Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Pharmaceutical Bulk Drugs & Intermediates Unit
(b)Name of the Company / Organisation M/S ACTAVIA PHARMACEUTICALS PVT. LTD.
(c)Registered Address 3/435, Kala Kuan, Housing Board, Alwar, Rajashtan,North West,Delhi-110034
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Vipul Goel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 3/435, Kala Kuan, Housing Board, Alwar, Rajashtan,North West,Delhi-110034
(d)Pin code 110034
(e)E-mail v.goel@biotavia.com
(f)Telephone No. 11-47063600
(g)Fax No. 01147063601
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/RJ/IND2/64985/2020
(e)Master Proposal Number(Single Window) SW/219593/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 118-119
(b)Pincode 301030
(c)Bounded Latitudes (North)
From
Degree 27
Minutes 30
Second 40.04
From
Degree 27
Minutes 30
Second 44.93
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 40
Second 41.83
From
Degree 76
Minutes 40
Second 41.83
(e)Survey of India Topo Sheet No. G43E10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 252
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4.32
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanAlwarAlwarMatsya Industrial Area
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 513
(b)Date of Apply of TOR 30 Oct 2020
(c)Date of Issue of TOR / Standard ToR 15 Apr 2021
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As the project falls in approved industrial area,
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)plot area40300sqm
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Intermediates300Tons per AnnumRoad
(2.)Bulk Drug145.62Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 06 Jul 2021
(iv)Valid Upto 18 Jul 2021
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 130
(b) Funds Allocated for Environment Management (Capital) (in crores) 4.76
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.70
(e) Funds Allocated for Environment Management Capital(%) 3.66
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1639.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1639.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Section 2.10 of EIA Report0Tons per Annumopen marketRoad100 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube47.6226.5741.5060
(2.)SO2Micro Gram per Meter Cube21.548.6721.0080
(3.)NOxMicro Gram per Meter Cube38.9720.1438.8680
(4.)PM10Micro Gram per Meter Cube91.2864.3991.10100
    14.2.     No. of Ground Water Monitoring Locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.417.186.58.5
(2.)TSSmg/l0000
(3.)Fluoridemg/l0.410.2011
(4.)Heavy MetalsLeadmg/l0.010.010.10.1
(5.)OthersIrommg/l0.250.180.30.3
(6.)Total Hardnessmg/l282136200200
(7.)Chloridesmg/l198.556250250
(8.)TDSmg/l628294500500
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.027.26D
(2.)BODmg/l10011E
(3.)DOmg/l7.35.3E
(4.)OthersTSSmg/l8820E
(5.)CODmg/l64040E
    14.4.     No. of Ambient Noise Monitoring Locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.960.965
(2.)Leq(Night)A-weighted decibels(dB(A))64.753.055
    14.5.     No. of Soil Sample Monitored Locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram0.570.28
(2.)P(Phosphorus)Milligram per Kilogram697542
(3.)Electric ConductivityMillisiemens per Centimetre812625
(4.)pH7.367.12
(5.)K(Potassium)Milligram per Kilogram292.6216.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 49.3 To 70.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 50.5 To 65.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater5400.1Copy of Permission LettermodeOthersBorewellOthersBorewell21-4/15472/RJ/IND/202107 Jul 2021540
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DM reject, boiler & cooling tower7075UF/NF RO Plant followed by MEEReuse within the Plant & Recycling,Green Belt Renewal Plant,Otherslosses of 7 KLD700
(2.)Process & SRU, washing & scrubbing waste86100ETP followed by MEEReuse within the Plant & Recycling,Green Belt Renewal Plant,Otherslosses of 11 KLD RO reject860
(3.)Domestic waste2125STPReuse within the Plant & Recycling,Otherslosses of 1 KLD210
16.1.
