Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s Vettakode Granite Pvt. Ltd
(b)Name of the Company / Organisation M/S VETTAKODE GRANITES PVT. LTD
(c)Registered Address 28/5F, Vettakode, Pullancheri P.O, Manjeri Malappuram District, Kerala,,Malappuram,Kerala-676122
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Muhammed Vettakode
(b)Designation (Owner/ Partner/ CEO) Managing Partner
(c)Address 28/5F, Vettakode, Pullancheri P.O, Manjeri Malappuram District, Kerala,Malappuram,Kerala-676122
(d)Pin code 676122
(e)E-mail vettakodegranites007@gmail.com
(f)Telephone No. 471-2599680
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity2(b) Mineral beneficiation
(c)Category B1
(d)Proposal Number SIA/KL/MIN/66304/2019
(e)Master Proposal Number(Single Window) SW/223111/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 274/1,274/2-1,274/3,275/2
(b)Pincode 676122
(c)Bounded Latitudes (North)
From
Degree 11
Minutes 05
Second 42.38
From
Degree 11
Minutes 05
Second 49.65
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 08
Second 4.58
From
Degree 76
Minutes 08
Second 13.16
(e)Survey of India Topo Sheet No. 58A/4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 125
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaMalappuramEranadAnakkayam
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 1514/EC3/2019/SEIAA
(b)Date of Apply of TOR 14 Dec 2019
(c)Date of Issue of TOR / Standard ToR 01 Jun 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jan 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Feb 2021
Distance of Public Hearing Venue from the Proposed Project :7.63
Malappuram
State :Kerala
District :Malappuram
Tehsil :Eranad
Village :Kottakkunnu
4610OthersSpecial Deputy collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Tippers10 Ton5
(2.)DG set125 kVA1
(3.)Hydraulic Excavator210 DP2
(4.)Jack Hammer32 mm Dia hole2
(5.)CompressorCFM/ 1002
(6.)Rock Braker1500HP1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)3.3624140000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 2.85
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.16
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.9
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.7
(e) Funds Allocated for Environment Management Capital(%) 5.61
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0Tons per Annum0Road0 LinkageCopy of Linkage
(2.)Diesel0.003Tons per Annum0Road0 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jul 2020 To 30 Sep 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube3.42.92.80
(2.)PM10Micro Gram per Meter Cube55.438.652.5100
(3.)PM2.5Micro Gram per Meter Cube31.818.726.160
(4.)SO2Micro Gram per Meter Cube3.52.92.980
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)Total Hardnessmg/l36360200
(3.)Heavy MetalsCoppermg/l0.200.020.051.0
(4.)Chloridesmg/l18.118.1250250
(5.)pHOthersNA6.896.896.58.5
(6.)Fluoridemg/l0.100.101.01.0
(7.)TDSmg/l81.081.0500500
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersNAmg/l00B
(2.)BODmg/l00B
(3.)pHOthersNA6.866.86B
(4.)CODmg/l00B
(5.)DOmg/l00B
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.536.955
(2.)Leq(Night)A-weighted decibels(dB(A))39.233.845
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre73.573.5
(2.)pH6.196.19
(3.)P(Phosphorus)0.140.14
(4.)N(Nitrogen)0.230.23
(5.)K(Potassium)0.120.12
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.73 To 16.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.26 To 10.62
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater51.35Copy of Permission LetterPipelineOpen WellNA14 Dec 20195
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste from office and mines work room0.50Septic tankGreen Belt Renewal Plant0.5
16.1.
(a)Total Waste Water Generation 0.5
(b)Total Discharged Water 0
(c)Total Reused Water 0.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic waste from office and mines workers roomOthersSeptic Tank0.5Tons1Pipe ConveyorOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube60.814.1764.97100
(2.)NOxMicrogram per Meter Cube4.2112.626.8380
(3.)PM2.5Microgram per Meter Cube28.312.4930.7960
(4.)SO2Microgram per Meter Cube010080
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set of 125kVAHSD30.15SO2,NOx0.02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100
(b)Source KESB & DG Set
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) DG set of 125kVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.3624
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.3624
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 0
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.5772Plantation
(2.)Quarry Area2.7852Pit area
Total 3.3624
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area00None with 10km radius
(2.)NPA00None with 10km radius
(3.)Corridors00None with 10km radius
(4.)Wildlife Corridors00None with 10km radius
(5.)WLS00None with 10km radius
(6.)ESAs00None with 10km radius
(7.)ESZs00None with 10km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest00None with in 10km radius
(2.)Defence Installations00None with in 10km radius
(3.)Archaeological Sites00None with in 10km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 250
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.5772
(b)Percentage of Total Project Area 17.17
(c)No. of Plants to be Planted 600
(d)Funds Allocated for Plantation 17
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProvide environment sustainability
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Granite (Building stone)Minor
2.
