Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sardaman Quarry Lease
(b)Name of the Company / Organisation SHRI DADAI SINGH GOND
(c)Registered Address Village - Sardaman, Tehsil - Hanumana, District - Rewa, M P,,Rewa,Madhya Pradesh-486335
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Dadai Singh Gond
(b)Designation (Owner/ Partner/ CEO) Lessee
(c)Address Village - Sardaman, Tehsil - Hanumana, District - Rewa, M P,Rewa,Madhya Pradesh-486335
(d)Pin code 486335
(e)E-mail dadai202021@gmail.com
(f)Telephone No. 755-4282658
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/MP/MIN/64143/2020
(e)Master Proposal Number(Single Window) SW/196934/2021
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 10/1/Ka/1,10/1/Ka/2,10/1/Ka/3,10/1/Ka/4,10/1/Ka/5,
(b)Pincode 486335
(c)Bounded Latitudes (North)
From
Degree 24
Minutes 35
Second 22.88
From
Degree 24
Minutes 35
Second 23.02
(d)Bounded Longitudes (East)
From
Degree 82
Minutes 0
Second 53.07
From
Degree 82
Minutes 0
Second 58.34
(e)Survey of India Topo Sheet No. 63 H
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 324
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.200
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshRewaHanumanaSardaman
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 7164/2020
(b)Date of Apply of TOR 26 Jun 2020
(c)Date of Issue of TOR / Standard ToR 26 Jun 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Feb 2021
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Mar 2021
Distance of Public Hearing Venue from the Proposed Project :0.100
At Project Site, Village Sardaman
State :Madhya Pradesh
District :Rewa
Tehsil :Hanumana
Village :Sardaman
30Air pollution, Water Problem, Road Maintenance and otherOthersADM, Rewa (M.P.)
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Stone MineProduction 97470 Cubic Meter Per YearFresh EC
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Stone Mine97470OthersCubic Meter Per YearRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.45
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.35
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0150
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.0500
(e) Funds Allocated for Environment Management Capital(%) 77.78
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0Othersno Required Raw Material0Road0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2020 To 31 Dec 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube783968100
(2.)SO2Micro Gram per Meter Cube12.75.212.380
(3.)PM2.5Micro Gram per Meter Cube29122860
(4.)NOxMicro Gram per Meter Cube16.68.116.480
    14.2.     No. of Ground Water Monitoring Locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l3913495001000
(2.)Total Hardnessmg/l204.1178.5300600
(3.)Chloridesmg/l87.256.22501000
(4.)Fluoridemg/l0.740.541.01.5
(5.)Heavy MetalsZincmg/l4535515
(6.)TSSNA0000
(7.)pHNA7.596.546.58.5
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.027.25A
(2.)DOmg/l6.74.2B
(3.)BODmg/l3.62.15C
(4.)CODmg/l2518D
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))57.236.755
(2.)Leq(Night)A-weighted decibels(dB(A))40.231.945
    14.5.     No. of Soil Sample Monitored Locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare354298
(2.)P(Phosphorus)Kilogram per hectare3115
(3.)Electric ConductivityMillisiemens per Centimetre409284
(4.)pHKilogram per hectare7.657.18
(5.)K(Potassium)Kilogram per hectare193156
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.85 To 29.32
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.60 To 17.70
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater50.500Copy of Permission LettermodeOthersWater tankerTube Well931/Khanij/2020,Rewa16 Mar 20207
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Non-Coal Mining000Discharge into Surface Water Body0
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top SoilOthersTop Soil1Tons0.010OthersLaborOthersPlantation & back Filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2NA010000
(2.)PM10NA010000
(3.)NOxNA010000
(4.)PM2.5NA010000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 4.50
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 4.50
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Private Land(10/1/KA/1, 10/1/KA/2, 10/1/KA/3, 10/1 4.50
    Total 4.5
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area3.746Excavation Area
(2.)Green belt0.644Plantation
(3.)Built Up Area0.010
(4.)OthersRoad0.100
Total 4.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0No Such Area fall under 10km radius of the project site
(2.)NPANA0No Such Area fall under 10km radius of the project site
(3.)CorridorsNA0No Such Area falls under 10 km radius of the project site
(4.)Wildlife CorridorsNA0No Such Area falls under 10 km radius of the project site
(5.)WLSNA0No Such Area fall under 10km radius of the project site
(6.)ESAsNA0No Such Area fall under 10km radius of the project site
(7.)ESZsNA0No Such Area falls under 10 km radius of the project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0No such area falls under10 km radius of the project site
(2.)Archaeological SitesNA0No such area falls under10 km radius of the project site
(3.)Defence InstallationsNA0No such area falls under10 km radius of the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 6
(d)Temporary Employment- During Operation 14
(e)No. of working days 250
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.644
(b)Percentage of Total Project Area 14.31
(c)No. of Plants to be Planted 6750
(d)Funds Allocated for Plantation 675000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialGenerate Revenue & Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)Metal Stone (Gitti)Minor
2.
