Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amendment and expansion in EC for Residential cum Commercial project
(b)Name of the Company / Organisation MACROTECH DEVELOPERS LIMITED
(c)Registered Address Lodha Excelus, NM Joshi Marg, Mahalaxmi, Mumbai- 400011,,Mumbai City,Maharashtra-400011
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Atul Jangam
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address Lodha Excelus, NM Joshi Marg, Mahalaxmi, Mumbai- 400011,,Fort Tondiarpet,Mumbai City,Maharashtra-400011
(d)Pin code 400011
(e)E-mail developersmacrotech@gmail.com
(f)Telephone No. 22-23024400
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/MIS/63239/2020
(e)Master Proposal Number(Single Window) SW/211854/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Amendment and expansion in EC for Residential cum
(b)Pincode 400601
(c)Bounded Latitudes (North)
From
Degree 19.12
Minutes
Second
From
Degree 19.13
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.59
Minutes
Second
From
Degree 73.60
Minutes
Second
(e)Survey of India Topo Sheet No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4.5
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 0.4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraThaneThaneBalkum
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number SIA/MH/NCP/50293/2020
(b)Date of Apply of EC 29 Jan 2020
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing is not applicable for construction
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 16-9/2010(ENV)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total BUA (m2)569571.6975616.5645188.19Othersm2Othersm2
(2.)Non-FSI area (m2)241511.90-18338.29223173.61Othersm2Othersm2
(3.)Plot area (m2)2901332830292963Othersm2Othersm2
(4.)FSI area (m2)328059.5093954.75422014.25Othersm2Othersm2
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Club HouseGr+1Gr+1Gr+1No Change, OC Received
(2.)Tower No. 1Gr + 29 floorsG+23G+23Yet to Start
(3.)Phase I & IIBldg. 1 to 47: No Change (Constructed & Occupied)Bldg. 1 to 47: No Change (Constructed & Occupied)Bldg. 1 to 47: No Change (Constructed & Occupied)Phase I & II : No Chnage
(4.)Wing BGr+29 FloorsSt/Gr+29 FloorsSt/Gr+29 FloorsNo Change, OC Received
(5.)Wing J3B + Gr + 1 to 30 Floors3B + St/Gr + 1 to 30 Floors3B + St/Gr + 1 to 30 Floors
(6.)TMC Bldg.-B+Gr+12B+Gr+12
(7.)Tower No. 2G + 1 floorG+23G+23Yet to Start
(8.)Tower No. 3B + G + P + 30 floorsG+23G+23Yet to Start
(9.)Tower No. 4B + G + P + 30 floorsG+23G+23Yet to Start
(10.)Tower No. 5B + G + P + 30 floorsG+23G+23Yet to Start
(11.)Tower No. 6B + G + P + 30 floorsG+23G+23Yet to Start
(12.)Tower No. 7-G+23G+23
(13.)Wing AGr+29 FloorsSt/Gr+29 FloorsSt/Gr+29 FloorsNo Change, OC Received
(14.)Wing CGr+29 FloorsSt/Gr+29 FloorsSt/Gr+29 FloorsNo Change, OC Received
(15.)Wing D3B + Gr + 29 Floors3B + St/Gr + 29 Floors3B + St/Gr + 29 FloorsConstructed upto 21 Floors
(16.)Wing HGr + 1P + 27 floorsGr / St+ Pod+ upper 27 FloorsGr / St+ Pod+ upper 27 FloorsNo Change, OC Received
(17.)Wing IGr + Pod+ upper 27 FloorsGr / St+ Pod+ upper 27 FloorsGr / St+ Pod+ upper 27 FloorsNo Change, OC Received
(18.)Wing KG + 30 floorsSt/Gr + 14 FloorsSt/Gr + 14 Floors
(19.)Tower No. 18G + 30 floorsSt/Gr + 32 FloorsSt/Gr + 32 Floors
(20.)TMC Bldg.St + 5 FloorsSt + 5 FloorsSt + 5 FloorsNo Change, OC Pending
(21.)MLCP-B+Gr+13B+Gr+13
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 May 2019
(iv)Valid Upto 01 May 2024
(v)File No. BO/CAC-Cell/Co(Part)UAN No. 0000025815/CO(part)
(vi)Application No. BO/CAC-Cell/Co(Part)UAN No. 0000025815/CO(part)
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1141
(b) Funds Allocated for Environment Management (Capital) (in crores) 19.08
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 4.32
(e) Funds Allocated for Environment Management Capital(%) 1.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)N/A0OthersNA0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Nov 2020 To 29 Jan 2021
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45264460
(2.)SO2Micro Gram per Meter Cube16101680
(3.)PM10Micro Gram per Meter Cube845283100
(4.)NOxMicro Gram per Meter Cube22142280
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l21212501000
(2.)TSSmg/l6600
(3.)TDSNA1581585002000
(4.)Total Hardnessmg/l160160300600
(5.)pHNA7.87.87.58.5
(6.)Fluoridemg/l0011.5
(7.)Heavy MetalsMagnesiummg/l303000
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.8C
(2.)BODmg/l3535A
(3.)CODmg/l150150A
(4.)DOmg/l4.84.8A
    14.4.     No. of Ambient Noise Monitoring Locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))725375
(2.)Leq(Night)A-weighted decibels(dB(A))614170
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare52.852.8
(2.)pH7.87.8
(3.)N(Nitrogen)Kilogram per hectare42.642.6
(4.)K(Potassium)Kilogram per hectare58.258.2
(5.)Electric ConductivityMillisiemens per Centimetre2.42.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersThane Municipal Coproration49830Copy of Permission LetterPipelineOthersMunicipal Water SupplyTMC/1829 Apr 20174983
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Sewage43254542MBBR TechnologyDischarge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant19812344
16.1.
