Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposedd Commercial & Rehab Residential on plot Tata Colony (Plot 1) and Bharat Nagar transit camp (Plot 2) at Bharat Nagar bearing S.No. 378 (Pt) CTS No. 7643 (Pt) & 5371 (Pt) Village Kole-Kalyan, Tal. Andheri, Mumbai
(b)Name of the Company / Organisation M/S. ABIL BUILDCON LLP & M/S. DB (BKC) REALTORS PVT. LTD
(c)Registered Address DB Central, Dr. A. L. Nair road, Near Jacob Circle, Gate no.3 of Raheja Vivarea, Mahalaxmi, Mumbai,,Mumbai City,Maharashtra-400011
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Bhavesh Kuvadia
(b)Designation (Owner/ Partner/ CEO) AVP NBI and RA
(c)Address DB Central, Dr. A. L. Nair road, Near Jacob Circle, Gate no.3 of Raheja Vivarea, Mahalaxmi, Mumbai,Mumbai City,Maharashtra-400011
(d)Pin code 400011
(e)E-mail abildbbkc@gmail.com
(f)Telephone No. 0-
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/MH/NCP/58422/2020
(e)Master Proposal Number(Single Window) SW/207318/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S.No. 378 (Pt). CTS No. 7643 (Pt.) & 5371 (Pt.)
(b)Pincode 400051
(c)Bounded Latitudes (North)
From
Degree 19
Minutes 06
Second 44
From
Degree 19
Minutes 06
Second 44
(d)Bounded Longitudes (East)
From
Degree 72
Minutes 85
Second 28
From
Degree 72
Minutes 85
Second 28
(e)Survey of India Topo Sheet No. No. E43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraMumbai CityAndheriKole-Kalyan
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number SIA/MH/NCP/58422/2020
(c)Date of Apply of TOR 18 Nov 2020
(d)Date of Issue of TOR / Standard ToR 08 Feb 2021
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing is not required for Building Constr
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total Construction Area381153
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)38818.663OthersCommercial and Residential BuildingsOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1435.95
(b) Funds Allocated for Environment Management (Capital) (in crores) 5.65
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.37
(e) Funds Allocated for Environment Management Capital(%) 0.39
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Construction Project0Kilo Litre per DayNARoad0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Dec 2020 To 15 Mar 2021
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube33.23.130.780
(2.)OthersCOMili Gram per Meter Cube2.41.22.34
(3.)PM2.5Micro Gram per Meter Cube42.71241.2860
(4.)PM10Micro Gram per Meter Cube121.553.9119.1100
(5.)NOxMicro Gram per Meter Cube417.439.3580
    14.2.     No. of Ground Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l21.518.30250
(2.)Fluoridemg/l0.230.2301
(3.)Heavy MetalsCalciummg/l61.561.5075
(4.)OthersMagnesiummg/l23.723.7030
(5.)TDSmg/l3483480500
(6.)TSSmg/l10.210.2025
(7.)pHNA7.47.46.58.5
(8.)Total Hardnessmg/l1701700300
    14.3.     No. of Surface Water Monitoring Locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l9.56.9A
(2.)OthersTDSmg/l355342A
(3.)BODmg/l3.21.5A
(4.)pHNA7.77.7A
(5.)DOmg/l5.44.3A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))7365.155
(2.)Leq(Night)A-weighted decibels(dB(A))44.940.245
    14.5.     No. of Soil Sample Monitored Locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre267.55267.55
(2.)P(Phosphorus)Parts per Million3131
(3.)K(Potassium)Milligram per Kilogram77.6277.62
(4.)pH7.87.8
(5.)N(Nitrogen)Percent1.421.42
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.3 To 1.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.3 To 1.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMCGM19262 Not Appliacble PipelineOthersNANA01 Apr 20211926
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage17011701Sewage treatment plantReuse within the Plant & Recycling1701
16.1.
(a)Total Waste Water Generation 1701
(b)Total Discharged Water 0
(c)Total Reused Water 1701
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable WasteMunicipal Solid Waste687Tons0OthersBinsOthersOWC
(2.)Non-Biodegradable WasteMunicipal Solid Waste509Tons1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube51.7210.862.5100
(2.)NOxMicrogram per Meter Cube38.222.340.580
(3.)Others(Specify)CONA1.620.72.34
(4.)PM2.5Microgram per Meter Cube23.425.62960
(5.)SO2Microgram per Meter Cube20.924.12580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)2500 KVAHSD900.6PM10,SO2,NOx ,PM2.5NA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 27921
(b)Source Adani Power
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2500 x 8, 2500 x 8
(e)Stack Height (in m) 90
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 3.88
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 3.88
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Private Land 3.88
    Total 3.88
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Area for Solid Waste Management0.05
(2.)OthersSewage treatment plant0.13
(3.)Green belt0.89
Total 1.07
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSThane Creek Flamingo Sacntuary8.2NA
(2.)ESAsTungareshwar wildlife sanctuary39.4NA
(3.)ESZsTansa Wildlife sanctuary50.3NA
(4.)Critically Polluted AreaTarapur Industrial Area81.6NA
(5.)CorridorsNA0NA
(6.)NPASanjay Gandhi National Park10.3NA
(7.)Wildlife CorridorsSahyadri Radhanagri Tiger reserve316NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSanjay Gandhi National PArk10.3NA
(2.)Archaeological SitesMahim Fort3NA
(3.)Defence InstallationsNavy Nagar Colaba24.1NA
(4.)OthersLakesChhatrapati Shivaji Maharaj Talav3.5NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 13
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.88
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 100
(e)No. of working days 7
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.89
(b)Percentage of Total Project Area 22.94
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalWaste water treatment, Solid waste management, RG area development
(2.)Financialthis project will create job opportunities as project is commercial cum residential in nature
(3.)SocialImpacts on jobs and opportunities, water availability, storm water drainage
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 86.65
(b)Total No. of Flats to be Build 725
(c)No. of Buildings 3
(d)Total plot area (sqm) 38818.66
(e)Total built up area (sqm) 381153
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
    Capacity 680
(b)No. of Recharge Pits 11
    Capacity 363
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2177
5.
Energy Saving Measures:
(a)Source/Mode Adani Power
(b)Percentage 26.92
(c)Quantity 1666714
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The storm water collection system will be designed
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2124/IA0076
(ii)Name of the EIA Consultant Enviro Policy Research India Pvt Ltd
(iii)Address 607, Oriana Business Park, Wagle Estate, Road no 22, Opp. Dosti Pinnacle, Thane, 400604
(iv)Mobile No. 9833825875
(v)Landline No. 0222081101
(vi)Email Id avick1114@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 26 Apr 2024
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)11/04/2021PP to submit details of scrutiny fees paid as per important notice published on 10th November,2020 by SEIAA on ec.ecmpcb.in website.
(2.)27/05/2021The correction have been made as per the instruction received
(3.)23/08/2021pls mention details of accredited consultant in form 2 & in EIA & upload revised copy of EIA accordingly
(4.)24/08/2021The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)08/11/2021Compliance as per minutes
(2.)08/12/2021Kindly consider our case in upcoming SEIAA meetingADS Letter
(3.)08/12/2021Kindly consider our case in upcoming SEIAA meetingADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhavesh Kuvadia
DesignationAVP NBI and RA
Name of Company (Applicant Name should not be given here)M/S. ABIL BUILDCON LLP & M/S. DB (BKC) REALTORS PVT. LTD
AddressDB Central, Dr. A. L. Nair road, Near Jacob Circle, Gate no.3 of Raheja Vivarea, Mahalaxmi, Mumbai