| Form-1 | | APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE | | | | 1. Basic Informations | | Project Name | Proposed Commercial Colony (Retail, Multiplex & Food Court) at village- Adampur, Sector-50, Gurugram, Haryana by M/s Pyramid City Projects LLP & Others in Collaboration with Elan Ltd | Company/Organisation Name | M/S PYRAMID CITY PROJECTS LLP & OTHERS IN COLLABORATION WITH ELAN LTD. | | Registered Address | L1/100, First Floor, Street No. 25, Sangam Vihar, South Delhi, New Delhi Delhi 110062 | Legal Status of the Company | Private |
| | 2. | | Address for the correspondence: | | (a)Name of the Applicant | Arvinder Dingra | | (b)Designation (Owner/ Partner/ CEO) | VicePresident | | (c)Address | L1/100, First Floor, Street No. 25, Sangam Vihar, South Delhi, New Delhi,South,Delhi-110062 | | (d)Pin code | 110062 | | (e)E-mail | elanlimited165@gmail.com | | (f)Telephone No. | 0- | | (g)Fax No. | | | Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | NIL | |
| | 3. | | Category of the Project/Activity as per Schedule of EIA Notification,2006: | | (a)Major Project/Activity | 8(a) Building and Construction projects
| | (b)Minor Project/Activity | NIL | | (c)Category | B2 | | (d)Proposal Number | SIA/HR/MIS/199721/2021 | | (e)Master Proposal Number(Single Window) | SW/199718/2021 | | (f)EAC concerned (for category A Projects only) | INFRA-2 | | (g)Project Type(New/Expansion/Modernization) | Fresh EC |
|
| | 4. | | (a)Number of States in which Project will be Executed | 1 | | (b)Main State of the project | Haryana | |
| | Details of State(s) of the project |
|---|
| S. No. | State Name | District Name | Tehsil Name | Village Name |
|---|
| (1.) | Haryana | Gurgaon | Gurgaon | Adampur | | | 5. | | Details of Public Consultation: | | (a)Whether the Project Exempted from Public Hearing? | Yes | | (c)Reason | -1 | | (d)Supporting Document | NILL | |
| | Location of the project | Sector-50, Gurugram, Haryana | | | Town / Village (Name of more than one town may be entered by separating with) | illage Adampur, Sector-50, Gurugram | Plot/Survey/Khasra No. (Name of more than one town may be entered by separating with) | Khasra No. 14//12/2 min (2-0), 12min (2-0), 13 min (6-0), 13min (2-0),18(8-0), 19/2/1 (0-12), 9/2/2 (0-17), 9/2/3 (3-1), 9/2/4 (0-9), 9/2/5 (1-0), 9/2 | | State | Haryana | District | Gurgaon | | Tehshil | Gurgaon | Pincode | 122018 | | Nearest railway station | Gurgaon Railway Station | Distance from the project site | 8.9 | | Nearest airport | Indira Gandhi International Airport | Distance from the project site | 14.5 | | Nearest Town/City/District Headquarters | Village Jharsa and Tikri | Distance from the project site | 2.5 | | Village Panchayats, Zila Parishad, Municipal Corporation, Local body(Complete postal addresses with telephone nos. to be given) | Municipal Corporation, Gurugram | Upload GPS file | Copy of Kml File  Uploaded GPS file | | Shape of the project land | Block (Polygon) | Site alternative under consideration(If any) | Uploaded Site alternative under consideration | | Brief summary of project | Uploaded Brief summary of project | | | | Does your project location falls under out of any following areas | None of above Areas | | | | Proposed Built up area (Built up area or covered area on all the floors puttogether including its basement and other service areas which are proposed in the building or construction projects)(In Meter /Sqr) | 37617.70 | Existing Built Up Area(In Meter /Sqr) | 0 | | Does it attract any of the general conditions given below? | No | | | | Does it attract the specific condition given below? | No | | | | Interlinked Projects | No | | | | Whether separate application of interlinked projects has been submitted? | | Date of Submission | | | Whether the proposal involves approval/clearance under the Forest (Conservation) Act,1980? | No | | | | Whether the proposal involves approval/clearance under the wildlife (Protection) Act,1972? | No | | | | Whether the proposal involves approval/clearance under the C.R.Z notification,2011? | No | | | | Whether there is any Government Order/Policy relevent/relating to the site? | No | | | | Forest land involved(hectares) | 0 | | | | Is there any litigation pending against the project? | No | | |
| 1. | Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) | | S.No | Information/Checklist confirmation | Yes/No | Details there of (with approximate quantities/rates, wherever possible) with source of information data | | 1.1 | Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) | No | The land falls under the residential zone as per the Gurugram Master Plan 2031. The project has been received license No. 32 of 2020 dated 31.10.2020 for 2 Acres & remaining 1.35 acres license is applied for the development of commercial colony. | | 1.2 | Clearance of existing land, vegetation and buildings? | Yes | This is a proposed commercial colony and in case trees need to be cut we will take prior permission from concerned department. | | 1.3 | Creation of new land uses? | No | The proposed