Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Indian Dyestuff & Chemicals Mfg. Co.
(b)Name of the Company / Organisation INDIAN DYESTUFF & CHEMICALS MFG. CO.
(c)Registered Address PLOT NO. DP-70 & DP-71, Saykha industrial Estate Ta: Vagra, Dist.: Bharuch,,Bharuch,Gujarat-392012
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Ramnath B Gupta
(b)Designation (Owner/ Partner/ CEO) PROPRIETOR
(c)Address Indian Dyestuff & Chemicals Mfg. Co. Z-4, Flower Valley Commercial Complex, Eastern Express Highway Thane,,Vagra,Bharuch,Gujarat-382012
(d)Pin code 382012
(e)E-mail idcmec@rediffmail.com
(f)Telephone No. 0-00000000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/55320/2020
(e)Master Proposal Number(Single Window) SW/163551/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. DP-70 & DP-71
(b)Pincode 392340
(c)Bounded Latitudes (North)
From
Degree 21.4740
Minutes
Second
From
Degree 21.4743
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.4942
Minutes
Second
From
Degree 72.4944
Minutes
Second
(e)Survey of India Topo Sheet No. 00
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 25
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 45
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagraSaykha GIDC
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/116608/2020
(b)Date of Apply of TOR 04 Aug 2020
(c)Date of Issue of TOR / Standard ToR 17 Aug 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The Project is located in GIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)S.S.Vessels9.00 KL02 NOS
(2.)S.S.Vessels4.50 KL02 NOS
(3.)HDPE / PP Neutch1500 / 12006 NOS
(4.)Storage Tank - S.S20 KG1 NO
(5.)Storage Tank - HDPE15 KL2 NOS
(6.)Chilled Water System6 TPH1 NO
(7.)Cooling Tower100 KL4 NOS
(8.)D G Set160 / 200KVA2 NOS
(9.)Water Storage Tank30 KL2 NOS
(10.)Storage Tank - M.S15 KL1 NO
(11.)S.S.Vessels4.00 KL01 NO
(12.)Centrifuge48"4 NOS
(13.)Thermic Fluid Heater10 LAC LCAL2 NOS
(14.)M.S.G.L. Vessel4.00 KL02 NOS
(15.)Blenders S.S5.002 NOS
(16.)Spray Dryer1000 LPH1 NO
(17.)DM Water Tank35000 KL1 NO
(18.)Filer Press48" X 301 NO
(19.)Heat Exchanger50 M22 NOS
(20.)Coal Handling SystemSUITABLE2 NOS
(21.)PP FRP HDPE30.00 KL01 NO
(22.)Steam Boiler6 TPH1 NO
(23.)Belt ConveyorSUITABLE1 NO
(24.)M.S.R.L. Vessel9.00 KL01 NO
(25.)M.S.Vessel4.403 NOS
(26.)Dryer - Sfd10 LAC KCAL2 NOS
(27.)Dryer Tray Vaccum96 TONS3 NOS
(28.)S.S.Vessels7.85 KL01 NO
(29.)S.S.Vessels1.80 KL01 NO
(30.)S.S.Vessels5.30 KL01 NO
(31.)M.S.R.L. Vessel18.00 KL01 NO
(32.)Air Compressor110 CFM2 NOS
(33.)Hot Air Generator3 LAC KCAL2 NOS
(34.)S.S.Vessels15.00 KL02 NOS
(35.)M.S.Vessel3.201 NO
(36.)Storage Tank - S.S15 KL2 NOS
(37.)S.S.Vessels4.40 KL02 NOS
(38.)M.S.R.L. Vessel17.20 KL01 NO
(39.)PP / FRP / HDPE8.00 KL05 NO
(40.)Pulveriser S.S.NA2 NOS
(41.)Dryer FBB1600 KG /HR2 NOS
(42.)Goods Carrying Lift - Eot2 M.T.4 NOS
(43.)M.S.Vessel5.501 NO
(44.)PP FRP HDPE30.00 KL01 NO
(45.)Filer Press36" X201 NO
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Group 1: DYESTUFF IN POWDER FORM3000Tons per AnnumRoad,Rail
(2.)GROUP 2: DYESTUFF IN LIQUID FORM5400Tons per AnnumRoad,Rail
(3.)GROUP 3: FORMULATION OF DYES - POWDER AND LIQUID2400Tons per AnnumRoad,Rail
(4.)GROUP 4: DIETHYL META AMINO PHENOL1200Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 9.72
(b) Funds Allocated for Environment Management (Capital) (in crores) 3.79
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.19
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 4.38
(e) Funds Allocated for Environment Management Capital(%) 38.99
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3510
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3510
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HCL150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(2.)MonoMethylAniline50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(3.)Benzaldehyde50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(4.)Octanol50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(5.)Aniline50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(6.)Caustic Soda50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(7.)Chloro sulfonic acid120Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(8.)Soda Ash50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(9.)Triethanol Amine100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(10.)Sodium nitrite50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(11.)Sulphanilic Acid200Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(12.)Amine50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(13.)PNA50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(14.)PhosphoricAcid50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(15.)DASA50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(16.)Acetic Acid150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(17.)Sodium Sulphate150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(18.)Metanilic Acid120Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(19.)Formaldehyde150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(20.)Propylene Glycol50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(21.)MPD50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(22.)Para Anisidine50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(23.)Meta pheniline diamine100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(24.)Salt150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(25.)Sulphamic Acid180Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(26.)Phthalic Anhydride50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(27.)Caustic Lye100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(28.)Sulphuric Acid150Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(29.)CPC blue50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(30.)PNTOSA100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(31.)Calcium Chloride50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(32.)Diphenylamine100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(33.)Xylene20Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(34.)Dimethyl Aniline200Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(35.)Oxalic Acid100Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(36.)Di ethyl aniline50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(37.)Barium Chloride50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(38.)H acid50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
