Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion in Existing Inorganic Chemical Manufacturing Unit
(b)Name of the Company / Organisation M/S BRITCO PRODUCT
(c)Registered Address Plot No. 3416/1/A, Phase-4, GIDC Chhatral, Taluka: Kalol, District: Gandhinagar,,Gandhinagar,Gujarat-382715
(d)Legal Status of the Company Others
2.
Address for the correspondence:
(a)Name of the Applicant Mahendrabhai Patel
(b)Designation (Owner/ Partner/ CEO) Proprietor
(c)Address Plot No. 3416/1/A, Phase-4, GIDC Chhatral, Taluka. Kalol, District.Gandhinagar,,Kalol,Gandhinagar,Gujarat-382715
(d)Pin code 382715
(e)E-mail britcoproductec@gmail.com
(f)Telephone No. 98243-44791
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a)Major Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Minor Project/ActivityNIL
(c)Category B1
(d)Proposal Number SIA/GJ/IND2/52860/2020
(e)Master Proposal Number(Single Window) SW/177607/2020
(f)EAC concerned (for category A Projects only) Industrial Projects - 2
(g)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 3416/1/A
(b)Pincode 382729
(c)Bounded Latitudes (North)
From
Degree 23.284847
Minutes
Second
From
Degree 23.285028
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.434169
Minutes
Second
From
Degree 72.434456
Minutes
Second
(e)Survey of India Topo Sheet No. F43A7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 68
(h)Uploaded (kml) File Copy of Kml File     
(i)Distance of Nearest HFL from the project boundary within the study area 125
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGandhinagarKalolChhatral
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/GJ/47604/2020
(b)Date of Apply of TOR 11 Apr 2020
(c)Date of Issue of TOR / Standard ToR 16 Apr 2020
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Within notified industrial estate
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Effluent treatment Plant1.5 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Solvent Yellow 15725OthersMT/monthRoad
(2.)Fluorescein25OthersMT/monthRoad
(3.)Ferric Alum150OthersMT/monthRoad
(4.)Zinc Chloride25OthersMT/monthRoad
(5.)Solvent Blue 10425OthersMT/monthRoad
(6.)Solvent Red 13525OthersMT/monthRoad
(7.)Solvent Blue 3525OthersMT/monthRoad
(8.)Aluminium Sulfate100OthersMT/monthRoad
(9.)Aluminium chlorohydrate solution25OthersMT/monthRoad
(10.)Solvent Yellow 3325OthersMT/MonthRoad
(11.)Aluminium Hydroxide50OthersMT/monthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 07 Nov 2019
(iv)Valid Upto 11 Sep 2026
(v)File No. GPCB/CTE-GNR-162/19/ID-72817
(vi)Application No. GPCB/CTE-GNR-162/19/ID-72817
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in crores) 0.2625
(b) Funds Allocated for Environment Management (Capital) (in crores) 0.083
(c) Funds Allocated Towards ESC (Entrepreneur Social Responsibility) (in crores) 0.0264
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in crores) 2.2
(e) Funds Allocated for Environment Management Capital(%) 31.62
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 191.5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 191.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulphuric Acid 98%175OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(2.)Aluminium5.2OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(3.)Aluminium Oxide65.3OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(4.)Caustic.53.33OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(5.)Leuco Quinizarine24.1OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(6.)Zinc Chloride14.73OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(7.)Mesidine25OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(8.)Phthalic Anhydride29.5OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(9.)Alumina hydrate.37.5OthersMT/monthlocalRoad100 Open MarketCopy of Linkage
(10.)Alumina Bauxite37.5OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(11.)HCL (30 %)45.5OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(12.)Quinaldine14.3OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(13.)O-Xylene1.4OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(14.)Toluene6.6OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(15.)Diamino Naphthalene9.6OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(16.)N-Butylamine3.1OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(17.)Quinizarine24.1OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(18.)Tetra butyl ammonium bromide22.7OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(19.)Aluminium Ingots50OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(20.)Resorcinol24.1OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(21.)Ortho Dichloro Benzene (ODCB)2.6OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
(22.)Nitrobenzene4.4OthersMT/monthLocalRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2020
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube68.2255.3664.67100
(2.)NOxMicro Gram per Meter Cube24.5111.5619.6480
(3.)PM2.5Micro Gram per Meter Cube35.4525.7532.4960
(4.)SO2Micro Gram per Meter Cube20.8610.2515.5880
    14.2.     No. of Ground Water Monitoring Locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l12.43.40000
(2.)pHNA7.727.186.58.5
(3.)TDSmg/l1783.245620002000
(4.)Total Hardnessmg/l290152600600
(5.)Fluoridemg/l1.140.731.51.5
(6.)Heavy MetalsZincmg/l0.0110.0071515
(7.)Chloridesmg/l734.5244.6610001000
    14.3.     No. of Surface Water Monitoring Locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l26.218.5E
(2.)DOmg/l3.52.8E
(3.)BODmg/l22A
(4.)pHNA7.647.2A
    14.4.     No. of Ambient Noise Monitoring Locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))71.249.275
(2.)Leq(Night)A-weighted decibels(dB(A))66.944.970
    14.5.     No. of Soil Sample Monitored Locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Othersg/kg0.560.29
(2.)pH8.27.5
(3.)N(Nitrogen)Othersg/kg1.720.89
(4.)P(Phosphorus)Othersg/kg0.590.41
(5.)Electric ConductivityMillisiemens per Centimetreg/kg1.61.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 59.44 To 7.55
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 59.17 To 6.27
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required QuantityDistance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1240 Not Appliacble PipelineOthersGIDCIn process09 Sep 202012
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial1.21.5ETP and EvaporatorOthersEvaporated01.2
(2.)Domestic3.23.5Soak pitOthersSoak Pit03.2
16.1.