site has been licensed for the development of Commercial Colony & the same will be developed at this site. So, no creation of new land use is anticipated. | | 1.4 | Pre-construction investigations e.g. bore houses, soil testing? | Yes | Soil investigation was carried out and the results were found satisfactory. | | 1.5 | Construction works? | Yes | The construction activities will be confined within the project premises; there will be no physical change outside the project boundary. | | 1.6 | Demolition works? | No | Project site is subjected to construction on vacant land. Hence, no demolition work is required. | | 1.7 | Temporary sites used for construction works or housing of construction workers? | No | All the construction activity including stocking of raw materials will be confined within the project to site only. No temporary shelters for labour are proposed. Local labours from nearby area will be hired. Sanitation facilities will be developed at site. | | 1.8 | Above ground buildings, structures or earthworks including linear structures,cut and fill or excavations and fill or excavations | Yes | The highest building of the project will be erected up to 4 floors above ground & basements will be excavated up to 2 levels under the earth. | | 1.9 | Underground works including mining or tunneling? | No | No underground work including mining/ tunneling is required except excavation of earth. | | 1.10 | Reclamation works? | No | No reclamation work is required. | | 1.11 | Dredging? | No | No dredging is required. | | 1.12 | Offshore structures? | No | No offshore structure is required. | | 1.13 | Production and manufacturing processes? | No | No production/manufacturing process is involved as the proposed project is a construction of Commercial Colony. | | 1.14 | Facilities for storage of goods or materials? | Yes | Raw material will be stored at site in a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open. | | 1.15 | Facilities for treatment or disposal of solid waste or liquid effluents? | Yes | During operation, approximately 1,298 Kg/day domestic solid waste is estimated to be generated from the project activity; this will be collected from designated locations and segregated into inorganic and organic wastes.
The wastewater in operation phase will be treated up to tertiary level in STP having the capacity of 200 KLD and the treated sewage will be reused and remaining water will be discharge to Sewer line. | | 1.16 | Facilities for long term housing of operational workers? | No | Local labors will be hired from nearby areas during construction phase. So, there will be no need to create permanent facilities for long-term housing of operational workers. | | 1.17 | New road, rail or sea traffic during construction or operation? | No | The site has good connectivity to Golf course road, NH-48 & SH-13. Only internal roads, paths will be developed for vehicular movements for transportation of construction material during construction phase whereas internal tracks and paths will be developed for traffic circulation (to avoid any congestion) during operational phase. | | 1.18 | New road, rail, air water borne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | No | The site is well connected through the road network. The nearest highway is NH-48 which is ~3.6 Km away from project site towards NNW. | | 1.19 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | No | No diversion or closure of existing traffic routes is required. | | 1.20 | New or diverted transmission lines or pipelines? | No | There will not be any new/diverted transmission line or pipeline around the proposed project. | | 1.21 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | No | No impoundment, damming, culverting, realignment or other changes to the hydrology of surface watercourses is proposed. | | 1.22 | Stream crossings? | No | There is no stream running across the site. | | 1.23 | Abstraction or transfers of water from ground or surface waters? | No | Total water requirement of proposed project will be 207 KLD, which include 82 KLD for fresh water requirement and about 125 KLD treated water shall be reused for the various purposes like horticulture, HVAC & DG Set Cooling make-up and flushing. The fresh water source shall be supplied by GMDA/HSVP. Waste water generated will be 152 KLD which will be treated in STP having capacity of 200 KLD.
During construction phase, water demand for construction activity will be fulfilled from GMDA/HSVP | | 1.24 | Changes in water bodies or the land surface affecting drainage or run-off? | No | Runoff will increase due to increased paved surface. However, increased runoff will be managed by well-designed rainwater harvesting system and storm water management plan. | | 1.25 | Transport of personnel or materials for construction, operation or decommissioning? | Yes | Transport of personnel/material during construction and operation phase are envisaged. Adequate parking space within the project site for loading and unloading of materials will be provided.