Mine Capacity in ROM (Run of Mine) 2141700
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. DOM/M-698/2019
(b)Date of Approval 05 Mar 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department District Geologist
(e)Approved Mining Lease Area 3.3624
(f)Approved Capacity 140000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 3.688156
(b)Mineable Reserves (Million Ton) 2.141700
(c)Extractable Reserves(Million Ton) 2.141700
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral 100
(f)Stripping Ratio 1 : 0.03
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 15
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 3.3624
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 19 Dec 2018
(iii)Validity of LOI 5
(iv)Reference No. of LOI 12703/M3/2018
(c)Whether Lease Deed Executed ? No
(i)Reason thereof EC is not granted
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof EC is not Granted
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 1
(ii)Total Area (in Hectare) 0.5
(iii)Height (in meter) 6
(iv)Quantity (in Million Cubic meter) 25000
(v)No. of year back fill up 10
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 1
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 25000
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 6
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Trucks & Tippers
(b)Surface to Siding/Loading Excavator / Tippers
(c)Transportation / Conveyor Details Trucks & Tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)WASTE LAND000
(3.)SETTLEMENTS000
(4.)GRAZING LAND000
(5.)FOREST LAND000
(6.)SURFACE WATER BODIES000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT0.5772000.5772
(2.)EXCAVATION/QUARRY2.7852002.7852
(3.)EXTERNAL OB DUMPS0000
(4.)ROADS0000
(5.)TOP SOIL STORAGE0000
(6.)INTERNAL OB DUMPS0000
(7.)VIRGIN AREA0000
(8.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL3.36240003.3624
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 2.7852
(d)Safety Zone(in hectare) 0.5772
(e)Final Void of 0 (hectare) at a Depth of 10 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 600
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.5772
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0130
(ii)Name of the EIA Consultant Eco Tech Labs Private Limited
(iii)Address 48, 2nd main road, Ram nagar south Extn, Pallikaranai, Chennai, Tamil Nadu
(iv)Mobile No. 9895051333
(v)Landline No. 43530324
(vi)Email Id gecminingsolution@gmal.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 16 Mar 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)11/08/20211. You are directed to pay the Processing Fee to treasury directly in the Head of Account ‘1425-00-501-99-Processing Charge on Environment Clearance by the State Environment Impact Assessment Authority’ and upload the Chelan via PARIVESH. 2. The original copy of the treasury challan should be submitted to SEIAA Office. 3. The duly signed covering Letter 4. Duly signed Form I & Form IM 5. Pre Feasibility Report
(2.)27/08/2021The correction have been made as per the instruction received
(3.)21/03/2022You are directed to submit the following documents at the earliest 1. NABL Certificate of Accreditation of Standards Environmental and Analytical Laboratories 2. Details of Corporate Environment Responsibility with physical targets and fund allocation
(4.)11/07/2022The correction have been made as per the instruction received
(5.)15/07/2022It is observed that the validity of the consultancy firm expired onL7.O3.2022. Hence you are directed to submit the valid NABET Certificate
(6.)16/07/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)14/09/2022Please see the attached file for details of the additional documents sought in 131th SEAC meeting.ADS Letter
(2.)30/11/2022Submitting additional documents referred in 131st SEAC MinutesADS Letter
(3.)09/05/2023Please find the attached file for the details of the additional documents sought in 141th SEAC meeting.ADS Letter
(4.)25/09/2023Submitting Additional Documents referred in 141th SEAC MinutesADS Letter
(5.)11/04/2024Please find the attached file for the details of the additional documents sought in 161st SEAC meeting.ADS Letter
(6.)24/05/2024As per 161st SEAC meeting, the details of the additional documents sought is uploaded.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMuhammed Vettakode
DesignationManaging Partner
Name of Company (Applicant Name should not be given here)M/S VETTAKODE GRANITES PVT. LTD
Address28/5F, Vettakode, Pullancheri P.O, Manjeri Malappuram District, Kerala
Print