | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | Local manpower will be utilized. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | Above ground structures:
1. Stilt + 5 floors - 10 Nos.
2. Stilt + 6 floors - 6 Nos.
3. Stilt + 7 floors - 3 Nos.
4. Director Villas (G+1) - 2 Nos.
5. Multi level Car parking (G+3) - 1 No. of 416 car parks.
Total : 22 Nos. of Blocks
No basement and underground structures. | | 1.9 | Underground works including mining or tunneling? | No | No underground works will be required as the proposed project is the construction of residential units. | | 1.10 | Reclamation works? | No | Not envisaged. | | 1.11 | Dredging? | No | Not envisaged. | | 1.12 | Offshore structures? | No | Not envisaged. | | 1.13 | Production and manufacturing processes? | No | Not applicable as the project is construction of residential units. | | 1.14 | Facilities for storage of goods or materials? | Yes | Temporary sheds will be constructed for the storage of cement and other materials during construction phase.
Due measures will be taken to avoid any runoff of storage materials viz., cement, sand etc., | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | No | a. Waste water:
Operation Phase:
Existing: Sewage generation is 13.8 KLD (retaining) and 106.2 KLD (Demolishing) and it is being treated through existing 240 KLD STP. Treated water is being used for flushing and Greenbelt development.
Photos for STP is attached as an Annexure 7
Construction Phase:
Proposed:
The sewage generation will be 14 KLD and it will be treated in Existing STP of 240 KLD Capacity.
Operation Phase:
After Expansion: Estimated Sewage generation will be 469 KLD w | | 1.16 | Facilities for long term housing of operational workers? | No | No long-term operational workers are involved in this project. | | 1.17 | New road, rail or sea traffic during construction or operation? | No | The existing road network is sufficient for connectivity of the site with other parts of the city. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | There will be no change to the existing transport infrastructure. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | As construction works will be carried out within a specified area, there is no need for closure or diversion of existing transport routes. | | 1.20 | New or diverted transmission lines or pipelines? | No | No new or diversion transmission lines & pipelines are required in this project. | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | There will not be any alteration in the hydrology of the watercourses or aquifers due to the proposed project. | | 1.22 | Stream crossings? | No | There is no stream crossing in the project site. | | 1.23 | Abstraction or transfers of water from ground or surface waters? | Yes | Total Fresh Water requirement 541 KLD will be met through CMWSSB. Approval letter is attached as Annexure 11.
Present water is sourced from open wells and bore wells. | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | There is no change in the water bodies or land surface which affects the drainage or runoff. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Required personnel & construction / Demolition materials/waste during construction/demolition phase will be transported through existing roads only. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | As part of this project, no long-term dismantling or decommissioning or restoration works would be involved.
Demolition quantity is attached as an Annexure 3. | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | There will not be any decommissioning works. | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | S No Population Influx No's
1 Existing Population 376
2 Expected Increase in Population influx 4646
Total Population (Existing + Proposed) 5022
Construction Phase: 350 Nos | | 1.29 | Introduction of alien species? | No | No introduction of alien species. | | 1.30 | Loss of native species or genetic diversity? | Yes | As per the advice of Department of Forest, some of the trees will be cut and most of the existing trees will be retained.
However maximum care taken to Transplants the Trees in vacant lands.
Moreover, we are going to plant 1350 trees/new plants in the landscape area will be maintain the greenery in the proposed project.
Refer Tamil Nadu Forest Department letter in Annexure 5. | | 1.31 | Any other actions? | No | Only eco-friendly activities like tree plantation will be undertaken. | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | There is no agricultural land. | | 2.2 | Water (expected source & competing users) unit: KLD | Yes | Total water Requirement – 541 KLD
Name of the Block Water Requirement (lpcd) Waste Water Generation (lpcd)
Domestic Toilet Flushing Domestic Toilet Flushing
Proposed Area - Phase - I & II
Type-B 21600 10800 17280 10800
17280 8640 13824 8640
Type - C 25920 12960 20736 12960
Director Villa 540 270 432 270
Type -B 86400 43200 69120 43200
30240 15120 24192 15120
Type -C 51840 25920 41472 25920
60480 30240 48384 30240
Type -D 21600 10800 17280 10800
12960 6480 10368 6480
Type -E | | 2.3 | Minerals (MT) | No | No usage of mineral is envisaged. | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | The approximate consumption of cement, steel, sand, etc. are given below.
