Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Technocity Technology Park at Trivandrum
(b)Name of the Company / Organisation TECHNOPARK PHASE 3
(c)Registered Address M/s Technopark, Park Centre , Thiruvanathapuram,,,Thiruvananthapuram,Kerala-695581
(d)Legal Status of the Company State Government
2.
Address for the correspondence:
(a)Name of the Applicant John M Thomas
(b)Designation (Owner/ Partner/ CEO) CEO
(c)Address M/s Technopark, Park Centre , Thiruvanathapuram,,Thiruvananthapuram,Kerala-695581
(d)Pin code 695581
(e)E-mail ectp@technopark.org
(f)Telephone No. 471-2700222
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity8(b) Townships and Area Development projects.
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/KL/MIS/62018/2020
(e)Master Proposal Number(Single Window) SW/204582/2021
(f)EAC concerned (for category A Projects only) INFRA-2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. i) Veiloor 293/1,293/2,293/3,293/4,293/5,293/5-2,2
(b)Pincode 695581
(c)Bounded Latitudes (North)
From
Degree 8
Minutes 36
Second 54.11
From
Degree 8
Minutes 37
Second 3.03
(d)Bounded Longitudes (East)
From
Degree 76
Minutes 51
Second 8.92
From
Degree 76
Minutes 51
Second 25.07
(e)Survey of India Topo Sheet No. 58D/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 47
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaThiruvananthapuramThiruvananthapuram(i) Veiloor (ii) Pallipuram (iii) Andoorkonam (iv) Melthonnakkal
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 1588/EC1/2020/SEIAA dated 12.11.2020
(c)Date of Apply of TOR 16 Jan 2020
(d)Date of Issue of TOR / Standard ToR 12 Nov 2020
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public hearing is exempted for Township and area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANANA
(2.)NANANA
(3.)NANANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Project Area158HectaresOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 1000
(b) Funds Allocated for Environment Management (Capital) (in crores) 7
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.05
(e) Funds Allocated for Environment Management Capital(%) 0.70
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aggregates2535Tons per Annumcontracters scopeRoad10 LinkageCopy of Linkage
(2.)Sand590Tons per Annumcontracters scopeRoad10 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 14 Jan 2021 To 15 Jan 2021
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube220.812180
(2.)SO2Micro Gram per Meter Cube00080
(3.)PM10Micro Gram per Meter Cube63.915.863.2100
(4.)PM2.5Micro Gram per Meter Cube18.95.61860
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA43.468
(2.)Heavy Metalscadmiummg/l0000
(3.)TDSmg/l0000
(4.)Fluoridemg/l0012
(5.)Total Hardnessmg/l193300300
(6.)Chloridesmg/l4792501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.62.2B
(2.)CODmg/l00A
(3.)DOmg/l87A
(4.)pHNA6.56A
    14.4.     No. of Ambient Noise Monitoring Locations : 3
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))60.657.455
(2.)Leq(Night)A-weighted decibels(dB(A))604645
    14.5.     No. of Soil Sample Monitored Locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)00
(2.)K(Potassium)00
(3.)N(Nitrogen)00
(4.)pH5.795.76
(5.)Electric ConductivityMillisiemens per Centimetre15450
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 25
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersKWA450010Copy of Permission LetterPipelineIntake WellNot Availabe03 Mar 20214500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage36004000STPReuse within the Plant & Recycling,Green Belt Renewal Plant3600
16.1.