(a)Total Waste Water Generation 4.4
(b)Total Discharged Water 4.4
(c)Total Reused Water 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Evaporation SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)76Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Discarded drums/bagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)175Tons50RoadAuthorized Recyclers
(4.)used/spent oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.02Tons50RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10NA68.2200068.22100
(2.)SO2NA20.8600020.8680
(3.)NOxNA24.51000024.5180
(4.)PM2.5NA35.4500035.4560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G.SETDIESEL90.2PM10,SO2,NOx00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 40
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land 0
(b)Private Land 0.0496
(c)Government Land 0
(d)Revenue Land 0
(e)Other Land 0
    Total Land 0.0496
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area 21537
(b)Waste/Barren Land 2215.10
(c)Grazing/ Community Land 2115.47
(d)Surface Water Bodies 338.36
(e)Settlements 2377.9
(f)Industrial 2541.19
(g)Forest 0
(h)Mangroves 0
(i)Marine Area 0
(j)Others : Plantation 289.9
    Total 31414.920000000002
    22.     Land Requirement for Various Activities
S. No.Description of Activity / Facility / Plant / Others OthersLand RequirementRemarks
(1.)Green belt0.015
(2.)OthersOpen Area0.0158
(3.)Main Plant0.0188
Total 0.0496
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Species; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone100None within 10 km
(2.)NPANone100None within 10 km
(3.)ESAsNone100None within 10 km
(4.)ESZsNone100None within 10 km
(5.)Wildlife CorridorsNone100None within 10 km
(6.)CorridorsNone100None within 10 km
(7.)WLSNone100None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone100None within 10 km
(2.)Archaeological SitesNone100None within 10 km
(3.)Defence InstallationsNone100None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0496
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in Rs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 3
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 10
(e)No. of working days 365
(f)Total Manpower 38
32.
Green Belt in Ha:
(a)Total Area of Green Belt (in hectare) 0.005
(b)Percentage of Total Project Area 10.08
(c)No. of Plants to be Planted 15
(d)Funds Allocated for Plantation 10000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Sociallocal employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant High court stay order consultant
39.
Documents to be Attached:
(a.I)Upload Copy of EIA/EMP(Text) Copy of EIA/EMP(Text)
(a.II)Upload Copy of EIA/EMP(Annexures) Report Copy of EIA/EMP(Annexures)
(a.III)Upload Copy of EIA/EMP(Maps/Plans/Figures only) Copy of EIA/EMP(Maps/Plans/Figures only)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(i)Uploaded Additional File Copy of Additional File
(j)Uploaded Proposal Presentation (To be given in EAC/SEIAA/SEAC meeting) NA
(k)Uploaded Updated Form1 NA
           Essential Details Sought
S. No.EDS Sought DateEDS SoughtLetter
NO Record
           Addtional Details Sought
S. No.ADS Sought DateADS SoughtLetter
NO Record
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahendrabhai Patel
DesignationProprietor
Name of Company (Applicant Name should not be given here)M/S BRITCO PRODUCT
AddressPlot No. 3416/1/A, Phase-4, GIDC Chhatral, Taluka: Kalol, District: Gandhinagar
Print