Adequate internal parking space will be provided during operational phase of the project to the occupants of the premises as well as additional parking will be provided for the visitors. | | 1.26 | Long-term dismantling or decommissioning or restoration works? | No | No Long term dismantling or decommissioning or restoration work will be involved. | | 1.27 | Ongoing activity during decommissioning which could have an impact on the environment? | No | No decommissioning activity is involved, Hence, No impact on the environment by the proposed project is supposed. | | 1.28 | Influx of people to an area in either temporarily or permanently? | Yes | 100 Local laborers from nearby area will be employed during the construction phase. In the operation phase, there will be an influx of 7,906 persons in the form of staff & visitors. No alien species will be involved. | | 1.29 | Introduction of alien species? | No | The landscaping will be carried out with mainly local species with a few ornamental varieties of flora that are well suited to the local conditions. | | 1.30 | Loss of native species or genetic diversity? | No | There will be no significant impact on the native species or genetic diversity. | | 1.31 | Any other actions? | No | Not Applicable | | | 2 | Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 2.1 | Land especially undeveloped or agricultural land (ha) | No | Proposed site is licensed for the development of commercial colony. The Commercial Colony shall be constructed on land area measuring 13,556.948 m2/3.35 Acres. Local and indigenous plant species shall also be planted at proposed project site for green belt development. | | 2.2 | Water (expected source & competing users) unit: KLD | No | Total water requirement for the proposed project will be 207 KLD, which include 82 KLD for fresh water requirement, 125 KLD treated water requirement for the horticulture, HVAC Cooling, DG cooling, & flushing. | | 2.3 | Minerals (MT) | Yes | Minerals such as sand and aggregates will be required during the construction phase. | | 2.4 | Construction material – stone, aggregates, sand / soil (expected source – MT) | Yes | All materials for construction will be arranged through selected suppliers. | | 2.5 | Forests and timber (source – MT) | Yes | All material forests and timber will be provided by selected suppliers. However, steel frames etc. shall be used to minimize the use of timber. | | 2.6 | Energy including electricity and fuels (source, competing users) Unit: fuel (MT),energy (MW) | Yes | The expected power demand of 2,405.46 KW will be supplied by DHBVN.
Power backup for the proposed project will be through 3 nos. DG sets of total capacity of 3,520 KVA i.e. 2x1010 KVA & 1x1500 KVA. | | 2.7 | Any other natural resources (use appropriate standard units) | No | No other natural resource will be involved in the project except the mentioned above. | |
| 3 | Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health | | S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 3.1 | Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies | No | This is proposed Commercial Colony project, Hence, No storage of hazardous chemicals (as per MSIHC Rules) will be done except HSD. HSD is required to run standby D.G. sets, for which the stored quantity of diesel will be below the threshold limit specified in the MSIHC rules. Necessary permission will be obtained from the Explosives Department if required as per norms. | | 3.2 | Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) | No | Suitable drainage and waste management measures (with frequent spray of insecticides etc.) will be adopted in both the construction and operational phase such that there will be no stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. | | 3.3 | Affect the welfare of people e.g. by changing living conditions? | Yes | Socio-economic standard of people will improve due to increased employment opportunities provided by this project. This will lead to better quality of life and will also set a standard for future developments in the area. | | 3.4 | Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc. | No | Impacts of this type are not expected. | | 3.5 | Any other causes | No | No other causes are involved except the mentioned above. | |
| 4 | Production of solid wastes during construction or operation or decommissioning (MT/month) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 4.1 | Spoil, overburden or mine wastes | No | No such spoil, overburden or mine wastes will be generated. | | 4.2 | Municipal waste (domestic and or commercial wastes) | Yes | The total municipal solid waste to be generated is approximately 1,298 Kg/day. The inorganic non-biodegradable wastes will be sold to authorized vendors for recycling and the biodegradable wastes will be treated in OWC within the project according to Solid Waste Management Rules, 2016. | | 4.3 | Hazardous wastes (as per Hazardous Waste Management Rules) | Yes | Approx. 200 liter/year spent oil from DG sets will be generated. It will be stored in HDPE drums in isolated covered facility. This spent oil will be sold to vendors authorized by HSPCB / MoEF & CC for the treatment of same. Suitable care will be taken so that spills/leaks of spent oil from storage could be avoided. | | 4.4 | Other industrial process wastes | No | Not applicable as this is proposed Commercial Colony project. | | 4.5 | Surplus product | No | Not applicable as this is proposed Commercial Colony project. | | 4.6 | Sewage sludge or other sludge from effluent treatment | Yes | Approx. 11.42 kg/day sludge waste will be generated. Sludge generated from the STP plant will be dried and later will be used as manure for green belt development. | | 4.7 | Construction or demolition wastes | Yes | The construction waste will consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging materials etc.