(a)Total Waste Water Generation 177
(b)Total Discharged Water 0
(c)Total Reused Water 177
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non-biodegradable wasteMunicipal Solid Waste13.6Tons1.0RoadAuthorized Recyclers
(2.)MEE residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)346.5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Bio SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.88Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Biodegradable wasteMunicipal Solid Waste18Tons1.0RoadOthersWaste disposal site
(5.)Oil Cotton WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.66Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Spent carbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)445.5Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6.6Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(8.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.66Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(9.)Boiler AshFly Ash1900Tons10RoadOthersBrick manufacturers
(10.)Waste residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.66Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube86.300.90.0386.34100
(2.)SO2Microgram per Meter Cube17.100.90.0417.1580
(3.)NOxMicrogram per Meter Cube33.500.90.0533.5680
(4.)PM2.5Microgram per Meter Cube42.400.90.0442.4560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2x1000 kVA DG SetsDiesel300.3NOx0.228
(2.)DG sets of 2x500 kVADiesel300.25NOx0.090
(3.)Boiler of 4 TPHAgrobriquettes320.3PM100.004
(4.)Boiler of 4 TPHAgro briquettes320.3PM2.50.002
(5.)Boiler of 3 TPHAgro briquettes320.3PM100.005
(6.)Boiler of 3 TPHAgro briquettes320.3SO20.02
(7.)Boiler of 2.5 TPHAgro briquettes320.3SO20.02
(8.)Boiler of 0.5 TPHAgro briquettes320.3SO20.12
(9.)Boiler of 2.5 TPHAgro briquettes320.3PM100.005
(10.)2x1000 kVA DG SetsDiesel300.3PM100.034
(11.)2x1000 kVA DG setsDiesel300.3SO20.12
(12.)DG sets of 2x500 kVADiesel300.25PM100.017
(13.)DG sets of 2x500 kVADiesel300.25SO20.06
(14.)DG sets of 2x500 kVADiesel300.25PM2.50.007
(15.)Boiler of 0.5 TPHAgro briquettes320.3PM100.007
(16.)2x1000 kVA DG SetsDiesel300.3PM2.50.013
(17.)Boiler of 4 TPHAgro briquettes320.3SO20.02
(18.)Boiler of 4 TPHAgro briquettes320.3NOx0.017
(19.)Boiler of 3 TPHAgro briquettes320.3PM2.50.002
(20.)Boiler of 2.5 TPHAgro briquettes320.3NOx0.034
(21.)Boiler of 0.5 TPHAgro briquettes320.3NOx0.090
(22.)Boiler of 0.5 TPHAgro briquettes320.3PM2.50.007
(23.)Boiler of 3 TPHAgro briquettes320.3NOx0.029
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source Rajasthan State Electricity Board (RSEB)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2x1000 kVA & 2x500 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 4.03
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.03
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 25497.98
(b)Waste/Barren Land 331.54
(c)Grazing/ Community Land 714.73
(d)Surface Water Bodies 181.12
(e)Settlements 4349.85
(f)Industrial 760.97
(g)Forest 423.44
(h)Mangroves 0
(i)Marine Area 0
(j)Others : - 0
    Total 32259.629999999997
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant4.03
Total 4.03
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0NA
(2.)CorridorsNone0NA
(3.)WLSNone0NA
(4.)ESZsNone0NA
(5.)Wildlife CorridorsNone0NA
(6.)NPANone0NA
(7.)ESAsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0NA
(2.)Defence InstallationsNone0NA
(3.)ForestNidani Reserve Forest10.33NW direction from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 4.03
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Desula Sub Minor
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 4.32
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 500
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 600
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 13299
(b)Percentage of Total Project Area 330000.00
(c)No. of Plants to be Planted 2700
(d)Funds Allocated for Plantation 19
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreen area will be developed
(2.)SocialEmployment will be generated
(3.)FinancialRevenue will be generated
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA 0184
(ii)Name of the EIA Consultant Perfact EnviroSolutions Pvt. Ltd.
(iii)Address 5th Floor, NN Mall, Sector 3, Rohini, New Delhi- 110085
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 27 May 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)26/07/2021The application/proposal submitted by PP has been examined and the proposals/ application is found deficient /incomplete in respect to following:- 1. Project description including drawings showing project layout ,components of project. 2. Total Water demand and source of water with water distribution flow chart.
(2.)24/08/2021The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVipul Goel
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S ACTAVIA PHARMACEUTICALS PVT. LTD.
Address3/435, Kala Kuan, Housing Board, Alwar, Rajashtan
Print