Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Nayal Dhapola Soapstone mining Project
(b)Name of the Company / Organisation MANISH NAND KISHORE
(c)Registered Address add- 17 floor maharishi Apartmaent, Bhind civil hosipatal Shahi Bagh,Ahmadabad,Gujrat-30004,,Bageshwar,Uttarakhand-263619
(d)Legal Status of the Company Private
2.
Address for the correspondence:
(a)Name of the Applicant Manish Nand Kishore
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address add- 17 floor maharishi Apartmaent, Bhind civil hosipatal Shahi Bagh,Ahmadabad,Gujrat-30004,Bageshwar,Uttarakhand-263619
(d)Pin code 263619
(e)E-mail naymanish@gmail.com
(f)Telephone No. 522-4011565
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity1(a) Mining of minerals
(b)Minor Project/Activity1(a) Mining of minerals
(c)Category B1
(d)Proposal Number SIA/UK/MIN/57692/2018
(e)Master Proposal Number(Single Window) SW/180250/2020
(f)EAC concerned (for category A Projects only) Non-Coal Mining
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. as mention in approved mining plan
(b)Pincode 263619
(c)Bounded Latitudes (North)
From
Degree 295108.48
Minutes
Second
From
Degree 295122.34
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 795110.55
Minutes
Second
From
Degree 795132.24
Minutes
Second
(e)Survey of India Topo Sheet No. 53O/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1273.30
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 1.0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttarakhand
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)UttarakhandBageshwarBageshwarNayal Dhapola
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number 18/SEAC
(b)Date of Apply of TOR 28 Sep 2018
(c)Date of Issue of TOR / Standard ToR 12 Feb 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Sep 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Jan 2020
Distance of Public Hearing Venue from the Proposed Project :1.0
vill- Nayal Dhapola
State :Uttarakhand
District :Bageshwar
Tehsil :Bageshwar
Village :Nayal Dhapola
51Water sparkling, local employment, road maintaninance , natural water resource conservationOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Soapstone/mining/10.841ha115298Otherstones in 5 yearsRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.876
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.114
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0438
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 0.114
(e) Funds Allocated for Environment Management Capital(%) 13.01
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Soapstone30201Tons per Annummining areaRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2020 To 31 May 2020
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Nano Gram per Meter Cube0000
(2.)PM2.5Nano Gram per Meter Cube0000
(3.)SO2Mili Gram per Meter Cube0000
(4.)NOxMili Gram per Meter Cube0000
    14.2.     No. of Ground Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHmg/l0000
(2.)Total Hardnessmg/l0000
(3.)Fluoridemg/l0000
(4.)TDSmg/l0000
(5.)TSSmg/l0000
(6.)Chloridesmg/l0000
(7.)Heavy MetalsHgmg/l0000
    14.3.     No. of Surface Water Monitoring Locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00A
(2.)BODmg/l00A
(3.)CODmg/l00A
(4.)DOmg/l00A
    14.4.     No. of Ambient Noise Monitoring Locations : 3
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored Locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram00
(2.)pHMilligram per Kilogram00
(3.)N(Nitrogen)Milligram per Litre00
(4.)P(Phosphorus)Milligram per Kilogram00
(5.)Electric ConductivityMillisiemens per Centimetre00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 16 To 18
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater5.981.0 Not Appliacble modeOtherswater tankerTube Well132406 Sep 20185.98
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA000Reuse within the Plant & Recycling,Green Belt Renewal Plant0
16.1.
(a)Total Waste Water Generation 0
(b)Total Discharged Water 0
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)plastic wastePlastic Waste0Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube00000
(2.)SO2Microgram per Meter Cube00000
(3.)NOxMicrogram per Meter Cube00000
(4.)PM10Microgram per Meter Cube00000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 10.841
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 10.841
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 10.841
(b)Waste/Barren Land 0
(c)Grazing/ Community Land 0
(d)Surface Water Bodies 0
(e)Settlements 0
(f)Industrial 0
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : NA 0
    Total 10.841
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Quarry Area10.841
Total 10.841
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNA0NA
(2.)CorridorsNA0NA
(3.)Wildlife CorridorsNA0NA
(4.)NPANA0NA
(5.)Critically Polluted AreaNA0NA
(6.)WLSNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.841
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species LEOPERD
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 300000
(iii)Period of Implementation 5
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. 800/9-2
(iii)Date of issue 09 Sep 2020
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 2
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 52
(e)No. of working days 240
(f)Total Manpower 54
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 1.841
(b)Percentage of Total Project Area 16.98
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 1140000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialPROVIDE RAW MATERIAL TO VARIOUS INDUSTRIES AND LIVELIHOOD TO LOCAL PEOPLE
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)soapstone (talc)Minor
2.
Mine Capacity in ROM (Run of Mine) 115298
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 1324 /mukhyakhanij/khananyojna136/2018-19
(b)Date of Approval 06 Sep 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Directorate
(e)Approved Mining Lease Area 10.841
(f)Approved Capacity 115298
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 1.41311
(b)Mineable Reserves (Million Ton) 1.41311
(c)Extractable Reserves(Million Ton) 0.1152
(d)Percent(%) of Extraction 9
(e)Grade of Coal /Ore /Mineral 1
(f)Stripping Ratio 0 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) 0
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 47
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 10841
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 21 Feb 2018
(iii)Validity of LOI 0.5
(iv)Reference No. of LOI 3061/VII-1/2018/11-soapstone/17
(c)Whether Lease Deed Executed ? No
(i)Reason thereof after ec
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof fresh grant
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 9.756
(b)Depth (in meter) 12
(c)Volume (in Million Cubic meter) 0.0443
12.
Details of Quarry:
(a)Final Void of 9.756 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 10.841
13.
Details of Transportation:
(a)In Pit/Underground to Surface manually
(b)Surface to Siding/Loading haulroad
(c)Transportation / Conveyor Details dumper
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)GRAZING LAND000
(3.)AGRICULTURE LAND10.841010.841
(4.)SETTLEMENTS000
(5.)WASTE LAND000
(6.)SURFACE WATER BODIES000
TOTAL10.841010.841
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)ROADS0000
(3.)EXCAVATION/QUARRY9.756009.756
(4.)TOP SOIL STORAGE0000
(5.)GREEN BELT1.0841001.0841
(6.)INTERNAL OB DUMPS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)VIRGIN AREA0000
TOTAL10.840100010.8401
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 10.841
(d)Safety Zone(in hectare) 1.0841
(e)Final Void of 9.7569 (hectare) at a Depth of 12 meter
    which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 5
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20200.0302010.0302010.0302010.302010
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1922/RA0151
(ii)Name of the EIA Consultant COGNIZANCE RESEARCH INDIA PVT.LTD
(iii)Address GT-20 SECTOR 117 NOIDA U.P
(iv)Mobile No. 9415102339
(v)Landline No. 0522401156
(vi)Email Id sahajsahyog990@gmail.com
(vii)Category of Accreditation B
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 03 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Copy of District Survey Report NA
(h)Uploaded Copy of Replenishment Study Report & Baseline Survey Data NA
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
(1.)20/11/20201.Final EIA report not submitted properly. 2.Proponent rechecked the submitted documents properly.
(2.)24/11/2020The correction have been made as per the instruction received
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManish Nand Kishore
DesignationOwner
Name of Company (Applicant Name should not be given here)MANISH NAND KISHORE
Addressadd- 17 floor maharishi Apartmaent, Bhind civil hosipatal Shahi Bagh,Ahmadabad,Gujrat-30004
Print