Recyclable waste construction materials will be sold to authorized recyclers. Excavated soil will be stored separately & will be reused for backfilling, leveling purposes & top soil will be stored to be used for landscaping at later stages. | | 4.8 | Redundant machinery or equipment | No | Not applicable | | 4.9 | Contaminated soils or other materials | No | Contaminated soils or other materials will not be generated. | | 4.10 | Agricultural wastes | Yes | Approx. 0.13 Kg/day agricultural waste will be generated. | | 4.11 | Other solid wastes | No | Not applicable as this is proposed Commercial Colony project. | |
| 5 | Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr) |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 5.1 | Emissions from combustion of fossil fuels from stationary or mobile sources | Yes | The project does not envisage any major air pollution sources except operation of DG sets during power failure and vehicular traffic. The emission from stationary sources (D.G. sets) has been predicated. The DG sets will be the only source of air emission used during the operation phase in case of power failure. The DG stacks of adequate height (as per CPCB norms) will be provided to disperse the pollutant generated from D.G. sets. | | 5.2 | Emissions from production processes | No | No production process is involved as it is proposed Commercial Colony project. Hence, there will be no such emissions. | | 5.3 | Emissions from materials handling including storage or transport | Yes | Small quantities of fugitive emissions are envisaged during transport and handling of construction materials. Such emissions will be temporary and controlled by the use of sprinkling, anti-smog gun and other viable techniques like covering of loose material. | | 5.4 | Emissions from construction activities including plant and equipment | Yes | This will be restricted to the construction phase and the construction site only. | | 5.5 | Dust or odours from handling of materials including construction materials, sewage and waste | Yes | Dust is anticipated during loading and unloading of construction material and excavation of upper earth surface and other construction activities. These will however be temporary in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. | | 5.6 | Emissions from incineration of waste | No | Not applicable. There will not be any incineration of waste as this is proposed Commercial Colony project. | | 5.7 | Emissions from burning of waste in open air (e.g. slash materials, construction debris) | No | Open burning of biomass/other material will be prohibited on site. | | 5.8 | Emissions from any other sources | No | Not Applicable | |
| 6 | Generation of Noise and Vibration, and Emissions of Light and Heat: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 6.1 | From operation of equipment e.g. engines, ventilation plant, crushers | Yes | The machinery to be used for construction will be of high standard and will adhere to international standard. These standards itself take care of noise control/vibration control and air emission control. Hence, insignificant impacts due to construction machinery are envisaged.
Source of noise in the operational phase will be from DG sets (which will be used in operation only during power failure) and pumps & motors. | | 6.2 | From industrial or similar processes | No | No industrial processes will be carried out in the proposed project except due to running of various construction equipment/machinery & D.G. Sets during operational phase of the projects. Proper maintenance of machineries will reduce the generation of noise and vibration. All the workers will be equipped with PPE’s during construction phase and D.G. sets will be installed in acoustic enclosures with proper padding system to reduce vibration impact. | | 6.3 | From construction or demolition | Yes | Due to various construction activities, there will be short-term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities:
• Concreting, mixing & operation of DG sets.
• Construction plant and heavy vehicle movement. | | 6.4 | From blasting or piling | No | No blasting or mechanized piling will be done. | | 6.5 | From construction or operational traffic | Yes | Some noise will be generated from vehicular movement in the construction phase which will be confined to project site due to the barricading around the site as per MoEF&CC Notification 25.01.2018 and during the operational phase, all the parking will be confined to basements | | 6.6 | From lighting or cooling systems | No | No significant noise impact will result from lighting or cooling systems. | | 6.7 | From any other sources | No | There will be no other sources for noise & vibration generation except the mentioned above. | |
| 7 | Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 7.1 | From handling, storage, use or spillage of hazardous materials | No | The used oil from DG sets will be carefully stored in HDPE drums and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per Hazardous And Other Wastes (Management & Trans boundary Movement) Rules, 2016. | | 7.2 | From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) | No | There will be no discharge of untreated sewage on land or into water bodies. Adequate treatment of sewage will be carried out in STP having the capacity of 200 KLD within the project premises.
Total waste water generated=152 KLD
Flushing:87 KLD
Horticulture:13 KLD
HVAC Cooling :24 KLD
DG Cooling :1 KLD | | 7.3 | By deposition of pollutants emitted to air into the land or into water | No | The DG Sets will be provided with stacks of adequate height. Hence dispersion will be achieved and avoid deposition of pollutants in significant concentrations at any single location. | | 7.4 | From any other sources | No | No other sources are involved except the mentioned above. | | 7.5 | Is there a risk of long term build up of pollutants in the environment from these sources? | No | There will be no such risk in the coming future. | |
| 8 | Risk of accidents during construction or operation of the Project, which could affect human health or the environment |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 8.1 | From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances | No | This is a proposed Commercial Colony project and does not involve major hazardous construction activity. Hence chances of explosions, spillages, fires etc. are minimal.