Cement - 12,939 MT
Sand - 20,843 m3
Concrete - 32,550 m3
Bricks - 15,01,500 Nos
Steel - 4,450 MT | | 2.5 | Forests and timber (source – MT) | No | Usage of timber will be Nil. We are using UPVC Windows and Galvanized Plain sheet doors. | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | Total power requirement -7815 KVA
Description Existing Proposed After Expansion Remarks
Power 250 7565 7815 TANGEDCO
Backup 125x2 750x2 7815 DG Sets
Fuel (KL/month) 0.2
1.0 1.20 HSD | | 2.7 | Any other natural resources (use appropriate standard units) | No | There is no need for other natural resources | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | No such materials will be required for this project. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | There will not be any occurrence of diseases as activities are confined to construction | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | As the construction is a Residential Quarters, it will give much easier access to the employees to their work place. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | There is no vulnerable group of people who could be affected by the project. | | 3.5 | Any other causes | No | Nil | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | There will not be any spoil, overburden or mine wastes. | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The quantity of Municipal Solid Waste generated from the proposed project will be 3013.2 kg/day.
Construction Phase:
Manpower: 350 Nos
Description Total Kg/day Disposal methods
Organic 52.5 Disposed through local Bins
Inorganic 35.0 Disposed through authorized recyclers
Total 87.5
Operation phase:
Existing population – 376 Nos.
Proposed Population influx - 4646 Nos.
After Expansion - 5022 Nos.
Description Existing (Kg/day) Proposed (Kg/day) Total (Kg/day) Disposal methods
Organ | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | The estimated quantity of Hazardous waste generation from the proposed project
Description Existing Proposed After Expansion Disposal methods
Used oil (TPA) 0.45 0.85 1.3 Disposed to TNPCB authorized re-processors | | 4.4 | Other industrial process wastes | No | Not envisaged | | 4.5 | Surplus product | No | Not applicable since this is a residential construction project | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Capacity of 750 KLD STP unit will be constructed in the project site, 30 kg/day sludge will be converted into manure utilized for green belt development. | | 4.7 | Construction or demolition wastes | Yes | Construction waste will be used in land filling and road pavements in the surrounding low-lying areas. | | 4.8 | Redundant machinery or equipment | No | Most of the equipments used during construction phase will be hired. | | 4.9 | Contaminated soils or other materials | No | There is no source for contamination of soils or other materials. | | 4.10 | Agricultural wastes | No | Does not arise | | 4.11 | Other solid wastes | No | No other waste generation expected. | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | Construction Phase:
Movement of construction vehicles like lorries, trucks, dumpers, roller, excavator, HVM, etc would result in air pollution. During the operation phase, the movement of vehicles in and around the project site also increases the emission load. All vehicles used during construction phase will have PUC certificate.
Operation Phase:
The DG sets provided for power back up will also generate air pollutants like NOx.
Separate DG yards will be provided within the site and adequa | | 5.2 | Emissions from production processes | No | Does not arise since the proposed project is a residential development. | | 5.3 | Emissions from materials handling including storage or transport | Yes | Emissions like dust will arise during the transportation of materials and the dust will be controlled by slow movement of vehicles, covering the materials properly and water spraying. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | Marginal quantity of emission is expected from construction activities which will be controlled by suitable control measures like water spraying. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust emission will be arrested by water spraying and covering the stored materials with tarpaulin cover.
Sewage generated during construction phase will be treated through existing 240 KLD STP and the treated water will be used for greenbelt development. | | 5.6 | Emissions from incineration of waste | No | There are no incineration activities | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | No such activities will be carried out. | | 5.8 | Emissions from any other sources | No | Existing community hall which generates emission from the kitchen is going to be demolished. | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | Construction Phase:
The machinery which will be used for construction will be of highest standard of reputed make and will adhere to international standards. Hence insignificant impacts due to construction machinery are envisaged.
Operation Phase:
Source of noise in the operational phase will be DG sets and vehicular sources only. The DG sets will be in operation during power failure duration only. Moreover, the DG room shall be acoustically enclosed. | | 6.2 | From industrial or similar processes | No | Not Applicable | | 6.3 | From construction or demolition | Yes | Noise levels in the range of 75-85 dB (A) will be generated occasionally during the construction and demolition activities. Workers in the noisy areas will be provided with earmuffs and earplugs. | | 6.4 | From blasting or piling | No | Not applicable | | 6.5 | From construction or operational traffic | Yes | Construction phase:
During construction phase construction materials will be transported by road, through well maintained vehicles to control noise, vibration and emissions.
Operation Phase:
During operational phase traffic noise and emissions will be increased slightly that will be minimized by paving roads with asphalt / concrete, well maintained vehicles, slow movement of vehicles and by planting trees.
Noise modeling contour report is attached as an Annexure 12. | | 6.6 | From lighting or cooling systems | No | Adequate enclosures, tree plantations will be provided | | 6.7 | From any other sources | Yes | Since the project site is located near to Airport and Railway line. Noise modelling report is attached as Annexure 12.