(a)Total Waste Water Generation 3600
(b)Total Discharged Water 0
(c)Total Reused Water 3600
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BiodegradableMunicipal Solid Waste6000Tons0OtherstROLLEYOthersBiogas and compost
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube000080
(2.)NOxMicrogram per Meter Cube21002180
(3.)PM2.5Microgram per Meter Cube58005860
(4.)PM10Microgram per Meter Cube630063100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)nana00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 40000
(b)Source KSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) provided by individual parties
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 158
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 158
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 158
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : na 0
    Total 158
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Township158
Total 158
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAnil0NA
(2.)ESAsnil0NA
(3.)ESZsnil0NA
(4.)WLSnil0NA
(5.)Corridorsnil0NA
(6.)Wildlife Corridorsnil0NA
(7.)Critically Polluted Areana0na
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsCRPF Camp0Adjacent to Project Boundary
(2.)ForestNILL0Nil
(3.)Archaeological SitesMadavoorpara Ancient Rock Cut Shiva Temple & Park6Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 26026
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 158
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Nil
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Natural Drain along project site
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 100000
(c)Temporary Employment- During Construction 1000
(d)Temporary Employment- During Operation 1000
(e)No. of working days 2000
(f)Total Manpower 102100
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 50
(b)Percentage of Total Project Area 31.65
(c)No. of Plants to be Planted 26026
(d)Funds Allocated for Plantation 20000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalVacant area transformed to Environmental friendly , aesthetically modified area
(2.)SocialEmployment Opportunity
(3.)FinancialKerala is fast emerging as a digital State in India..HElps to market the State as the most preferred IT/ITEs investment/business destination in India
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 70
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 20
(d)Total plot area (sqm) 1580000
(e)Total built up area (sqm) 6231343
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 20
    Capacity 0
(b)No. of Recharge Pits 40
    Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Provided by Individual Parties as per KMBR
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 20
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The development shall enhance the runoff which sha
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court Districts Courts
(c)Name of the Sub Court Thiruvananthapuram
(d)Case No. OS 83/2014
(e)Orders/Directions of the court ,if any and its relevance with the proposed project Additional Document Attached
(f)Case Details Additional Document Attached
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/2023/RA 0164
(ii)Name of the EIA Consultant KITCO Ltd.
(iii)Address Femith's, Puthiya Road, Chakkaraparambu, Vennala, Kochi, Kerala 682028
(iv)Mobile No. 8527524845
(v)Landline No. 0484412900
(vi)Email Id mail@kitco.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 26 Jan 2023
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)You are directed to submit the following documents: 1. Attach the complete ToR Letter including Sy.Nos. 2. Revised EMP incorporating the specific CER activities in physical terms to be undertaken by the proponent in consultation with the stakeholders as stipulated in the OM No.22- 65/2017-IA.III dated 30/09/2020 and OM No. 22-65/2017-IA.III dated 20/10/2020 of the MoEF&CC, GOI instead of allocation of funds under CER. The CER activities incorporated in the EMP should be undertaken during the first two years of validity period of the EC so as to ensure that the maintenance of the interventions undertaken can be done by the proponent during the remaining validity period of the EC. 3. Form 1 4. Form 1 M 5. You are directed to pay the Processing Fee to treasury directly in Head of Account ‘1425-00-501-99-Processing Charge on Environment Clearance by the State Environment Impact Assessment Authority’ and upload the Chelan via PARIVESH. The original copy of Chelan should submit to SEIAA
(2.)12/08/2021The correction have been made as per the instruction received
(3.)16/08/2021You are directed to submit the following documents: 1. Form 1 2. You are directed theoriginal copy of the treasury Chelan should be to SEIAA office
(4.)16/08/2021The correction have been made as per the instruction received
(5.)06/04/2022You are directed to submit the following documents at the earliest: 1. Form IA 2. Conceptual Plan of the Project 3. Valid NABL Accreditation Certificate of the Lab
(6.)25/04/2022The correction have been made as per the instruction received
           Additional Details Sought
S. No.ADS Sought DateADS SoughtLetter
(1.)30/09/2022Please find the attached file for the details of the additional documents sought in 132th SEAC meetingADS Letter
(2.)26/12/2022PLEASE FIND THE ADS DETAILS ASKED ON 132th SEAC MEETINGADS Letter
(3.)24/01/2023Please see the attached file for the details of the additional documents sought in 136th SEAC meetingADS Letter
(4.)24/11/2023Please find the details of the ADS asked on 136th SEAC meetingADS Letter
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJohn M Thomas
DesignationCEO
Name of Company (Applicant Name should not be given here)TECHNOPARK PHASE 3
AddressM/s Technopark, Park Centre , Thiruvanathapuram,
Print