Mine Capacity in ROM (Run of Mine) 1
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 507/Mining Plan/NK/2020, Rewa
(b)Date of Approval 08 May 2020
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Regional Head, Directorate of Geology & Mining, Re
(e)Approved Mining Lease Area 4.50
(f)Approved Capacity 97470
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 4320000
(b)Mineable Reserves (Million Ton) 3498088.8
(c)Extractable Reserves(Million Ton) 3498088.8
(d)Percent(%) of Extraction 95
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 10
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 4.5
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 16 Mar 2020
(iii)Validity of LOI 10
(iv)Reference No. of LOI 931/Khanij/2020 ,Rewa
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Fresh Lease
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Fresh Lease
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 4.50
(b)Depth (in meter) 40
(c)Volume (in Million Cubic meter) 97470
12.
Details of Quarry:
(a)Final Void of 3.746 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 4.5
13.
Details of Transportation:
(a)In Pit/Underground to Surface By Hired Vehicle
(b)Surface to Siding/Loading by Hired Vehicle
(c)Transportation / Conveyor Details By Hired Vehicle
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS000
(2.)WASTE LAND4.504.5
(3.)GRAZING LAND000
(4.)SURFACE WATER BODIES000
(5.)AGRICULTURE LAND000
(6.)FOREST LAND000
TOTAL4.504.5
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)INTERNAL OB DUMPS0000
(2.)GREEN BELT0.644000.644
(3.)EXCAVATION/QUARRY03.74603.746
(4.)EXTERNAL OB DUMPS0000
(5.)ROADS000.0100.01
(6.)BUILT UP AREA (COLONY/OFFICE)000.1000.1
(7.)VIRGIN AREA0000
(8.)TOP SOIL STORAGE0000
TOTAL0.6443.7460.1104.5
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 3.746 (hectare) at a Depth of 40 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 6750
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)00097470974700
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/RA0070 (Rev-02)
(ii)Name of the EIA Consultant MR. AJAY MOHAN
(iii)Address E-7/829 Arera Colony, Bhopal
(iv)Mobile No. 8878698009
(v)Landline No. 0
(vi)Email Id admin@insituenvirocare.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 19 Aug 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)03/08/2021After presentation committee asked PP to submit response on following issues including irrelevant/misleading information provided in From-II, such as: 1. Revised surface plan leaving 100 m area w.r.t. nearby forest area as according to Divisional Commissioner Level Forest Committee meeting held on 20.02.2020. 2. R&R plan w.r.t. to 04-06 kachcha house/hutments within lease area. 3. Distance of houses in existence around the mines and their protection plan in line with the guidelines stipulated b
(2.)11/08/2021We are submitting pointwise query reply with annexures of Case No. 7164/20.ADS Letter
(3.)03/09/2021After deliberations committee asked PP to submit credible proof regarding status of two houses located (approx. 25 meters away) on the southern side of the lease, comprehensive mitigation plan and mark resident’s house location on map who have taken objection during public hearing.
(4.)27/04/2022Regarding Relist of our Case 7164/2020ADS Letter
(5.)26/05/2022Case delisted vide letter no. 579-80/SEIAA/22 dated 25-05-22.ADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDadai Singh Gond
DesignationLessee
Name of Company (Applicant Name should not be given here)SHRI DADAI SINGH GOND
AddressVillage - Sardaman, Tehsil - Hanumana, District - Rewa, M P
Print