During construction, suitable personal protective equipment will be provided to all construction workers as required under the health & safety norms. | | 8.2 | From any other causes | No | No other causes are involved except the mentioned above. | | 8.3 | Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? | No | The project falls under seismic active Zone IV according to the Indian Standard Seismic Zoning Map.
Suitable seismic coefficient will be adopted in horizontal and vertical direction respectively, while designing the structure.
There is no possibility of flood as per records available on the proposed project site. | |
| 9 | Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality |
| S.No | Information/Checklist confirmation | Yes/No | Details thereof (with approximate quantities/rates, wherever possible) with source of information data | | 9.1 | Lead to development of supporting utilities, ancillary development or development stimulated   by the project which could have impact on the environment e.g.:
- Supporting infrastructure (roads, power supply,waste or waste water treatment, etc.)
- housing development
- extractive industries
- supply industries
- Other
| Yes | The proposed project is for commercial use; it may lead to development of supporting services and infrastructure in and around the area.
The project will have positive impact on the ancillary infrastructure like road, markets, public health, amenities, conveyance facilities etc.
The project is proposed for the commercial colony.
Not applicable
Not applicable
Not applicable | | 9.2 | Lead to after-use of the site, which could have an impact on the environment | No | Not Anticipated | | 9.3 | Set a precedent for later developments | No | Not applicable | | 9.4 | Have cumulative effects due to proximity to other existing or planned projects with similar effects | No | Not applicable | | | (III) | Environmental Sensitivity | | S.No | Areas | Name/Identity | Aerial distance (within 15km.) Proposed project location boundary | | 1 | Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value | Yes | Sultanpur National Park- 16.6 km towards WNW
Ashola Bhatti Wild life sanctuary- 10 km towards East | | 2 | Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests | No | There is no important or sensitive for ecological reasons Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains & forests. | | 3 | Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration | Yes | Sultanpur National Park- 16.6 km towards WNW
Ashola Bhatti Wild life sanctuary- 10 km towards East | | 4 | Inland, coastal, marine or underground waters | No | Not Applicable | | 5 | State, National boundaries | Yes | Haryana-Delhi State Boundary - 6 KM | | 6 | Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas | Yes | • SH-13--1.7 KM
• NH-48--3.6 KM
• Golf Course Road--1 KM | | 7 | Defence installations | No | Not Applicable | | 8 | Densely populated or built-up area | Yes | Village Jharsa- ~ 2.5 Km towards North
Village Tikri- ~ 2.2 Km towards WNW | | 9 | Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) | Yes | Schools/Hospitals/ Police Stations
? Presidium School – ~08 Km towards NE
? Navyandhra School - ~1.3 km towards SW
Hospitals
? Park Hospital – ~1 Km towards WNW
? Surya Deep Hospital – ~1.5 km towards North
Worship
? Shree Shiv Shakti Temple- ~1.9 Km towards WSW
? Shiv Mandir- ~0.5 Km towards NNW | | 10 | Areas containing important, high quality or scarce resources.(ground water resources,surface resources,forestry,agriculture,fisheries,tourism,minerals) | No | Ground-water resources in the study area are depleting at very fast rate and are declared are scarce resources. | | 11 | Areas already subjected to pollution or environmental damage.(those where existing legal environmental standards are exceeded) | No | There are no areas which are subjected to pollution or environmental damage. All parameters of Air, Water and Noise etc. will be maintained within permissible limit specified by SPCB/CPCB with proper mitigation measures. | | 12 | Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) similar effects | No | The site falls under the zone IV as per the Seismic Zone Map of India.
There are no possibilities of proposed project site getting as per records available. | | | Essential Details Sought |
|---|
| S. No. | EDS Sought Date | EDS Sought | Letter |
|---|
| NO Record | | | Additional Details Sought |
|---|
| S. No. | ADS Sought Date | ADS Sought | Letter |
|---|
| NO Record | | | | Undertaking | | I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. | | | | Name of Applicant | Arvinder Dingra | | Designation | VicePresident | | Name of Company (Applicant Name should not be given here) | M/S PYRAMID CITY PROJECTS LLP & OTHERS IN COLLABORATION WITH ELAN LTD. | | Address | L1/100, First Floor, Street No. 25, Sangam Vihar, South Delhi, New Delhi |
|
|