Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for proposed expansion of Acrylic Polymers Emulsion, Polymers of Vinyl Acetate, Vinyl Copolymers, Constructions Chemical & addition of solvent based adhesive by M/s Jesons Industries Ltd. (Unit V) at Plot No. 29 A & B, KIE Industrial Estate, Mundiyaki, Tehsil Roorkee, District Haridwar, Uttarakhand
(b)Name of the Company / Organisation M/S. JESONS INDUSTRIES LTD
(c)Registered Address Plot No. 29 A & B, KIE Industrial Estate,Haridwar,Uttarakhand-247667
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Anil Kumar Singh
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address Plot No. 29 A & B, KIE Industrial Estate,Haridwar,Uttarakhand-247667
(d)Pin code 247667
(e)E-mail jesonsindustrieseia@gmail.com
(f)Telephone No. 0-00000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/UK/IND2/59204/2009
(e)Master Proposal Number(Single Window) SW/188505/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 29 A and B
(b)Pincode 247656
(c)Bounded Latitudes (North)
From
Degree 29.44.21
Minutes
Second
From
Degree 29.44.21
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.50.48
Minutes
Second
From
Degree 77.50.50
Minutes
Second
(e)Survey of India Topo Sheet No. 53K/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 268
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandHaridwarRoorkeePlot No. 29 A & B, KIE Industrial Estate, Mundiyaki
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number EC-39/2010/253
(b)Date of Apply of EC 08 Apr 2009
(c)Date of Issue of EC 31 Dec 1899
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located within notified Industrial Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Dehradun
(iii)Letter No. 0
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit N/A
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Acrylic Polymers Vinyl Acetate Vinyl Copolymers240023554755OthersMT/MonthRoad
(2.)Construction Chemicals4500450OthersMT/MonthRoad
(3.)Solvent Based Adhesive013501350OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DG set2500250KVA
(2.)DG set125380380125 KVA DG set replace with 380 KVA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Aug 2020
(iv)Valid Upto 31 Mar 2021
(v)File No. AWH-40565
(vi)Application No. 254506
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 3.0
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.47
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.25
(e) Funds Allocated for Environment Management Capital(%) 15.67
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 20
(b)Existing quantity of raw material/fuel 46
(c)Total quantity of raw material/fuel 66
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acrylic acid224784Tons per AnnumLocalRoad1500 OthersLocal Industry and WarehouseCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Dec 2019 To 28 Feb 2020
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube584847.8160
(2.)NOxMicro Gram per Meter Cube25142280
(3.)SO2Micro Gram per Meter Cube17915.580
(4.)PM10Micro Gram per Meter Cube876078100
(5.)OthersCOMili Gram per Meter Cube0.60.10.3402
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsCoppermg/l000.051.5
(2.)TDSmg/l5805235002000
(3.)Total Hardnessmg/l380158200600
(4.)pHNA7.837.056.58.5
(5.)OthersIronmg/l0.20.10.30.3
(6.)Chloridesmg/l53432501000
(7.)TSSmg/l0000
(8.)Fluoridemg/l1.120.121.01.5
    14.3.     No. of Surface Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.67.2C
(2.)BODmg/l134.8D
(3.)CODmg/l57.615.8D
(4.)DOmg/l6.44.1C
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.250.375
(2.)Leq(Night)A-weighted decibels(dB(A))56.340.745
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.787.35
(2.)N(Nitrogen)Kilogram per hectare138106
(3.)Electric ConductivityOthersmicromhos/cm256224
(4.)K(Potassium)Kilogram per hectare00
(5.)P(Phosphorus)Kilogram per hectare00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.45 To 6.38
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.08 To 5.85
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater95.00.1 Not Appliacble PipelineTube WellCGWA/NOC/IND/ORIG/2019/479627 Feb 201995.0
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Water4.05.0MBBR based S.T.P.Green Belt Renewal Plant4.0
(2.)Industrial Waste water45Tertiary TreatmentReuse within the Plant & Recycling4.0
16.1.
(a)Total Waste Water Generation 8
(b)Total Discharged Water 0
(c)Total Reused Water 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste or ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)91.2Tons25RoadCo-Processing
(2.)Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.1Tons25RoadAuthorized Recyclers
(3.)Domestic wasteMunicipal Solid Waste9.9Tons10RoadAuthorized Recyclers
(4.)E.T.P SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)15.6Tons25RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Discarded ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)104.4Tons25RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.02501.0710.0780
(2.)PM2.5Microgram per Meter Cube02500060
(3.)PM10Microgram per Meter Cube872502.0389.03100
(4.)NOxMicrogram per Meter Cube122501.7613.7680
(5.)Others(Specify)COMicrogram per Meter Cube0.225000.22
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler -1Furnace Oil150.3PM1067
(2.)DG-1HSD120.1SO214.6
(3.)Boiler-2Furnace Oil150.3PM1066.0
(4.)DG-2HSD120.15SO223.9
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source UPCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 02
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.65
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.6500
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 0
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0.65
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : 0 0
    Total 0.65
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant0.2703
(2.)OthersOpen and Road Area0.2985
(3.)Green belt0.0812
Total 0.65
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0NA
(2.)ESZsNA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)WLSNA0NA
(6.)NPANA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.65
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Ganga Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Village Pond
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 85
(b)Permanent Employment-During Operation 65
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt8120812
(2.)Percentage of Total Project Area122537
(3.)No. of Plants100500600
(4.)Funds Allocated11011
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialGenerate more revenue for district administration.
(2.)Environmental33 % of project area will be provided as Green Belt, which increase the aesthetic beauty of the area as well as work as barrier for Air and Noise pollution.
(3.)SocialGenerate more employment opportunities and 1.5 % of project cost will be spend as CER.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0120 (Rev.01)
(ii)Name of the EIA Consultant Paramarsh (Servicing Environment & Development)
(iii)Address MS-1/10, Sector-A, Sitapur Road Yojna (near St. Anthony School), Ram Ram Bank Chauraha, Aliganj, Lucknow, Uttar Pradesh-226021
(iv)Mobile No. 9837242463
(v)Landline No. 0594726963
(vi)Email Id iglemdk@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 May 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAnil Kumar Singh
DesignationGeneral Manager
Name of Company (Applicant Name should not be given here)M/S. JESONS INDUSTRIES LTD
AddressPlot No. 29 A & B, KIE Industrial Estate