Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Harinagar Sugar Mills Ltd.
(b)Name of the Company / Organisation HARINAGAR SUGAR MILLS LTD
(c)Registered Address Harinagar,,West Champaran,Bihar-845103
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant SL Baheti Baheti
(b)Designation (Owner/ Partner/ CEO) CGM
(c)Address Harinagar Sugar Mills Ltd,PO Harinagar,Ramnagar,West Champaran,Bihar-845103
(d)Pin code 845103
(e)E-mail harinagarsugar@gmail.com
(f)Telephone No. 6256-224223
(g)Fax No. 224215
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(j) Sugar Industry
(b)Minor Project/ActivityNIL
(c)Category B2
(d)Proposal Number SIA/BR/IND2/198424/2021
(e)Master Proposal Number(Single Window) SW/198423/2021
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khata No- 292, 272, 15, 17, 274, 32, 280, 16, 18,
(b)Pincode 845103
(c)Bounded Latitudes (North)
From
Degree 27.151768
Minutes
Second
From
Degree 27.156235
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 84.328141
Minutes
Second
From
Degree 84.330811
Minutes
Second
(e)Survey of India Topo Sheet No. 72 A8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 102
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Bihar
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)BiharWest ChamparanRamnagarHarinagar
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Ranchi
(iii)Letter No. 113-71/ROR-2021/4522
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Sugar Mill11500350015000Tons Crushed per Day(TCD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Sugar Mill11500350015000Expansion will be done by upgrading the existing equipments. No additional boiler will be installed
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Feb 2019
(iv)Valid Upto 15 Feb 2024
(v)File No. 295
(vi)Application No. 2317426
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 56.46
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.05
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.05
(e) Funds Allocated for Environment Management Capital(%) 0.09
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 15000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 15000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sugar cane2250000Tons per AnnumLocal FarmersRoad5 OthersNot ApplicableCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater25000.1Copy of Permission LetterPipelineOthersBorewellCGWA/NOC/IND/ORIG/2018/393821 Aug 20183502
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sugar Mill18026000Activated Sludge ProcessReuse within the Plant & Recycling1802
16.1.
(a)Total Waste Water Generation 1802
(b)Total Discharged Water 0
(c)Total Reused Water 1802
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Press MudIndustrial Waste666Tons0RoadOthersBiocompost
(2.)BagasseIndustrial Waste5657Tons0RoadOthersBoiler Fuel
(3.)MolassesIndustrial Waste756Tons0RoadOthersRaw materials for own distillery project
(4.)Boiler AshIndustrial Waste32Tons0RoadOthersBio composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube73.10.14.8677.96100
(2.)PM2.5Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)SO2Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler 74 TPHBagasee402.73OthersPM91.6
(2.)Boiler 78 TPHBagasee402.73OthersPM104.1
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3500
(b)Source Own Cogeneration Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 14.67
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 14.67
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 14.67
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 14.67
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)OthersIndustrial5.47
(2.)Green belt8.9
Total 14.37
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA00
(2.)Critically Polluted Areana00
(3.)NPANA00
(4.)ESAsNA00
(5.)ESZsNA00
(6.)CorridorsNA00
(7.)Wildlife CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)ForestNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 14.37
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Ramrekha Rivulet
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River Sikrahna
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 150
(f)Total Manpower 10
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt8.908
(2.)Percentage of Total Project Area62062
(3.)No. of Plants1950050020000
(4.)Funds Allocated151025
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialLocal Farmers will be benefitted
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0120
(ii)Name of the EIA Consultant PARAMARSH
(iii)Address B1/67, SECTOR- G, JANKIPURAM LUCKNOW, UTTAR PRADESH
(iv)Mobile No. 9044905077
(v)Landline No. 0522411425
(vi)Email Id paramarsh.env@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan
(b)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(c)Uploaded Cover Letter Copy of Cover Letter
(d)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 Copy of Updated Form1
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSL Baheti Baheti
DesignationCGM
Name of Company (Applicant Name should not be given here)HARINAGAR SUGAR MILLS LTD
AddressHarinagar
Print