The intensity of noise within the site will be reduced by providing adequate green cover. | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | There will be no handling of hazardous materials | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | Yes | Estimated Sewage generation will be 469 KLD which will be treated through proposed 750 KLD capacity STP unit and treated water will be used for flushing and green belt development and excess amount of sewage will be used for maintaining the Avenue Plantation. | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | There will be minimal emission of pollutants from the project site. | | 7.4 | From any other sources | No | No other polluting sources exist. | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | There will not be any long term build up of pollutants in the environment from these sources | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | No hazardous substances will be required either during construction or operation phases. However adequate safety measures to mitigate all risks anticipated out of fire in diesel will be taken care off by installing suitable fire fighting system.
Fire fighting layout is attached as an Annexure 14. | | 8.2 | From any other causes | No | No risks from any other sources. | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The area under study falls in Zone-III (moderate) according to the Indian Standard Seismic Zoning Map.
The structure is designed to be earthquake resistant.
Flood:
The site was affected in 2015 flood. Suitable measures are incorporated in design stage. | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | Housing will develop in and around the area.
Proposed infrastructure like roads, power supply, etc. will not create any impact on the environment. | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | No impact will be seen due to the proposed activity | | 9.3 | Set a precedent for later developments | No | No impact is seen due to the proposed activity | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not applicable | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Monuments
Description Distance Direction
Wellesley House (Built in 1798) Block No.IV/13 Fort St. George 14.99km NE
Garrisons Engineer’s Depot Block No.IV Fort St. George 14.97km NE
Adyar Banyan Tree 9.63km ENE
Megalithic cist Tiruneermalai 7.20km WSW
Urn burial and megalithic site St. Thomas Mount 2.30km NE
Megalithic cists and cairns Tirusulam 1.56km SSW
Megalithic cists and cairns Pallavaram 2.86km S
Megalithic cists and cairns Pallavaram 2.74km SSW
Group of cairns Nanmangalam 6.45k | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | Yes | Envi
Description Distance Direction
Adyar River 1.26km N
Guindy National Park/Guindy Park RF 3.87km ENE
Pallikaranai Marshland 4.56km ESE
Nanmangalam RF 5.51km S
Buckingham Canal 7.32km ENE
Pulikkuradu RF 7.66km WSW
Okkiyam Maduvu 8.18km SE
Cooum/Kuvam R 8.33km NNW
Tambaram RF 8.86km SW
Bay of Bengal 9.30km E
Chembarambakkam Tank 10.25km W
Perumbakkam RF 10.65km S
Erumaiyur RF 11.16km WSW
Maduraippakkam RF 11.54km S
Vandalur RF 11.78km SW
Otteri Nala 11.85km NNE
Nallur RF 11.95 | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Pallikaranai Birds Watching Point~ 5.38km (SE)
Pallikaranai Marshland~4.56km (ESE) | | 4 | Inland, coastal, marine or underground waters | Yes | Water Bodies
Description Distance Direction
Korattur Tank 13.77km N
Ambattur Tank 12.48km NNW
Velachery Lake 2.44km E
Nanmangalam Lake 5.04km SSW
Periya Eri 6.01km WSW
Perumbakkam Lake 9.10km S | | 5 | State, National boundaries | No | No such areas within 15 Km radius | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | Arignar Anna Zoological Park~13.17km (SW)
Guindy National Park ~3.87kn (ENE)
Sri Dhanupuriswara Temple Madambakkam~9.78km (S)
Adyar Banyan Tree ~ 9.63 (ENE) | | 7 | Defence installations | Yes | Description Distance Direction
INS Adyar 14.86km NE
Tambaram Airforce St 9.38km SSW
Officers Training Academy(OTA) 1.21km NE
Raj Bhavan 4.98km ENE | | 8 | Densely populated or built-up area | Yes | Description Distance Direction
Minambakkam Site Inside Minambakkam
Palavantangal Adjacent to Site E
Naganallur 0.07 S
Tirusulam 1.22km WSW
Adambakkam 1.29km E | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Schools Distance Direction
Government Higher Sec School Kovilambakkam 4.91km SSE
Government Primary School Periya Kovilambakkam 4.80km SSE
Government School Purushothaman Nagar 5.59km SW
Colleges Distance Direction
Government Arts and Science College Perumbakkam 11.19km SSE
Tamil Nadu Open University 5.96km NE
Institute of Advanced Study in Education 6.06km NE
Hospitals Distance Direction
Government Primary Health Center Hospital Old Pallavaram 3.01km SSW
Government Hospital Tambaram | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | No such areas within 15 Km radius | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | No such areas within 15 Km radius | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | Yes | The area under study falls in Zone-III (moderate), according to the Indian Standard Seismic Zoning Map. | | | Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | | | Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | | | Name of Applicant | PANICKER S G | | Designation | General Manager | | Name of Company (Applicant Name should not be given here) | AIRPORT AUTHORITY OF INDIA | | Address | Residential Headquarters
Airport Authority of India
Meenambakkam |
|
|