(a)Total Waste Water Generation 4325
(b)Total Discharged Water 2344
(c)Total Reused Water 1981
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Domestic Solid waste (Biodegradable)Municipal Solid Waste2383Tons0OthersOnsite composingOthersBio-methanation Plant
(2.)Domestic Solid Waste (Non-Biodegradable)Municipal Solid Waste3575Tons0RoadOthersHanded over to local body
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube8400.100
(2.)PM2.5Microgram per Meter Cube4500.100
(3.)SO2Microgram per Meter Cube1600.100
(4.)NOxMicrogram per Meter Cube2200.100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (10265 kVA)HSD6.00.1SO22.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 41000
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 10265 kVA (1 x100 kVA , 1 x 125 kVA, 2 x320 kVA, 1
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 29.29
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 29.29
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 1631.00
(b)Waste/Barren Land 394
(c)Grazing/ Community Land 709.25
(d)Surface Water Bodies 680.36
(e)Settlements 1763.36
(f)Industrial 0
(g)Forest 713.96
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Vegetation 1962.01
    Total 7853.94
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Built Up Area29.29BUA proposed: 6,45,187.90 sqm
Total 29.29
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0NA
(2.)Wildlife CorridorsNA0NA
(3.)Critically Polluted AreaNA0NA
(4.)ESZsSanjay Gandhi National Park3.5Outside of ESZ area i.e. 100 m
(5.)WLSThane Creek Flamingo Wildlife Sanctuary6.5The distance of project site from Flamingo sanctuary is 6.5 KM.
(6.)ESAsNA0NA
(7.)NPASanjay Gandhi National Park3.5Outside of ESZ area i.e. 100 m
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsKolshet Air Force station4-
(2.)ForestSanjay Gandhi National Park3.5Outside of ESZ area i.e. 100 m
(3.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 29.29
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Land is in possession of PP
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nalla Passing through the plot
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Thane & Desai Creek
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 500
(b)Permanent Employment-During Operation 1500
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 365
(f)Total Manpower 2200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt49034802357057
(2.)Percentage of Total Project Area172.7019
(3.)No. of Plants19988022800
(4.)Funds Allocated55021571
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe proposed project would have beneficial impacts through provision of direct and indirect employment opportunities. At the time of construction and operational phases, there would be requirement for
(2.)EnvironmentalThe project is newly raised therefore; At the time of development plantation will be carried out. The various Environmental facilities and infrastructure planned in the project. This includes solid wa
(3.)SocialWe will generate opportunities & Infrastructure which will be utilized by Locals.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 96
(b)Total No. of Flats to be Build 6951
(c)No. of Buildings 67
(d)Total plot area (sqm) 292963
(e)Total built up area (sqm) 645187.90
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 67
    Capacity 1000
(b)No. of Recharge Pits 0
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4W: 5765 & 2W: 7849
5.
Energy Saving Measures:
(a)Source/Mode MSEDCL
(b)Percentage 20
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/17/00427
(ii)Name of the EIA Consultant Mahabal Enviro Engg. Pvt. Ltd.
(iii)Address Plot No. F7, Road No. 21, Wagle Estate, Thane W- 400604
(iv)Mobile No. 9323058368
(v)Landline No. 21716389
(vi)Email Id dap_24@hotmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Oct 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAtul Jangam
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)MACROTECH DEVELOPERS LIMITED
AddressLodha Excelus, NM Joshi Marg, Mahalaxmi, Mumbai- 400011