(39.)Acetic Anhydride50Tons per AnnumOpen MarketRoad25 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube54.7523.4753.2860
(2.)NOxMicro Gram per Meter Cube24.9115.4324.0880
(3.)SO2Micro Gram per Meter Cube17.158.2416.8480
(4.)PM10Micro Gram per Meter Cube84.6261.6483.75100
    14.2.     No. of Ground Water Monitoring Locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.217.168.58.5
(2.)Chloridesmg/l41326310001000
(3.)Fluoridemg/l0.990.741.51.5
(4.)TDSmg/l3078215620002000
(5.)Total Hardnessmg/l486284600600
(6.)TSSmg/l0.50.311
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.14.8D
(2.)pHNA7.767.23D
(3.)BODmg/l7.76.0D
(4.)CODmg/l3023D
    14.4.     No. of Ambient Noise Monitoring Locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))56.735.375
(2.)Leq(Day)A-weighted decibels(dB(A))72.845.585
    14.5.     No. of Soil Sample Monitored Locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.817.24
(2.)K(Potassium)Milligram per Kilogram0.480.25
(3.)N(Nitrogen)Milligram per Kilogram0.980.77
(4.)P(Phosphorus)Milligram per Kilogram0.700.52
(5.)Electric ConductivityMillisiemens per Centimetre14501059
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13 To 15
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC33300Copy of Permission LetterPipelineOthersGIDC0022 Sep 2020350
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial operation320350Primary, Secondary ,tertiaryOthersCETP and In house Spray Dryer120200
16.1.
(a)Total Waste Water Generation 320
(b)Total Discharged Water 200
(c)Total Reused Water 120
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used Filter ClothHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Liquor AmmoniaHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Tons50RoadAuthorized Recyclers
(3.)Evaporation saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)45Tons50Road,RailTreatment, Storage and Disposal Facility(TSDF)
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3Tons50RoadOthersreuse
(5.)Discarded ContainerHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)500Tons50Road,RailTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.201.250.0580.25100
(2.)PM2.5Microgram per Meter Cube50.781.250.0350.8160
(3.)SO2Microgram per Meter Cube15.921.250.0215.9480
(4.)NOxMicrogram per Meter Cube24.610.750.0324.6480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set (160 KVA & 220 KVA) Stand By 2 Nos.Diesel050.1PM10,SO2,NOx150,100,50
(2.)Thermic Fluid Heater (10 Lakhs Kcal/hr.) 2 nos.Imported Coal250.2PM10,SO2,NOx150,100,50
(3.)Steam Boiler (6.0 TPH)Imported Coal250.2PM10,SO2,NOx150,100,50
(4.)Fluid Bed DryerNA150.2PM10150
(5.)Hot Air Generator 1 (3 Lakhs Kcal/hr.)Imported Coal200.2PM10,SO2,NOx150,100,50
(6.)Spray Dryer 1000 LPH for ProductNA200.2PM10150
(7.)Reaction VesselNA150.2NH3
(8.)Spin Flash Dryer 1 (200 kg/hr) 2 nos.NA150.2PM10150
(9.)PulveriserNA150.2PM10150
(10.)Vacuum DryerNA150.2PM10150
(11.)Hot Air Generator 2 (3 Lakhs Kcal/hr.)Imported Coal200.2PM10,SO2,NOx150,100,50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set (160 KVA & 220 KVA) Stand By 2 Nos.
(e)Stack Height (in m) 05
20.
Land Ownership Pattern:
(a)Forest Land 00
(b)Private Land 1.4122
(c)Government Land 00
(d)Revenue Land 00
(e)Other Land 00
    Total Land 1.4122
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 00
(b)Waste/Barren Land 00
(c)Grazing/ Community Land 00
(d)Surface Water Bodies 00
(e)Settlements 00
(f)Industrial 1.4122
(g)Forest 00
(h)Mangroves 00
(i)Marine Area 00
(j)Others : NA 00
    Total 1.4122
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Main Plant1.4122NA
Total 1.4122
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaAnkleswar35Not in study area
(2.)ESZsNA50Not in study area
(3.)Wildlife CorridorsNA50Not in study area
(4.)ESAsNA50Not in study area
(5.)WLSNA50Not in study area
(6.)NPANA50Not in study area
(7.)CorridorsNA50Not in study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA50Not in study Area
(2.)ForestNA50Not in study Area
(3.)Defence InstallationsNA50Not in study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.4122
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in Rs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 30
(e)No. of working days 300
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.4665
(b)Percentage of Total Project Area 33.03
(c)No. of Plants to be Planted 1300
(d)Funds Allocated for Plantation 0.2
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe project proposed with adequate EMS
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 20606
(ii)Name of the EIA Consultant Satva Environ Consultancy
(iii)Address 14, 15 Gopal Patel Estate, First floor, Opp- Baroda Express Highway CTM, Ahmedabad
(iv)Mobile No. 9426347013
(v)Landline No. 0792585321
(vi)Email Id satvaenviron@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 06 Dec 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File NA
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRamnath B Gupta
DesignationPROPRIETOR
Name of Company (Applicant Name should not be given here)INDIAN DYESTUFF & CHEMICALS MFG. CO.
AddressPLOT NO. DP-70 & DP-71, Saykha industrial Estate Ta: Vagra, Dist.: Bharuch